Approaches, Challenges, Lessons
Go!Durban Approaches, Challenges, Lessons SATC 2019
2
Presentation outline Original approaches, Challenges, Lessons, Revised Approaches and Progress update on the following components: IPTN Planning approach Industry Transition. APTMS & AFC Infrastructure Rollout
3
IPTN PLAN 1. Original approach 2. Challenges 4.Revised approach
& Progress update 3. Lessons Learned
4
IPTN Plan: Original approach
Developed a wall to wall plan Eight Road based corridors. One Rail corridor – Backbone of network. Network of Feeder services. Complementary/Direct services. 85% of residence within 800m of PT.
5
IPTN Plan: Original approach
Key Assumptions Concurrent implementation of Phase 1 corridors for a network effect. Full replacement of existing PT services. Demand driven approach from the on set. Full infrastructure rollout followed by operations.
6
King Shaka International
IPTN Plan: Wall to Wall Network C7 C9 C8 C6 C5 Hillcrest Bridge City Mpumalanga Chatsworth Pinetown Umhlanga King Shaka International Tongaat CBD Rossburgh Merebank Prospecton Umlazi Isipingo C4 C2 C3 C1 Phasing Year Phase 1 C3 2019 ICDS 2022 C9 2023 C1 2024 C2 (Rail) TBC Phase 2 C5, C7 2026 Phase 3 C4, C8 2028 Phase 4 C6 2030
7
Planned Operational Year
IPTN PLAN: Focus on Phase 1 C9 C3 C1 Bridge City Pinetown Umhlanga CBD Phasing % Trunk – Feeder Trips Planned Operational Year Phase 1 C3 25% 2019 ICDS 2022 C9 2023 C1 2024 C2 (Rail) 40% TBC
8
IPTN Plan: Challenges/Lessons/ Revised approach
Developed a wall to wall plan Eight Road based corridors No changes to trunk corridor network One Rail corridor – Back bone of network catering for 40% of the demand Uncertainty of C2 rollout timelines due to PRASA’s internal challenges Review of IPTN wall to wall plan, possible introduction of road based solution
9
IPTN Plan: Challenges/Lessons/ Revised approach
Network of Feeder and Complementary/Direct services Low cost recovery ratio impacts on network financial sustainability Feeder and complementary network prioritization and ramp-up approach to full coverage
10
IPTN Plan: Challenges/Lessons/Revised approach
Key Assumptions Concurrent implementation of Phase 1 corridors for a network effect Limited PTNG funding Corridor by corridor implementation Full replacement of existing services Feasibility has not been demonstrated in other cities Hybrid approach
11
IPTN Plan: Challenges/Lessons/Revised approach
Demand driven implementation from the on set Demand estimation is tricky due to existence of competing services and absence the network effect. Supply driven ramp-up approach. Full infrastructure rollout followed by operations Long lead time to the start operations. Plan to fast track operations ahead of full infrastructure rollout.
12
C3 ROUTE
13
C3: Infrastructure Corridor Portfolio Status ROW 26.3km
Stations Operational by Sept 2019 Stations Operational by June 2022 Interim Terminal Operational by May 19 Mixed Traffic km Interim Depots Ntuzuma Pinetown Corridor Portfolio Status ROW 26.3km 22.3 km Complete Stations 14 10 Complete Depot - Bridge City 1 Planned construction Terminal Planned construction
14
C3 Operational Plan: Year 1: Trunk only service
X 22 Standard Buses 4am to 9am Every 6min in peak Every 15min off-peak X 10 Closed Stations X 1 Temporary Terminal X 880 peak hour X 4400 per weekday X 38 Drivers Mifare Trunk = Distance based Feeder = Flat fare Reloading: Kiosks &TVMs X km/mnth
15
C3 Operational Plan: Year 2: Trunk only service
X 33 Standard Buses 4am to 9am Every 4min in peak Every 15min off-peak X 11 Closed Stations X 1 Temporary Terminal X 1400 peak hour X 6900 per weekday X 50 Drivers Mifare Trunk = Distance based Feeder = Flat fare Reloading: Kiosks & TVMs X km/mnth
16
C3 Operational Plan: Year 3: Trunk & Priority Feeder
4am to 9am Every 3min in peak Every 10min off-peak X 33 12m Rigid buses - Trunk X 22 Rigid Buses - Feeders X 67 MBT - Feeders X 13 Closed Stations X 1 Temporary Terminal X 5600 peak hour X per weekday Mifare Trunk = Distance based Feeder = Flat fare Reloading Kiosks & TVMs X 267 Drivers X km/mnth
17
Industry Transition 1. Developed City wide Principles
2. Six negotiation principles 3. Key Challenges & Lessons Learnt Progress update
18
Industry Transition : Approach
Identified, agreed and signed off on City wide Negotiation Principles. Combined both Minibus and Bus Industry into one Vehicle Operating Company. Phased replacement of existing PT services i.e Only withdraw in line with supply provided on the corridor.
19
Industry Transition: Negotiation Principles
Training & Skills Development Minimum terms of contract Fleet Ownership 4 5 6 Compensation Value Chain 1 2 3 Eligibility 1- 5 agreed and signed off except :Fleet Ownership
20
Industry Transition: Challenges/Lessons/Approach
Non agreement on a vehicle ownership model Freeze principle 5 and proceed with negotiations. City is procuring the first tranche of 50# buses. Delays reaching consensus/agreement with three separate entities i.e MBT - Western Region, MBT - Northern Region & Bus Industry Organised separate engagements followed by joint engagements
21
Industry Transition: Challenges/Lessons/Approach
Limited information dissemination from MBT leadership to associations & individual operators. City organizes and participates in briefing sessions with industry sub structures. Historical issues of alleged intimidation of bus operators by the minibus taxi operators. Established at separate task team to discuss and conclude on this matter.
22
APTMS and AFC 1. Original Approach 2. Challenges Revised Approach
& Progress update 3. Lessons Learned &
23
APTMS: Original & Revised approach
Implement full APTMS package from the on set APTMS costs too high: Ball park costs = R400m; 500 buses/6 years Decided on an APTMS lite solution: R25m; 500 buses /6 years. On board CCTV - None Passenger information:- Android based smartphone Scheduling software – MS Excel Bus Schedule monitoring:- Netstar Bus tracking software Driver Communication - Voice and text via hand-free smart cellphone device
24
AFC: Original and Revised Approach
AFC Proposed alternative Implement full EMV DOT guidelines Costs too high Decided on an MiFare - EMV compliant for bank issued credit & debit cards. MIFARE EMV PREPAID No bank charges for loading cards. Incurs bank charges for every load Cost of a Mifare card is less EMV cost is higher Cost of Ticket Office Machine for loading Mifare is 30% less than EMV Cost of Ticket Office Machine for loading EMV 30% higher
25
INFRASTRUCTURE ROLLOUT
1. Original Approach 2. Challenges 3. Lessons Learned 4. Revised Approach & Progress update
26
Infrastructure Rollout: Delays
Construction on existing road network Land Acquisition incl PTO Delays in re-location and renewal of services Consequential upgrades to existing road infrastructure Work stoppages PT operators and communities demanding a stake in construction. Service delivery protests - not related to the project. Inter governmental agreements (MR5577 – Provincial road, R102)
27
Infrastructure Rollout: Response to Work stoppages
Include a 10% CPG stake in contracts for communities. Conduct extensive engagements with communities, business forums, ward councillors, MKMVA Create opportunities database. Establish Business Desk with representation form key stakeholders Introduced incubation programmes for 1CE – 3 CE contractors Ballot process for selection from the database.
28
C3 Pinetown St John’s underpass
29
C3 Wyebank, Pinetown
30
N2 Umgeni Crossing: Dumisani Makhaye Rd
31
Cornubia BLVD / N2 Bridge
32
Thank-you