Presentation is loading. Please wait.

Presentation is loading. Please wait.

Communication Power & Security Limited

Similar presentations


Presentation on theme: "Communication Power & Security Limited"— Presentation transcript:

1 Communication Power & Security Limited

2 Contents: Company History Company Setup CPS Services
Underground Client Clients Our Commitment Communication Power Security 2. Introduce yourself and job title. Explain presentation will be for around 10 minutes Introduction / Scope - Deliver reason, scope, aims and objectives of the presentation. The aims and objectives of this presentation are to identify and discuss the potential risks to Health & Safety on the Lion Plaza site. The recommendations from this report will enable you to Implement a plan to manage and control the identified risks and hazards. PREVENTION IS BETTER THAN CURE!

3 Company History CPS has been trading for over ten years in the commercial building industry, specialising in all types of Communication, Electrical & Security work. The company is covered by £5 million public liability insurance and £10 million employer's liability insurance. The company complies with both Health & Safety at Work Act 1974 and the Equal Opportunities Legislation. Both are in place. We provide a professional service, quality workmanship and value for money. We have the flexibility and the experience to undertake projects ranging from minor repairs or maintenance to major refurbishment and full installations. We pride ourselves on quality workmanship. All our employees are skilled and understand our expectations and those of our clients. Programme for presentation Discuss main hazards risks and control measures at the Lion Plaza site Explain the implications if losses occur – financial, operational, personal Use newspaper cuttings to bring home the possible severity of accidents List of the hazards requiring urgent attention – FIRE, TRAFFIC, SLIPS/TRIPS/FALLS, ELECTROCUTION Implementation of site health and safety recommendations – financial and time implications to rectify hazards CONCLUSION Does everyone understand how important these actions are?

4 Company Setup The company has been trading for over 10 years as a sole trader with 4 subcontractors undertaking small electrical domestic installations. CPS has been incorporated as a Private Limited Liability company and has been registered for VAT since June 2005. An audit firm has been appointed to conduct annual audit management reports and will be produced for the Company Directors to sign the accounts each year before filing the accounts to Companies House.

5 CPS Service Electrical Containment Fire Alarm Systems CCTV
Security Systems IT Infrastructure Main LV Infrastructure Lighting Systems Intercoms and Access control systems Electrical installations PA Systems Site Temporaries and Site Set-ups Air Conditioning Plumbing Communication Room Installation Security and Domestic fencing Labour supply

6 Clients Atkins Global Ltd Letchworth Tennis Club Saatchi & Saatchi
Club Runner Ltd Ward & Partners ISG Interior Exterior WG&R Limited Pathways To Independence Age Concern World Trade Group Telesys UK Ltd ISG Southern Masonry frame systems DPD Post and Parcel delivery company MJLonsdale /Redworx

7 Underground Communications and CCTV Installations for London Underground Ltd on behalf of Atkins Global - stations completed include: Ruislip Station Chigwell Station Turnham Green Station Roding Valley Station Northwick Park Station Loughton Station Plaistow Station Theydon Bois Station Dagenham Heathway Station

8 Our Commitment: We pride ourselves on quality workmanship and endeavour to reflect this in every type of job we undertake and every call-out we receive. All our employees have been vetted for quality and expertise and understand our expectations and those of our clients. Our other commitments include: High quality service Reliable service Friendly service Friendly advice All work guaranteed After work customer service

9 Communication: Voice & Data Networks Cat5 Network Installations
Leaky Feeder Telecom PA Systems 3G Network 4G Network Voip

10 Power: Electrical Installations BMS Induction Loop Site Temporaries
Lighting Systems Plumbing Air Conditioning

11 Security: Registered installers for Texecom, Scantronic , Visonic
Intruder Alarms Intercoms Access Control Gate Automation Security Lighting Fire Alarms Fire Extinguishers CCTV web based and non-web based Kmk;l mmk mnkm\k\


Download ppt "Communication Power & Security Limited"

Similar presentations


Ads by Google