1 progress in technical implementation
national programmes or action plans EU Directive NP or NAP (start) Status/ deadline Urban waste water NP for development of sewer and treatment facilities (1998) 25 %/ 2015 20 % / 2009 Drinking water Source protection(1997) Improvement of drinking water quality (2001) 70 % / 2003 Nitrate NAP in 3 phases (2001) 20 % / 2012

2 Action plans for the implementation of the nitrate directive
programme started in 2001, full implementation in 2012 estimated costs: 80 million Euro

3 progress in technical implementation
national programmes or action plans EU Directive NP or NAP (start) Status/ deadline Urban waste water NP for development of sewer and treatment facilities (1998) 25 %/ 2015 20 % / 2009 Drinking water Source protection(1997) Improvement of drinking water quality (2001) 70 % / 2003 Nitrate NAP in 3 phases (2001) 20 % / 2012 Groundwater protection NP for remediation (1996) cont.

4 and to the type of the water use
Economical analysis cost recovery Present situation: Water prices cover the operational and maintenance costs (development costs can also be included) high water prices are subsidised Water resources fee according to the type of the water resource medicinal thermal karstic confined groundwater shallow groundwater bank filtered water surface water and to the type of the water use therapeutic drinking water bathing animal farms fishery irrigation energy hydroenergy Polluter pays e.g. waste water fine ….

5 CO - OPERATION AT EU AND DANUBE LEVEL
HOW TO PROCEED ? body RATIONALITY waterbody water EFFICIENCY CO - OPERATION AT EU AND DANUBE LEVEL