1 2nd, 3rd & 4th Quarter performance report
Provincial Treasury (Date to be advised) Cape Town A Smit

2 Financial performance

3 2nd Quarter (as at 30 September 2017 )

4 Vote 3 – Provincial Treasury: Expenditure as at 30 September 2017
Programme Name Main budget R’000 Expenditure to date (30 September 2017) Projections to 31 March 2018 Total (Over)/ Under Actual spent to date as percentage of budget Administration 64 825 26 070 34 935 61 005 3 820 40% Sustainable Resource Management 53 801 84 236 2 526 38% Asset Management 59 820 24 051 33 474 57 525 2 295 Financial Governance 42 976 16 541 22 682 39 223 3 753 12 394 39%

5 Programme 1 – Administration: Expenditure as at 30 September 2017
Sub-programme Name Main budget R’000 Expenditure to date (30 September 2017) Projections to 31 March 2018 Total Expenditure (Over)/Under) Actual spent to date as percentage of budget Office of the Minister 6 512 2 811 3 642 6 453 59 43% Management Services 30 148 12 051 14 555 26 606 3 542 40% Financial Management 28 165 11 208 16 738 27 946 219 Total 64 825 26 070 34 935 61 005 3 820

6 Actual spent to date as percentage of budget
Programme 2 - Sustainable Resource Management: Expenditure as at 30 September 2017 Sub-Programme Name Main budget R’000 Expenditure to date (30 September 2017) Projections to 31 March 2018 Total Expenditure (Over)/ Under Actual spent to date as percentage of budget Programme Support 8 937 3 058 5 827 8 885 52 34% Fiscal Policy 29 735 22 003 7 644 29 647 88 74% Budget Management : 19 665 7 536 11 241 18 777 888 38% Provincial Government Budget Management 9 499 3 402 4 927 8 329 1 170 36% Local Government Budget Management 10 166 4 134 6 314 10 448 (282) 41% Public Finance : 82 226 21 204 59 524 80 728 1 498 26% Provincial Government Finance 10 119 4 943 5 206 10 149 (30) 49% Local Government Finance Group 1 10 875 4 216 6 396 10 612 263 39% Local Government Finance Group 2 41 471 3 410 37 871 41 281 190 8% Infrastructure 8 417 3 969 4 047 8 016 401 47% Business Information and Data Management 11 344 4 666 6 004 10 670 674 Total 53 801 84 236 2 526

7 Programme 3 - Asset Management: Expenditure as at 30 September 2017
Sub-Programme Name Main budget R’000 Expenditure to date (30 September 2017) Projections to 31 March 2018 Total Expenditure (Over)/ Under Actual spent to date as percentage of budget Programme Support 4 772 2 107 2 642 4 749 23 44% Supply Chain Management : 28 141 10 753 16 095 26 848 1 293 38% Provincial Government Supply Chain Management 20 663 7 839 12 152 19 991 672 Local Government Supply Chain Management 7 478 2 914 3 943 6 857 621 39% Supporting & Interlinked Financial Systems 26 907 11 191 14 737 25 928 979 42% Total 59 820 24 051 33 474 57 525 2 295 40%

8 Actual spent as percentage of budget
Programme 4 - Financial Governance: Expenditure as at 30 September 2017 Programme Name Main budget R’000 Expenditure to date (30 September 2017) R’000 Projections to 31 March 2018 Total Expenditure (Over)/ Under) Actual spent as percentage of budget Programme Support 7 429 2 304 3 710 6 014 1 415 31% Accounting Services : 21 083 8 862 10 724 19 586 1 497 42% Provincial Government Accounting and Compliance 10 699 4 489 5 752 10 241 458 Local Government Accounting 10 384 4 373 4 972 9 345 1 039 Corporate Governance 14 464 5 375 8 248 13 623 841 37% Total 42 976 16 541 22 682 39 223 3 753 38%

9 3rd Quarter (as at 31 December 2017)

10 Vote 3 – Provincial Treasury: Expenditure as at 31 December 2017
Programme Name Main budget R’000 Adjustment Adjusted budget Expenditure to date (31 December 2017) Projections to 31 March 2018 Total (Over)/ Under Actual spent to date as percentage of budget Administration 64 825 (4 527) 60 298 39 826 20 072 59 898 400 66% Sustainable Resource Management (4 691) 93 143 42 127 602 69% Asset Management 59 820 (6 877) 52 943 35 489 17 451 52 940 3 67% Financial Governance 42 976 (3 496) 39 480 25 808 13 797 39 605 (125) 65% (19 591) 93 447 880 SCOF PROVINCIAL TREASURY 3rd QPR 2017/18

11 Programme 1 – Administration: Expenditure as at 31 December 2017
Sub-programme Name Main budget R’000 Adjustment Adjusted budget Expenditure to date (31 December 2017) Projections to 31 March 2018 Total Expenditure (Over)/Under) Actual spent to date as percentage of budget Office of the Minister 6 512 (1) 6 511 4 111 2 395 6 506 5 63% Management Services 30 148 (3 322) 26 826 17 605 9 124 26 729 97 66% Financial Management 28 165 (1 204) 26 961 18 110 8 553 26 663 298 67% Total 64 825 (4 527) 60 298 39 826 20 072 59 898 400 SCOF PROVINCIAL TREASURY 3rd QPR 2017/18

12 Actual spent to date as percentage of budget
Programme 2 - Sustainable Resource Management: Expenditure as at 31 December 2017 Sub-Programme Name Main budget R’000 Adjustment Adjusted budget Expenditure to date (31 December 2017) Projections to 31 March 2018 Total Expenditure (Over)/ Under Actual spent to date as percentage of budget Programme Support 8 937 (1 964) 6 973 4 688 2 292 6 980 (7) 67% Fiscal Policy 29 735 2 010 31 745 25 423 6 008 31 431 314 80% Budget Management : 19 665 (1 688) 17 977 12 883 5 120 18 003 (26) 72% Provincial Government Budget Management 9 499 (1 129) 8 370 6 164 2 230 8 394 (24) 74% Local Government Budget Management 10 166 (559) 9 607 6 719 2 890 9 609 (2) 70% Public Finance : 82 226 (3 049) 79 177 50 149 28 707 78 856 321 63% Provincial Government Finance 10 119 144 10 263 7 513 2 740 10 253 10 73% Local Government Finance Group 1 10 875 (1 580) 9 295 7 035 2 223 9 258 37 76% Local Government Finance Group 2 41 471 (106) 41 365 22 454 18 876 41 330 35 54% Infrastructure 8 417 (386) 8 031 6 006 1 888 7 894 137 75% Business Information and Data Management 11 344 (1 121) 10 223 7 141 2 980 10 121 102 Total (4 691) 93 143 42 127 602 69% SCOF PROVINCIAL TREASURY 3rd QPR 2017/18

13 Programme 3 - Asset Management: Expenditure as at 31 December 2017
Sub-Programme Name Main budget R’000 Adjustment Adjusted budget Expenditure to date (31 December 2017) Projections to 31 March 2018 Total Expenditure (Over)/ Under Actual spent to date as percentage of budget Programme Support 4 772 (567) 4 205 3 023 1 049 4 072 133 72% Supply Chain Management : 28 141 (5 399) 22 742 14 680 8 075 22 755 (13) 65% Provincial Government Supply Chain Management 20 663 (4 561) 16 102 10 440 5 660 16 100 2 Local Government Supply Chain Management 7 478 (838) 6 640 4 240 2 415 6 655 (15) 64% Supporting & Interlinked Financial Systems 26 907 (911) 25 996 17 786 8 327 26 113 (117) 68% Total 59 820 (6 877) 52 943 35 489 17 451 52 940 3 67% SCOF PROVINCIAL TREASURY 3rd QPR 2017/18

14 Programme 4 - Financial Governance: Expenditure as at 31 December 2017
Programme Name Main budget R’000 Adjustment Adjusted budget Expenditure to date (31 December 2017) Projections to 31 March 2018 Total Expenditure (Over)/ Under) Actual spent as percentage of budget Programme Support 7 429 (1 030) 6 399 3 875 2 500 6 375 24 61% Accounting Services : 21 083 (1 533) 19 550 13 564 5 997 19 561 (11) 69% Provincial Government Accounting and Compliance 10 699 (408) 10 291 7 311 3 005 10 316 (25) 71% Local Government Accounting 10 384 (1 125) 9 259 6 253 2 992 9 245 14 68% Corporate Governance 14 464 (933) 13 531 8 369 5 300 13 669 (138) 62% Total 42 976 (3 496) 39 480 25 808 13 797 39 605 (125) 65% SCOF PROVINCIAL TREASURY 3rd QPR 2017/18

15 4th Quarter (as at 31 March 2018)

16 Vote 3 – Provincial Treasury: Expenditure as at 31 March 2018
Programme Name Main budget R’000 Adjusted Budget Shifting of Funds Virement Final Appropriation R’000 Actual Expenditure R’000 Variance R’000 Expenditure as % of final appropriation Administration 64 825 60 298 - (121) 60 177 57 492 2 685 95.5% Sustainable Resource Management 156 3 833 97.2% Asset Management 59 820 52 943 368 53 311 51 023 2 288 95.7% Financial Governance 42 976 39 480 (403) 39 077 37 434 1 643 95.8% Total 10 449 96.4%

17 Programme 1 – Administration: Expenditure as at 31 March 2018
Sub-programme Name Main budget R’000 Adjusted Budget Shifting of Funds Virement Final Appropriation R’000 Actual Expenditure R’000 Variance R’000 Expenditure as % of final appropriation Office of the Minister 6 512 6 511 - 6 078 433 93.3% Management Services 30 148 26 826 25 100 1 726 93.6% Financial Management 28 165 26 961 (121) 26 840 26 314 526 98.0% Total 64 825 60 298 60 177 57 492 2 685 95.5%

18 Programme 2 - Sustainable Resource Management: Expenditure as at 31 March 2018
Sub-Programme Name Main budget R’000 Adjusted Budget Shifting of Funds Virement Final Appropriation R’000 Actual Expenditure R’000 Variance R’000 Expenditure as % of final appropriation Programme Support 8 937 6 973 31 - 7 004 6 343 661 90.6% Fiscal Policy 29 735 31 745 (31) 31 714 30 972 742 97.7% Budget Management : 19 665 17 977 17 338 639 96.4% Provincial Government Budget Management 9 499 8 370 8 037 333 96% Local Government Budget Management 10 166 9 607 9 301 306 96.8% Public Finance : 82 226 79 177 156 79 333 77 542 1 791 Provincial Government Finance 10 119 10 263 10 035 228 97.8% Local Government Finance Group 1 10 875 9 295 9 451 9 463 (12) 100.1% Local Government Finance Group 2 41 471 41 365 40 297 1 068 97.4% Infrastructure 8 417 8 031 7 829 202 97.5% Business Information and Data Management 11 344 10 223 9 918 305 97% Total 3 833 97.2%

19 Programme 3 - Asset Management: Expenditure as at 31 March 2018
Sub-Programme Name Main budget R’000 Adjusted Budget Shifting of Funds Virement Final Appropriation R’000 Actual Expenditure R’000 Variance R’000 Expenditure as % of final appropriation Programme Support 4 772 4 205 (67) (25) 4 113 3 727 386 90.6% Supply Chain Management : 28 141 22 742 67 393 23 202 22 792 410 98.2% Provincial Government Supply Chain Management 20 663 16 102 - 16 495 16 251 244 98.5% Local Government Supply Chain Management 7 478 6 640 6 707 6 541 99 97.5% Supporting & Interlinked Financial Systems 26 907 25 996 24 504 1 492 94.3% Total 59 820 52 943 368 53 311 51 023 2 288 95.7%

20 Programme 4 - Financial Governance: Expenditure as at 31 March 2018
Programme Name Main budget R’000 Adjusted Budget Shifting of Funds Virement Final Appropriation R’000 Actual Expenditure R’000 Variance R’000 Expenditure as % of final appropriation Programme Support 7 429 6 399 (22) - 6 377 5 741 636 90.0% Accounting Services : 21 083 19 550 22 25 19 597 18 873 724 96.3% Provincial Government Accounting and Compliance 10 699 10 291 10 338 9 786 552 94.7% Local Government Accounting 10 384 9 259 9 087 172 98.1% Corporate Governance 14 464 13 531 (428) 13 103 12 820 283 97.8% Total 42 976 39 480 (403) 39 077 37 434 1 643 95.8%

21 Non-Financial performance

22 OVERVIEW The Department submitted their 2nd Quarter report complying with the DPME submission date. Forty three (43) 2nd quarter targets were planned of which Forty two (42) targets were achieved. Overall achievement of ninety seven per cent (97%) for the 2nd quarter. One (1) target or (3%) of targets were partially achieved SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

23 OVERVIEW The Department submitted their 3rd Quarter report complying with the DPME submission date. Forty five (45) 3rd quarter targets were planned, of which Forty (40) targets were achieved. Overall achievement of eighty nine per cent (89%) for the 3rd quarter. One (1) target or (2%) of targets was partially achieved. Four (4) or (9%) of targets were not achieved. SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

24 OVERVIEW SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

25 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Key: Between 0 – 49 % delivery = Red; 50% – 79% delivery = Yellow; % delivery = Green SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

26 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Key: Between 0 – 49 % delivery = Red; 50% – 79% delivery = Yellow; % delivery = Green SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

27 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Key: Between 0 – 49 % delivery = Red; 50% – 79% delivery = Yellow; % delivery = Green SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

28 2nd Quarter

29 PROGRAMME 1 PERFORMANCE - ADMINISTRATION
ACHIEVEMENTS Administration achieved seven (7) of the seven (7) 2nd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None None BUDGET EXPENDITURE 40 % of the budget was spent for the period 01 April – September 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

30 PROGRAMME 2 PERFORMANCE - SUSTAINABLE RESOURCE MANAGENT
ACHIEVEMENTS Sustainable Resource Management achieved fourteen (14) of the fourteen (14) 2nd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None None BUDGET EXPENDITURE 38 % of the budget was spent for the period 01 April – September 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

31 PROGRAMME 3 PERFORMANCE – Asset Management
ACHIEVEMENTS Asset Management achieved thirteen (13) of the thirteen (13) 2nd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None None BUDGET EXPENDITURE 40 % of the budget was spent for the period 01 April – September 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

32 PROGRAMME 4 PERFORMANCE - FINANCIAL GOVERNANCE
ACHIEVEMENTS Financial Governance achieved eight (8) of the nine (9) 2nd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets One (1) NON ACHIEVEMENTS None None BUDGET EXPENDITURE 38 % of the budget was spent for the period 01 April – September 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

33 3rd Quarter

34 PROGRAMME 1 PERFORMANCE - ADMINISTRATION
ACHIEVEMENTS Administration achieved seven (7) of the eight (8) 3rd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets One (1) NON ACHIEVEMENTS None None BUDGET EXPENDITURE 66 % of the budget was spent for the period 01 April – December 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

35 PROGRAMME 2 PERFORMANCE - SUSTAINABLE RESOURCE MANAGENT
ACHIEVEMENTS Sustainable Resource Management achieved sixteen (16) of the nineteen (19) 3rd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None Three (3) BUDGET EXPENDITURE 69 % of the budget was spent for the period 01 April – December 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

36 PROGRAMME 3 PERFORMANCE – Asset Management
ACHIEVEMENTS Asset Management achieved eleven (11) of the eleven (11) 3rd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None None BUDGET EXPENDITURE 67 % of the budget was spent for the period 01 April – December 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

37 PROGRAMME 4 PERFORMANCE - FINANCIAL GOVERNANCE
ACHIEVEMENTS Financial Governance achieved six (6) of the seven (7) 3rd quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None None BUDGET EXPENDITURE 65 % of the budget was spent for the period 01 April – December 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

38 4th Quarter

39 PROGRAMME 1 PERFORMANCE - ADMINISTRATION
ACHIEVEMENTS Administration achieved seven (7) of the eight (8) 4th quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets One (1) NON ACHIEVEMENTS None None BUDGET EXPENDITURE 95 % of the budget was spent for the period 01 April – March 2018 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

40 PROGRAMME 2 PERFORMANCE - SUSTAINABLE RESOURCE MANAGENT
ACHIEVEMENTS Sustainable Resource Management achieved nineteen (19) of the nineteen (19) 4th quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None None BUDGET EXPENDITURE 97 % of the budget was spent for the period 01 April – March 2018 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

41 PROGRAMME 3 PERFORMANCE – Asset Management
ACHIEVEMENTS Asset Management achieved twelve (12) of the thirteen (13) 4th quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets One (1) NON ACHIEVEMENTS None None BUDGET EXPENDITURE 96 % of the budget was spent for the period 01 April – March 2018 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

42 PROGRAMME 4 PERFORMANCE - FINANCIAL GOVERNANCE
ACHIEVEMENTS Financial Governance achieved nine (9) of the nine (9) 4th quarter planned targets PARTIAL ACHIEVEMENTS Administration achieved 6 of the st quarter planned targets None NON ACHIEVEMENTS None None BUDGET EXPENDITURE 95 % of the budget was spent for the period 01 April – March 2018 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

43 Programme 1

44 Ministry

45 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend PROGRAMME 1: ADMINISTRATION R64 825 R26 070 40% 1.1 Office of the Minister R6 512 R2 811 43%  1.1 Number of formal engagements with the Department on meeting statutory and executive requirements 8 2 Achieved 100% None 4  1.2 Number of formal engagements with the Western Cape and Racing Gambling Board on meeting statutory and executive requirements 1  1.3 Number of formal meetings/engagements with the Consul General, members of the Diplomatic Corp and incoming foreign delegations 7 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

46 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend PROGRAMME 1: ADMINISTRATION R60 298 R39 826 66% 1.1 Office of the Minister R6 511 R4 111 63%  1.1 Number of formal engagements with the Department on meeting statutory and executive requirements 8 2 Achieved 100% None 6  1.2 Number of formal engagements with the Western Cape and Racing Gambling Board on meeting statutory and executive requirements 4 1 3  1.3 Number of formal meetings/engagements with the Consul General, members of the Diplomatic Corp and incoming foreign delegations 7 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

47 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend PROGRAMME 1: ADMINISTRATION R60 298 R57 492 95% 1.1 Office of the Minister R6 511 R6 078 93%  1.1 Number of formal engagements with the Department on meeting statutory and executive requirements 8 2 Achieved 100% None  1.2 Number of formal engagements with the Western Cape and Racing Gambling Board on meeting statutory and executive requirements 4 1  1.3 Number of formal meetings/engagements with the Consul General, members of the Diplomatic Corp and incoming foreign delegations 7 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

48 SOMS

49 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 1.2 Management Services R30 148 R12 051 40%  2.1 Number of prescribed performance plans and reports submitted 7 2 Achieved 100% None 3  2.2 Number of reports on the implementation of the Workforce Plan 4 1 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

50 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 1.2 Management Services R26 826 R17 605 66%  2.1 Number of prescribed performance plans and reports submitted 7 1 Achieved 100% None 4  2.2 Number of reports on the implementation of the Workforce Plan 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

51 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 1.2 Management Services R26 826 R25 100 94%  2.1 Number of prescribed performance plans and reports submitted 7 3 2 Partially Achieved 67% 1 Evaluation Report not finalised due to the longer than planned time taken to finalise Terms of reference and the appointing of a service provider. 6  2.2 Number of reports on the implementation of the Workforce Plan 4 1 Achieved 100% None SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

52 Financial Management

53 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 1.3 Financial Management R28 165 R11 208 40%  3.1 Number of IYM reports 12 3 Achieved 100% None 6  3.2 Number of Budget submissions 4 1 3.3 Number of Corporate reports - SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

54 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 1.4 Financial Management R R18 110 67%  3.1 Number of IYM reports 12 3 Achieved 100% None 9  3.2 Number of Budget submissions 4 2 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

55 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 1.4 Financial Management continue R26 961 R18 110 67% 3.3 Number of Corporate reports 4 2 1 Partially Achieved 50% Although there was a target of 2 scheduled for this quarter only 1 CGRO report was prepared; as the one of the targets was achieved in the previous quarter (see validated). The targets were originally planned to coincide with the outcomes of the AGSA Regularity Audit. However; the information was available earlier than expected hence one of the reports was compiled a quarter earlier than scheduled 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

56 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 1.3 Financial Management R26 961 R26 314 98%  3.1 Number of IYM reports 12 3 Achieved 100% None  3.2 Number of Budget submissions 4 1 3.3 Number of Corporate reports SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

57 Programme 2

58 Programme Support

59 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend PROGRAMME 2: SUSTAINABLE RESOURCE MANAGEMENT R R53 801 38% 2.1 Programme Support R8 937 R3 058 34%  4.1 Number of quarterly performance reports for Programme 2 – Sustainable Resource Management submitted 4 1 Achieved 100 % None 2 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

60 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend PROGRAMME 2: SUSTAINABLE RESOURCE MANAGEMENT R R93 143 69% 2.1 Programme Support R6 973 R4 688 67%  4.1 Number of quarterly performance reports for Programme 2 – Sustainable Resource Management submitted 4 1 Achieved 100 % None 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

61 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend PROGRAMME 2: SUSTAINABLE RESOURCE MANAGEMENT R R 97% 2.1 Programme Support R6 973 R6 343 91%  4.1 Number of quarterly performance reports for Programme 2 – Sustainable Resource Management submitted 4 1 Achieved 100 % None SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

62 Fiscal Policy

63 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 207/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 2.2 Fiscal Policy R29 735 R22 003 74%  5.1 Number of research reports on the Provincial and Local Government Fiscal System 4 1 Achieved 100% None  5.2 Number of Provincial Revenue reports 2 5.3 Number of Cash Management Reports 8 5.4 Number of reports on the performance of the WCGRB SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

64 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 207/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.2 Fiscal Policy R31 745 R25 423 80%  5.1 Number of research reports on the Provincial and Local Government Fiscal System 4 1 Achieved 100% None 3  5.2 Number of Provincial Revenue reports 5.3 Number of Cash Management Reports 8 2 6 5.4 Number of reports on the performance of the WCGRB SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

65 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.2 Fiscal Policy R31 745 R30 972 98%  5.1 Number of research reports on the Provincial and Local Government Fiscal System 4 2 Achieved 100% None  5.2 Number of Provincial Revenue reports 1 5.3 Number of Cash Management Reports 8 5.4 Number of reports on the performance of the WCGRB SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

66 Provincial Government Budget Office

67 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 2.3 Provincial Government Budget Office R9 499 R3 402 36%  6.1 Number of provincial budget policy assessment reports 28 - (non-cumulative  6.2 Timeous publication of the Provincial Economic Review and Outlook October 2017 (non-cumulative) 6.3 Timeous publication of the Medium Term Budget Policy Statement November 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

68 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.3 Provincial Government Budget Office R8 370 R6 164 74%  6.1 Number of provincial budget policy assessment reports 28 14 Achieved 100% None (non-cumulative  6.2 Timeous publication of the Provincial Economic Review and Outlook October 2017 September 2017 Not achieved - The change of parliamentary schedules to an earlier date and as a result the 2nd quarter validation has indicated that the targets were actually achieved in a previous quarter (non-cumulative) SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

69 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.3 Provincial Government Budget Office continue R8 370 R6 164 74% 6.3 Timeous publication of the Medium Term Budget Policy Statement November 2017 Achieved 100% None (non-cumulative) SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

70 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.3 Provincial Government Budget Office R8 370 R8 037 96%  6.1 Number of provincial budget policy assessment reports 28 14 Achieved 100% None  6.2 Timeous publication of the Provincial Economic Review and Outlook October 2017 - November 2017(non-cumulative) SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

71 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.3 Provincial Government Budget Office continue R8 370 R8037 96% 6.3 Timeous publication of the Medium Term Budget Policy Statement November 2017 - 29 September 2017 (non-cumulative) SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

72 Local Government Budget Office

73 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 2.3 Local Government Budget Office R10 166 R4 134 41%  7.1 Number of municipal budget policy assessment reports 30 - 30 (non- cumulative)  7.2 Percentage Quarterly Performance Reports received, assessed 100% Achieved None 100 % (non- cumulative) 7.3 Timeous publication of the Municipal Economic Review and Outlook October 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

74 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.3 Local Government Budget Office R9 607 R6 719 70%  7.1 Number of municipal budget policy assessment reports 30 - 30 (non- cumulative)  7.2 Percentage Quarterly Performance Reports received, assessed 100% Achieved None 100 % (non- cumulative) 7.3 Timeous publication of the Municipal Economic Review and Outlook October 2017 Not Achieved The change of parliamentary schedules to an earlier date and as a result the 2nd quarter validation has indicated that the targets were actually achieved in a previous quarter SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

75 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.3 Local Government Budget Office R9 607 R9 301 97%  7.1 Number of municipal budget policy assessment reports 30 - 30 (non- cumulative)  7.2 Percentage Quarterly Performance Reports received, assessed 100% Achieved None 100 % (non- cumulative) 7.3 Timeous publication of the Municipal Economic Review and Outlook October 2017 29 September (non-cumulative) SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

76 Provincial Government Finance

77 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend 2.4 Provincial Government Finance  R10 119 R4 943 49%  8.1 Number of provincial budget efficiency reports 28 -  8.2 Number of expenditure reviews 1 8.3 Number of quarterly reports on the implementation of the budget 4 Achieved 100% None 2 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

78 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.4 Provincial Government Finance  R10 263 R7 513 73%  8.1 Number of provincial budget efficiency reports 28 14 Achieved 100% None  8.2 Number of expenditure reviews 1 - 8.3 Number of quarterly reports on the implementation of the budget 4 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

79 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.4 Provincial Government Finance  R10 263 R10 035 98%  8.1 Number of provincial budget efficiency reports 28 14 Achieved 100% None  8.2 Number of expenditure reviews 1 8.3 Number of quarterly reports on the implementation of the budget 4 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

80 Local Government Finance

81 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 2.4 Local Government Finance  R52 346 R7 626 14%  9.1 Number of monthly IYM assessment reports on the implementation of the municipal budget 372 93 Achieved 100% None 186  9.2 Number of Municipal budget assessment reports 30 - 30 (non-cumulative) 9.3 Number of reports on MFMA implementation 4 1 2 9.4 Number of efficiency assessments on selected municipal budget expenditure items SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

82 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.4 Local Government Finance  R50 660 R29 489 56%  9.1 Number of monthly IYM assessment reports on the implementation of the municipal budget 372 93 Achieved 100% None 279  9.2 Number of Municipal budget assessment reports 30 - 30 (non-cumulative) 9.3 Number of reports on MFMA implementation 4 1 3 9.4 Number of efficiency assessments on selected municipal budget expenditure items SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

83 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.4 Local Government Finance  R50 660 R49 760 98%  9.1 Number of monthly IYM assessment reports on the implementation of the municipal budget 372 93 Achieved 100% None  9.2 Number of Municipal budget assessment reports 30 - 30 (non-cumulative) 9.3 Number of reports on MFMA implementation 4 1 9.4 Number of efficiency assessments on selected municipal budget expenditure items SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

84 Infrastructure

85 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 2.4 Infrastructure R8 417 R3 969 47%  10.1 Number of asset management plans assessed 28 14 Achieved 100% None  10.2 Number of infrastructure expenditure reports assessed 72 18 36 10.3 Number of infrastructure project delivery assessments 10 5 10.4 Number of quarterly reports on the implementation of infrastructure budgets to Cabinet 4 1 2 10.5 Number of developed and tested municipal infrastructure delivery management system(s) in selected municipalities - SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

86 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.4 Infrastructure R8 031 R6 006 75%  10.1 Number of asset management plans assessed 28 -  10.2 Number of infrastructure expenditure reports assessed 72 18 Achieved 100% None 54 10.3 Number of infrastructure project delivery assessments 10 5 1 Partially achieved The 4 of the 5 deliverables rescheduled to the 4th quarter due to operational requirements. 10.4 Number of quarterly reports on the implementation of infrastructure budgets to Cabinet 4 3 10.5 Number of developed and tested municipal infrastructure delivery management system(s) in selected municipalities SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

87 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.4 Infrastructure R8 031 R7 829 97%  10.1 Number of asset management plans assessed 28 14 16 Achieved 114% Two of the public entities also submitted asset management plans to comply with GIAM Act, which were assessed. 30  10.2 Number of infrastructure expenditure reports assessed 72 18 21 116% The Department of Social Development was not planned for in the 2017/18 financial year. However, subsequent to the planning they have received a DORA grant of which PT has to conduct assessments on the expenditure of the grant. Hence the overachievement. 75 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

88 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.4 Infrastructure R8 031 R7 829 97% 10.3 Number of infrastructure project delivery assessments 10 4 - Those outstanding projects which were due in Q3 have been included in this submission. 10.4 Number of quarterly reports on the implementation of infrastructure budgets to Cabinet 1 Achieved 100% None 10.5 Number of developed and tested municipal infrastructure delivery management system(s) in selected municipalities SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

89 Business Information Data Management

90 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend 2.4 Business Information and Data Management R11 344 R4 666 41%  11.1 Number of datasets managed 4 Achieved 100% None 4 (non-cumulative)  11.2 Number of budget process plans managed 3 1 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

91 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 2.4 Business Information and Data Management R10 223 R7 141 70%  11.1 Number of datasets managed 4 Achieved 100% None 4 (non-cumulative)  11.2 Number of budget process plans managed 3 1 2 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

92 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 2.4 Business Information and Data Management R10 223 R9 918 97%  11.1 Number of datasets managed 4 Achieved 100% None 4 (non-cumulative)  11.2 Number of budget process plans managed 3 1 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

93 Programme 3

94 Programme Support

95 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend PROGRAMME 3: ASSET MANAGEMENT R59 820 R24 051 40% 3.1 Programme Support R4 772 R2 107  44%  12.1 Number of quarterly performance reports for Programme 3 – Asset Management submitted 4 1 Achieved 100% None 2 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

96 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend PROGRAMME 3: ASSET MANAGEMENT R52 489 R35 489 67% 3.1 Programme Support R4 205 R3 023  72%  12.1 Number of quarterly performance reports for Programme 3 – Asset Management submitted 4 1 Achieved 100% None 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

97 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend PROGRAMME 3: ASSET MANAGEMENT R52 943 R51 023 96% 3.1 Programme Support R4 205 R3 727  89%  12.1 Number of quarterly performance reports for Programme 3 – Asset Management submitted 4 1 Achieved 100% None SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

98 Provincial Government Supply Chain Management

99 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend 3.2 Supply Chain Management: Provincial Government R20 663 R7 839 38%  13.1 Number of interventions performed to assist departments with the continuous improvements of their supply chain and asset management systems 26 8 Achieved 225% The preferential procurement Regulations, 2017 were issued by NT that became effective as from 01 April Sessions were held with Department on WCG stance and Cabinet decisions. 17 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

100 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend 3.2 Supply Chain Management: Provincial Government continue R20 663 7 839 38%  13.2 Number of SCM/AM and SCM Systems assessment reports 169 43 44 Achieved 102% 1 Additional verification concluded at the departments request to move the assessment forward. This will not effect the overall achievement for the year in the long term as the overachievement is for the quarter. 86 13.3 Number of Interventions for strategic sourcing implementation 3 1 100% None SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

101 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend 3.2 Supply Chain Management: Provincial Government continue R20 663 7 839 38% 13.4 Number of supplier engagement sessions held to develop and educate suppliers 12 4 5 Achieved 125% 1 additional verification concluded at the department’s request to move the assessment forward. This will not affect the everall achievement for the year in the long term as the overachievement is for the quarter. 10 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

102 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December (R’000) % spend 3.2 Supply Chain Management: Provincial Government R16 102 R10 440 65%  13.1 Number of interventions performed to assist departments with the continuous improvements of their supply chain and asset management systems 26 8 Achieved 100% None 25 13.2 Number of SCM/AM and SCM Systems assessment reports 169 43 129 13.3 Number of Interventions for strategic sourcing implementation 3 - SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

103 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December (R’000) % spend 3.2 Supply Chain Management: Provincial Government continue R16 102 R 65% 13.4 Number of supplier engagement sessions held to develop and educate suppliers 12 4 Achieved 100% In order to be responsive to the high demand and in the absence of a dedicated centre to register suppliers on the CSD, a management decision was made to assist suppliers with registration on the ground floor at 4 Dorp Street. It's to manage the provincial risk profile on the CSD. Attendance registers attached as proof. 14 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

104 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 3.2 Supply Chain Management: Provincial Government R16 102 R16 251 101%  13.1 Number of interventions performed to assist departments with the continuous improvements of their supply chain and asset management systems 26 6 Achieved 100% None 31 13.2 Number of SCM/AM and SCM Systems assessment reports 169 42 41 Partially Achieved 98 1 assessment concluded in Q1 at the department requested to move the assessment forward. Number of assessment reports validated changed as one assessment report was erroneously included in the 3rd quarter preliminary as it was finalised and reported in quarter 2. SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

105 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 3.2 Supply Chain Management: Provincial Government continue R16 102 R16 251 101% 13.3 Number of Interventions for strategic sourcing implementation 3 2 Achieved 100% None 13.4 Number of supplier engagement sessions held to develop and educate suppliers 12 1 150% 1 x Additional intervention as per request from DEDAT co-participating at Supplier initiatives. 13 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

106 Local Government Supply Chain Management

107 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 3.2 14.1 Supply Chain Management: Local Government  R7 478 R2 914 39% Number of municipal SCM and MAM Virtuous Cycle assessment reports 10 4 Achieved 100% None 6 14.2 Number of municipalities assisted with the implementation of the model policy for infrastructure procurement 14.3 Number of Structured municipal training interventions 12 14.4 Number of municipalities assisted with asset management training interventions 5 2 14.5 Number of Municipal Districts assisted with the localisation of procurement SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

108 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 3.2 14.1 Supply Chain Management: Local Government  R6 640 R4 240 64% Number of municipal SCM and MAM Virtuous Cycle assessment reports 10 2 Achieved 100% None 8 14.2 Number of municipalities assisted with the implementation of the model policy for infrastructure procurement 14.3 Number of Structured municipal training interventions 12 3 14.4 Number of municipalities assisted with asset management training interventions 5 4 14.5 Number of Municipal Districts assisted with the localisation of procurement SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

109 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 3.2 14.1 Supply Chain Management: Local Government  R6 640 R6 541 99% Number of municipal SCM and MAM Virtuous Cycle assessment reports 10 2 Achieved 100% None 14.2 Number of municipalities assisted with the implementation of the model policy for infrastructure procurement 14.3 Number of Structured municipal training interventions 12 13 14.4 Number of municipalities assisted with asset management business processes 5 1 14.5 Number of Municipal Districts assisted with the localisation of procurement SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

110 Supporting & Interlinked Financial Systems

111 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend 3.4 Supporting and Interlinked Financial Systems R26 907 R11 191 42%  15.1 Number of institutions provided user account management service i.r.o provincially operated financial systems 147 Achieved 100% None 147 (non-cumulative) 15.2 Number of votes assisted with planning and preparation i.r.o all provincially operated financial systems for migration to the IFMS 2 1  15.3 Number of votes assisted in providing and analysing data 14 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

112 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 3.4 Supporting and Interlinked Financial Systems R25 996 R17 786 68%  15.1 Number of institutions provided user account management service i.r.o provincially operated financial systems 147 Achieved 100% None 147 (non-cumulative) 15.2 Number of votes assisted with planning and preparation i.r.o all provincially operated financial systems for migration to the IFMS 2 -  15.3 Number of votes assisted in providing and analysing data 14 4 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

113 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 3.4 Supporting and Interlinked Financial Systems R25 996 R24 504 94%  15.1 Number of institutions provided user account management service i.r.o provincially operated financial systems 147 Achieved 100% None 147 (non-cumulative) 15.2 Number of votes assisted with planning and preparation i.r.o all provincially operated financial systems for migration to the IFMS 2 1  15.3 Number of votes assisted in providing and analysing data 14 7 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

114 Programme 4

115 Programme Support

116 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend PROGRAMME 4: FINANCIAL GOVERNANCE R42 976 R16 541 38% 4.1 Programme Support R7 429  R2 304 31%  16.1 Number of quarterly performance reports for Programme 4 – Financial Management 4 1 Achieved 100 % None 2 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

117 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend PROGRAMME 4: FINANCIAL GOVERNANCE R39 480 R25 808 65% 4.1 Programme Support R6 399  R3 875 61%  16.1 Number of quarterly performance reports for Programme 4 – Financial Management 4 1 Achieved 100 % None 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

118 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend PROGRAMME 4: FINANCIAL GOVERNANCE R39 480 R37 434 95% 4.1 Programme Support R6 399  R5 741 90%  16.1 Number of quarterly performance reports for Programme 4 – Financial Governance submitted 4 1 Achieved 100 % None SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

119 Local Government Accounting

120 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 4.2 Accounting Services: Local Government Accounting  R10 384 R4 373 42%  17.1 Number of municipalities assessed with the accounting reporting framework 30 29 Partially Achieved 97% Kannaland Municipality has not submitted 2016/17 AFS for review. 29(non-cumulative) 17.2 Number of Reports submitted for MGRO engagements including progress mSCOA -  17.3 Number of Reports submitted for MTEC engagements 30(non-cumulative) SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

121 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 4.2 Accounting Services: Local Government Accounting  R9 259 R6 253 68%  17.1 Number of municipalities assessed with the accounting reporting framework 30 - Kannaland did not submit their 2016/17 AFS for review in the 2nd Quarter. The AFS was received and reviewed in the 3rd quarter, hence the over achievement in quarter 3 30(non-cumulative) 17.2 Number of Reports submitted for MGRO engagements including progress mSCOA  17.3 Number of Reports submitted for MTEC engagements SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

122 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 4.2 Accounting Services: Local Government Accounting  R9 259 R9 087 98%  17.1 Number of municipalities supported with the accounting reporting framework 30 - 30(non-cumulative) 17.2 Number of Reports submitted for MGRO engagements including progress on mSCOA Achieved 100% None  17.3 Number of Reports submitted for MTEC engagements SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

123 Provincial Government Accounting & Compliance

124 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per Annual APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September (R’000) % spend 4.2 Accounting Services: Provincial Government Accounting and Compliance R10 699 R4 489 42%  18.1 Number of votes assessed with the applicable accounting and norms and standards requirements 14 Achieved 100% None 14 (non-cumulative) 18.2 Number of accounting training interventions 5 1 2  18.3 Timeous Publication and tabling of the ACFS 1 month after receipt of audited AFS - 18.4 Number of CGRO assessment reports coordinated per vote 4 18.5 Number of quarterly governance engagements with departments SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

125 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per Annual APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 4.2 Accounting Services: Provincial Government Accounting and Compliance R10 291 R7 311 71%  18.1 Number of votes assessed with the applicable accounting and norms and standards requirements 14 Achieved 100% None 14 (non-cumulative) 18.2 Number of accounting training interventions 5 1 3  18.3 Timeous Publication and tabling of the ACFS 1 month after receipt of audited AFS Audit finalised but ACFS document still to be printed and reviewed by AGSA. Not achieved - Late finalisation of audit of the ACFS caused delay in tabling and publishing. SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

126 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per Annual APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – December 2017 (R’000) % spend 4.2 Accounting Services: Provincial Government Accounting and Compliance continue R10 291 R7 311 71% 18.4 Number of CGRO assessment reports coordinated per vote 4 1 Achieved 100% None 3 18.5 Number of quarterly governance engagements with departments 2 - SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

127 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per Annual APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 4.2 Accounting Services: Provincial Government Accounting and Compliance R10 291 R9 786 95%  18.1 Number of votes assessed with the applicable accounting and norms and standards requirements 14 Achieved 100% None 14 (non-cumulative) 18.2 Number of accounting training interventions 5 2 3 150% Additional training on the MCS facilitated for departments to improve on the interpretation of accounting frameworks 6  18.3 Timeous Publication and tabling of the ACFS 1 month after receipt of audited AFS - Audited ACFS tabled on 29 January 2018 AGSA's audit report on the ACFS only received on 15 December 2017 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

128 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per Annual APP 4th Quarter Planned output as per APP 4th Quarter Preliminary output 4th Q Achieved (on/above target) Partially achieved/ Not achieved Q4 % Achieved Q4 Comments Cumulative performance (4th Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 4.2 Accounting Services: Provincial Government Accounting and Compliance continue R10 291 R9 786 95% 18.4 Number of CGRO assessment reports coordinated per vote 4 1 Achieved 100% None 18.5 Number of quarterly governance engagements with departments 2 - SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

129 Corporate Government

130 SUMMARY OF THE 2nd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 2nd Quarter Planned output as per APP 2nd Quarter Preliminary output 2nd Q Achieved (on/above target) Partially achieved/ Not achieved Q2 % Achieved Q2 Comments Cumulative performance (2nd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 4.3 Corporate Governance R14 464 R5 375 37%  19.1 Number of municipalities support initiatives on integrated capacity building and training 10 3 Achieved 100% None 6 19.2 Number of MGRO assessment reports coordinated 28 -  19.3 Number of municipal support initiatives on Governance, Risk and Control 12 4 19.4 Number of municipalities and departments supported with financial delegations framework and policies SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

131 SUMMARY OF THE 3rd QUARTER PERFORMANCE 2017/18
Programme / Subprogramme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – September 2017 (R’000) % spend 4.3 Corporate Governance R13 531 R8 369 62%  19.1 Number of municipalities support initiatives on integrated capacity building and training 10 2 Achieved 100% None 8 19.2 Number of MGRO assessment reports coordinated 28 -  19.3 Number of municipal support initiatives on Governance, Risk and Control 12 4 19.4 Number of municipalities and departments supported with financial delegations framework and policies 6 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

132 SUMMARY OF THE 4th QUARTER PERFORMANCE 2017/18
Programme / Sub-programme / Performance Measures Target for 2017/18 as per APP 3rd Quarter Planned output as per APP 3rd Quarter Preliminary output 3rd Q Achieved (on/above target) Partially achieved/ Not achieved Q3 % Achieved Q3 Comments Cumulative performance (3rd Q) Adjusted Budget/ Expenditure April 2017 – March 2018 (R’000) % spend 4.3 Corporate Governance R13 531 R12 820 95%  19.1 Number of municipal support initiatives on integrated capacity building and training 10 2 Achieved 100% None 19.2 Number of municipal MGRO assessment reports 28  19.3 Number of municipal support initiatives on Governance, Risk and Control 12 19.4 Number of municipalities and departments supported with financial delegations framework and policies 6 3 SCOF PROVINCIAL TREASURY 2nd, 3rd & 4th QPR 2017/18

133 Risk for non-achievement of targets
None as at end 4th quarter

134