Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Opening/Closing.

Similar presentations


Presentation on theme: "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Opening/Closing."— Presentation transcript:

1 Jul 12, 2010 07/12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Opening/Closing Report for January 2017 Date Submitted: January 2017 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: , Re: TG10 (L2R) Opening & Closing Report for January 2017 Abstract: Opening & Closing Report for the TG10 (L2R) Sessions in Atlanta Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Page 1

2 TG10 OPENING REPORT Jul 12, 2010 07/12/10
----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 2

3 Jul 12, 2010 07/12/10 TG10 (L2R) Project: Draft a recommended practice for Layer 2 Routing of Dynamically Changing Mesh Networks. Leadership: Chair – Clint Powell Technical Editor – Verotiana Rabarijaona Secretary – Charlie Perkins ----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 3

4 Participants, Patents, and Duty to Inform
All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws sub-clause 6.2]: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search

5 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at

6 Call for Potentially Essential Patents
If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted

7 Other Guidelines for IEEE WG Meetings
All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details.

8 Meeting Goals Recap November 802.15 Plenary and Current Status
Jul 12, 2010 07/12/10 Meeting Goals Recap November Plenary and Current Status Agenda and Mins. Approval Review Scope Discuss March WNG Presentation Re-Establish TG10 BRC Review & Update Timeline Next Steps Page 8

9 Jul 12, 2010 07/12/10 TG10 Scope Scope This recommended practice identifies protocols that route packets in a dynamically changing network (changes on the order of a minute time frame), with minimal impact to route handling. The result is an extension of the area of coverage as the number of nodes increase. Page 9

10 TG10 CLOSING REPORT Jul 12, 2010 07/12/10
----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 10

11 Meeting Status Recap November 802.15 Plenary and Current Status
Jul 12, 2010 07/12/10 Meeting Status Recap November Plenary and Current Status Agenda and Mins. Approval Review Scope Discuss March WNG Presentation Re-Establish TG10 BRC Review & Update Timeline Next Steps Page 11

12 Jul 12, 2010 07/12/10 Minutes Minutes - doc. # Page 12

13 TG10 Timeline (start dates)
Jul 12, 2010 07/12/10 TG10 Timeline (start dates) RevCom Approval Jan. 2017 IEEE Editing/Publication Prep. Feb/March 2017 Publication March/April 2017 Page 13

14 Looking Forward Between Now and Vancouver Mtg. in March
Jul 12, 2010 07/12/10 Looking Forward Between Now and Vancouver Mtg. in March Respond to any RevCom comments Work with IEEE editor on publication prep. Before, During, or After Vancouver Mtg. in March Publication Page 14

15 TG10 Motion 1 Motion for TG Approval to Form a TG10 BRC.
Jul 12, 2010 07/12/10 TG10 Motion 1 Motion for TG Approval to Form a TG10 BRC. Move that TG10 request that the WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Balloting of the TG10 draft recommended practice with the following membership: Clint Powell, Verotiana Rabarijaona, Fumihide Kojima, Noriyuki Sato, Kiyoshi Fukui, Soo-Young Chang, Jaehwan Kim, SangSung Choi, Charlie Perkins. The TG10 BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the TG10 draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved: Charlie Perkins Second: Fumihide Kojima Discussion: None Objections: None Page 15

16 TG10 Conference Calls Reminder
Jul 12, 2010 07/12/10 TG10 Conference Calls Reminder TG10 Standing Conference Call Info Day: Mon. Time: 6PM-8PM Mon. (Arizona) AM-Noon Tues. (Japan-JST, Korea) Conf. #: To Be Sent to TG10 Reflector Next Call: Mon. 30th, Jan. Tues. (Japan-JST, Korea) Page 16

17 TG10 Motion 1 to WG Motion for WG Approval to Form TG10 BRC.
Jul 12, 2010 07/12/10 TG10 Motion 1 to WG Motion for WG Approval to Form TG10 BRC. Move that WG approve the formation of a Ballot Resolution Committee (BRC) for the Sponsor Balloting of the TG10 draft recommended practice with the following membership: Clint Powell, Verotiana Rabarijaona, Fumihide Kojima, Noriyuki Sato, Kiyoshi Fukui, Soo-Young Chang, Jaehwan Kim, SangSung Choi, Charlie Perkins. The TG10 BRC is authorized to approve comment resolutions and to approve the start of recirculation ballots of the TG10 draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Moved: Clint Powell Second: Discussion: Objections: Page 17


Download ppt "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Opening/Closing."

Similar presentations


Ads by Google