2 Lecture Objectives: Learn about plumbing systems
Discuss district heating and cooling systems

3 Pipe Head Loss

4 Fittings

5 Pump curves NPSHR = Net Positive Suction Head Required

6 Pumps Raise pressure and produce flow Main type Centrifugal Example of
Turbine pump Base mounted Inline Reading (textbook) Page

7

8 Changing Pump Speed

9 Net Positive Suction Head (cavitation)

10 Curve for Multiple Pumps

11 System Curves ∆p ∆p A+B A B A+B A B V A B V A B Parallel Serial

12 Find a system curve for this plumbing configuration

13 Primary/Secondary and Tertiary Pumping (schematics A&B below)
Reading Assignment: Taylor, S., P. Dupont, B. Jones, T. Hartman and M. Hydeman Chilled water plant design guide. San Francisco: Pacific Gas & Electric Company. engineering.com/downloads/cooltools/EDR_DesignGuidelines_C oolToolsChilledWater.pdf

14 System balancing AHU1 AHU2 HC1 HC2 100 ft 1000 ft 10 gpm 2 gpm 10 ft
pump BOILER

15 Valves Section 5-14 and 6-15 in the textbook Types Butterfly Valves
Ball Valves Globe Valves Three way valves

16 Valve Sizing and Flow Coefficient
Cv value: in liter/hour or…. in Pa Control Valve Selection For Hydronic Systems reference:

17 Control Valve Selection For Hydronic Systems
Before DC we tried to do this Valve authority