Presentation is loading. Please wait.

Presentation is loading. Please wait.

Omāroro Reservoir LEMP Overview

Similar presentations


Presentation on theme: "Omāroro Reservoir LEMP Overview"— Presentation transcript:

1 Omāroro Reservoir LEMP Overview

2 Documentation Issued to CRG
Landscape and Ecology Management Plan (LEMP) – 37 pages LEMP Summary – 15 pages Landscape design drawings Landscape specification Selected civil engineering drawings

3 LEMP Purpose, scope, relationship to suite of construction mgmt. plans
Describes HOW the landscape construction will be managed Ecology Conditions Enabling activities Construction monitoring / hold points Post construction activities Landscape Conditions – vegetation, earthworks, planting, walking tracks, visible infra Construction monitoring

4 Landscape Design Drawings + Spec
Describes WHAT is to be provided in terms of landscape construction scope 100 series – tree removal/protection plan, planting schedules 200 series – general plans, walkway/fencing plans 400 series – details 500 series – planting plans Drawings to be read in conjunction with the specification Specification includes requirements relating to the construction process also (some overlap with LEMP)

5 Civil Drawings Proposed works to the access track between sports fields Timber steps details Timber fence details Gate details Typical walkway details – missing – being added in response to WCC review comment

6 What is missing? Proposed new walkway – Hargreaves St to Papawai Terrace – in design Irrigation of the sports fields – latterly included in scope of the project – in design Papawai stream study (LC.62) – Study being scoped


Download ppt "Omāroro Reservoir LEMP Overview"

Similar presentations


Ads by Google