Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Opening & Closing.

Similar presentations


Presentation on theme: "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Opening & Closing."— Presentation transcript:

1 Jul 12, 2010 07/12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Opening & Closing Report for September 2016 Date Submitted: September 2016 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: , Re: TG10 (L2R) Opening & Closing Report for September 2016 Abstract: Opening & Closing Report for the TG10 (L2R) Sessions in Warsaw Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Page 1

2 TG10 OPENING REPORT Jul 12, 2010 07/12/10
----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 2

3 Jul 12, 2010 07/12/10 TG10 (L2R) Project: Draft a recommended practice for Layer 2 Routing of Dynamically Changing Mesh Networks. Leadership: Chair – Clint Powell Technical Editor – Verotiana Rabarijaona Secretary – Charlie Perkins ----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 3

4 Participants, Patents, and Duty to Inform
All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws sub-clause 6.2]: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search

5 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at

6 Call for Potentially Essential Patents
If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted

7 Other Guidelines for IEEE WG Meetings
All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details.

8 Meeting Goals Recap July 802.15 Plenary and Current Status
07/12/10 Meeting Goals Recap July Plenary and Current Status Agenda and Mins. Approval Review Scope Review SB Recirc #1 Results Comment Resolution Re-Establish TG10 BRC Prepare WG Motion for Conditional Approval to Proceed to RevCom Review & Update Timeline Next Steps Page 8

9 Jul 12, 2010 07/12/10 TG10 Scope Scope This recommended practice identifies protocols that route packets in a dynamically changing network (changes on the order of a minute time frame), with minimal impact to route handling. The result is an extension of the area of coverage as the number of nodes increase. Page 9

10 TG10 SB Recirc. #1 Results RESPONSE RATE
Jul 12, 2010 07/12/10 TG10 SB Recirc. #1 Results RESPONSE RATE 111 eligible people in this ballot group. 85 votes received = 76% returned (meets 75% min. return rate) 76 affirmative votes 3 total negative votes with comments 1 negative votes with new comments 0 negative votes without comments 6 abstention votes: (Lack of time: 5, Other: 1) APPROVAL RATE The 75% affirmation requirement is being met. 3 negative votes with comments  79 votes = 96% affirmative COMMENTS Rogue Page 10

11 TG10 CLOSING REPORT Jul 12, 2010 07/12/10
----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 11

12 Meeting Status Recap July 802.15 Plenary and Current Status
07/12/10 Meeting Status Recap July Plenary and Current Status Agenda and Mins. Approval Review Scope Review SB Recirc. #1 Results Comment Resolution Re-Establish TG10 BRC Prepare WG Motion for Conditional Approval to Proceed to RevC Review & Update Timeline Next Steps Page 12

13 SB Recirculation #1 Comment Resolution Status
Jul 12, 2010 07/12/10 SB Recirculation #1 Comment Resolution Status TOTAL # OF COMMENTS # SB COMMENTS 39 # TECHNICAL # EDITORIAL/OTHER Resolved Rogue Resolved 100% Resolved Page 13

14 Minutes & Comment Database
Jul 12, 2010 07/12/10 Minutes & Comment Database Minutes - doc. # Comment Database - doc. # Page 14

15 TG10 Timeline (start dates)
Jul 12, 2010 07/12/10 TG10 Timeline (start dates) 1st Sponsor Ballot Recirc. Aug. 2016 2nd Sponsor Ballot Recirc. Sept. 2016 3rd Sponsor Ballot Recirc.* Oct. 2016 EC Approval Oct. 2016 RevCom Approval Dec. 2016 * If needed Page 15

16 Looking Forward Between Now and San Antonio Mtg. in Nov.
Jul 12, 2010 07/12/10 Looking Forward Between Now and San Antonio Mtg. in Nov. 2nd Sponsor Ballot Recirc. 2nd Sponsor Ballot Recirc. Comment Resolution 3rd Sponsor Ballot Recirc. (if needed) Seek Conditional Approval from EC to submit to RevCom At San Antonio Mtg. in Nov. TBD Page 16

17 Looking Forward (cont’d.)
Jul 12, 2010 07/12/10 Looking Forward (cont’d.) After San Antonio Mtg. Seek RevCom Approval Next Update to 802.1 Nov. 2016 Page 17

18 TG10 Motion 1 Motion for TG Approval to Form a TG10 BRC.
Jul 12, 2010 07/12/10 TG10 Motion 1 Motion for TG Approval to Form a TG10 BRC. Move that TG10 request that the WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Balloting of the TG10 draft recommended practice with the following membership: Clint Powell, Verotiana Rabarijaona, Fumihide Kojima, Noriyuki Sato, Kiyoshi Fukui, Soo-Young Chang, Jaehwan Kim, SangSung Choi, Charlie Perkins. The TG10 BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the TG10 draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved: Verotiana Rabarijaona Second: Charlie Perkins Discussion: None Objections: None Page 18

19 Jul 12, 2010 07/12/10 TG10 Motion 2 Motion for WG to Seek Conditional Approval from EC to move to RevCom. Motion: TG410 requests that WG review and approve the CSD [ ] and requests conditional approval from the EC to submit P /D08 (or current revision) to RevCom. Moved: Verotiana Rabarijaona Second: Charlie Perkins Discussion: None Objections: None Page 19

20 TG10 Conference Calls Reminder
Jul 12, 2010 07/12/10 TG10 Conference Calls Reminder TG10 Standing Conference Call Info Day: Mon. Time: 6PM-8PM Mon. (Arizona) AM-Noon Tues. (Japan-JST, Korea) Conf. #: To Be Sent to TG10 Reflector Next Call: Mon. 19th, Sept. Tues. (Japan-JST, Korea) Page 20

21 TG10 Motion 1 to WG Motion for WG Approval to Form TG10 BRC.
Jul 12, 2010 07/12/10 TG10 Motion 1 to WG Motion for WG Approval to Form TG10 BRC. Move that WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Balloting of the TG10 draft recommended practice with the following membership: Clint Powell, Verotiana Rabarijaona, Fumihide Kojima, Noriyuki Sato, Kiyoshi Fukui, Soo-Young Chang, Jaehwan Kim, SangSung Choi, Charlie Perkins. The TG10 BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the TG10 draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved: Clint Powell Second: Discussion: Objections: Page 21

22 TG10 SB History SB SB Reicrc. #1 VOTERS 111 VOTED 84 85 YES 76 ABSTAIN
Jul 12, 2010 07/12/10 TG10 SB History SB SB Reicrc. #1 VOTERS 111 VOTED 84 85 YES 76 ABSTAIN 5 6 NO 3 % VOTERS 75% 76% % YES 96% % ABSTAIN 5% 7% COMMENTS 136 Rogue Page 22

23 TG10 SB Status & Expectations
Jul 12, 2010 07/12/10 TG10 SB Status & Expectations The 2nd Sponsor Ballot recirculation is set to start by Sat., Sept. 20th, and close by Fri., Sept. 30th. Based on the convergence of the # of comments from the initial Sponsor Ballot to the 1st Sponsor Ballot Recirculation very few comments (if any) are expected on the 2nd Sponsor Ballot Recirculation. With that TG10 expects to be able to resolve any comments and start a 3rd recirculation of the Sponsor Ballot by the Oct. 14th (if needed). Furthermore, if for whatever reason a 3rd Sponsor Ballot Recirculation is needed, TG10 anticipates that no further comments would be made on the draft during the recirculation. Page 23

24 Jul 12, 2010 07/12/10 TG10 Motion 2 to WG Motion for WG to Seek Conditional Approval from EC to move to RevCom. Motion: that WG reviewed and approves the CSD [ ] and requests conditional approval from the EC to submit P /D08 (or current revision) to RevCom. Moved: Clint Powell Second: Discussion: Objections: Page 24


Download ppt "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Opening & Closing."

Similar presentations


Ads by Google