Presentation is loading. Please wait.

Presentation is loading. Please wait.

Item Seamless GDPFS Implementation Plan

Similar presentations


Presentation on theme: "Item Seamless GDPFS Implementation Plan"— Presentation transcript:

1 Item 4-3 - Seamless GDPFS Implementation Plan
Session 4 Item Seamless GDPFS Implementation Plan Sarah Jones/Paul Davies/Yuki Honda Commission for Basic Systems (CBS) Technical Conference 2018 (Geneva, March 2018)

2 Outline Issues Implementation of Seamless GDPFS

3 Issue #1 Development of Implementation plan for Seamless GDPFS References Resolution 11 Cg-17 Decision 55 EC-68 Background Co-chairs of the Steering group have decided to establish a Drafting Team to work on the development of the IP for tabling at EC-70. Progress has been made in this area Rationale for the proposed advice Advice for CBS-MG What By whom Deadline Endorse the proposed draft IP for tabling at EC-70 Co-Chairs of SG S/GDPFS 6 April 2018 Advice on recommendations to EC and Congress To whom (e.g. EC-70, Cg-18, …) Time frame Recommend tabling of the IP at Cg-18 EC-70 June 2018 Recommend to Cg 18 Endorsement of the IP after integrating comments by TECO, CBS MG and other Constituent Bodies Cg-18 June

4

5 Thank you Merci


Download ppt "Item Seamless GDPFS Implementation Plan"

Similar presentations


Ads by Google