Presentation is loading. Please wait.

Presentation is loading. Please wait.

Methodology for impact assessment of ESS.VIP projects (cost-benefit)

Similar presentations


Presentation on theme: "Methodology for impact assessment of ESS.VIP projects (cost-benefit)"— Presentation transcript:

1 Methodology for impact assessment of ESS.VIP projects (cost-benefit)
Christine Kormann Task Force Integrated Planning Susanne Taillemite Finance Sorina Vâju Social statistics- modernisation and coordination Karo Nuortila Goods- production and international trade 17 June RDG

2 Background Methodology builds on the work of two groups (2013):
Task Force "Impact analysis of ESS.VIP projects” (AT, EE, DE, IE, IT, NL, SE)- conducted a pilot (PRIX) Sponsorship on Standardisation (business cases for European standardisation initiatives) First presented to the ESSC in February 2013, refined and agreed by the ESS RDG and the DIME in June 2013 Today: information on recent and ongoing experience In December: proposals for adaptations to the methodology to the ESS RDG

3 Principles of the methodology
Methodology conceived to assess ESS-VIP projects before they are launched. Combines qualitative assessment based on a SWOT analysis and quantitative assessment of costs Combines assessment at national and European level Involves statistical and financial experts

4 Main steps

5 Qualitative analysis Strengths Weaknesses Opportunities Threats
Identify the different work packages that deserve a specific analysis Establish the main criteria : fixed SWOT items (saving of resources, quality, burden…) … and flexible SWOT items adapted to specific project needs, identified by a focus group Scoring: all 24 SWOT items are assessed by each NSI on relevance and impact

6 Template SWOT rating (1)
Cost analysis feeds in item 2a

7 Template SWOT rating (2)
Study on burden feeds into item 3a

8 Quantitative analysis
Focus only on business processes affected by change Identify cost drivers (impact of changes on the costs) Estimate current, development and future costs of production Cost categories: staff, IT solutions, overhead, other costs If available, build on concrete experiences from countries Costs for Eurostat + costs for NSIs Conclusions of the quantitative analysis feed into the SWOT analysis.

9 Experience so far Methodology conceived to assess ESS-VIP projects before they are launched ESS.VIP ADMIN: implemented qualitative analysis; some suggestions for improvement of the methodology ESS.VIP REDESIGN of Intrastat: Comparison of different options ongoing, qualitative and quantitative Implementation of the methodology is a resource- intensive exercise

10 Experience so far ESS.VIP ADMIN

11 Background Purpose: Contributes to ESS Vision 2020 key areas:
facilitate the increased use of administrative data sources in the ESS without compromising on output quality Contributes to ESS Vision 2020 key areas: New data sources Quality Robust statistical process Users and stakeholders Adopted by ESSC in February 2015

12 Average scores (21 replies)
S W O T

13 Experience – focus group
Positive High level of involvement Consensus Negative Understanding of the SWOT methodology Difficulty to classify SWOT items Not enough time to agree on the full list or provide the explanations

14 Experience – apply and process questionnaire
Positive Negative Attempt of standardised assessment No standard time frame Explanations create partial overlaps between items Fixed items Deployment vs execution? Disagreement with classification Graph Impact on own NSI or the ESS? Important items may be missing Understanding impact and relevance Importance of comments for improving the business case

15 Recommendations 1. Improve the clarity of the instructions
Impact on their own NSI not ESS Respondents justify their score Explain relevance and impact 2. Allow more time for the workshop (3 hours)  

16 Recommendations 3. Reflect on possible changes to the methodology
Include more flexibility in the SWOT classification, the 12 items of strengths and weaknesses (internal to the project) could be put together and scored negative or positive. Reflect on if an how the scope of the evaluation can be standardised

17 ESS.VIP REDESIGN of Intrastat
Experience so far ESS.VIP REDESIGN of Intrastat

18 Background In November 2011, the Council called upon ESS " … to take effective measures ensuring a substantial reduction of the response burden by redeveloping Intrastat, while maintaining a sound level of quality needed". Launch of the SIMSTAT (ESS.VIP) project decided by ESSC in May 2012 Complementary project REDESIGN (ESS.VIP) decided by ESSC in November 2014 REDESIGN tasks Options for re-designing Intrastat Administrative burden reduction and cost-benefit assessment of each option Key legal and methodological issues of each option

19 Identification of options
Q1/2015 – Q2/2015 Three options chosen to be assessed SIMSTAT Revised Intrastat Single Flow Options built around their main principles to make them distinctive enough to assess them

20 Identification of SWOT items
REDESIGN workshop Group discussions on how the options are going to be assessed and to define SWOT items Various aspects suggested to consider Methodology originally defined to assess different projects, not options within a project => issues to be solved Fixed SWOT items: some not suitable for the purpose of the project Internal (S/W) and external items (O/T) Quality items: depending on the options can be strengths or weaknesses

21 Identification of SWOT items
Proposal prepared by three Member States (DK, IE, UK) Solutions Fixed SWOT items: some not included in the list Internal items: internal to Intrastat or inherent to the options External items: aspects affecting stakeholders Quality items: allocation to either strengths or weaknesses, some further work needed

22 Strengths Weaknesses a. Saving of resources
b. Improved comparability over space c. Enhanced flexibility d. Enhanced relevance of statistics e. Ensured comparability over time f. Enhanced re-usability of data a. Costs (of development, transition, support and maintenance) b. Complexity of changes c. Lack of compatibility with national data needs d. Lower accuracy of detailed output e. Impact on timeliness f. Dependency on other ITGS compilers

23 Opportunities Threats
a. Reduction of administrative burden upon respondents b. Enhanced standardisation c. Meeting stakeholder perceptions and expectations d. System durability/sustainability e. Compliance with the needs of internal users and stakeholders f. Demonstration of Vision 2020 implementation a. Lack of consistency with national policies b. Lack of support from financers c. Disproportionate impact on smaller Member States d. Timeline to implement the option e. Reduction in trust/acceptance by users over quality of the data f. Reduction in trust by PSIs over data security

24 Quantitative analysis
For different options 1. As-is situation 3. To-be situation 2. Development costs and adaptation costs Current operating/ production costs Operating costs after implementation Evolutive maintenance costs

25 Roadmap quantitative analysis for "Redesign of Intrastat"
Steps Roadmap 3.1.1 Determine the timeline of the impact analysis 3.1.2 Identify the main areas of the GSBPM model affected by change 3.1.3 As-is situation (To be finalised 30 June) 3.1.4 Grouping of countries 3.1.5 Identification of cost drivers 3.1.6 Development costs and adaptation costs Deadline: 15 July 3.1.7 To-be state September 3.1.8 Summary report October

26 TO DO FOR 15 JULY: Estimate development costs and adaptation costs related to the different options
A distinction has to be made between development costs of the project at EU-level (i.e. not to be borne by each NSI), and costs for adaptation of the local system in each NSI. Given the purpose of the ESS.VIP projects, main developments for the different options may be carried out by Eurostat or a small group of NSIs and are assessed by Eurostat in cooperation with the relevant NSIs. Adaptation costs for each of the options have to be estimated for NSIs in each group based on the identification of the cost drivers.

27 State of play and next steps
Proposal discussed and welcomed by the ITGS SG beginning of June Some work to be done for rewording some items and stressing the quality items Written consultation in Q3/2015 to adopt the list of items Assessment of the options Q4/2015 Summary and synthesis report Q1/2016


Download ppt "Methodology for impact assessment of ESS.VIP projects (cost-benefit)"

Similar presentations


Ads by Google