Presentation is loading. Please wait.

Presentation is loading. Please wait.

KFA10 status 20/05/2019 Currently:

Similar presentations


Presentation on theme: "KFA10 status 20/05/2019 Currently:"— Presentation transcript:

1 KFA10 status 20/05/2019 Currently:
Install ion pumps (VSC) – done, pumping Install vacuum gauge (VSC) – done, need TPG (Luis wil check) Install SF6 circuit - ongoing Install entry boxes (KSC) – done Connect HV cables - this week

2 MKDV PFN and Switches status 20/05/2019 – VS, PvT, EC, LD
Present test conditions: Magnet conditioning long pulse 38 kV Actions from sbdsPTM vs. nPTM review Produce two new sbdsPTM pre-series units  launched Optimise nPTM triggering circuit impedance  Diodes ordered, cable being prepared Define equivalent operation voltage for same SEB rate  done (Viliam) Reduce IPOC measurement noise at the beginning of the pulse  partially done (EC) Plan PFN front-cell optimisation  not ready Perform comparative eScan for both type of PTMs (06/2019)  not ready


Download ppt "KFA10 status 20/05/2019 Currently:"

Similar presentations


Ads by Google