Presentation is loading. Please wait.

Presentation is loading. Please wait.

CLEAR FLOOR TWO POST LIFT Operation instruction

Similar presentations


Presentation on theme: "CLEAR FLOOR TWO POST LIFT Operation instruction"— Presentation transcript:

1 CLEAR FLOOR TWO POST LIFT Operation instruction
CL-245C Operation instruction

2 MANUAL RELEASE ON BOTH SIDE

3 THE POWER UNIT

4 Instruction of the power unit
“UP” button Long press is to raise the lift Motor Oil tank “UNLOAD HANDLE” Press it to lock/lower the lift

5 Instruction of the SELF-LOCKING DEVICE
Adjustable screw The safety pawl Unlocking steel cable

6 Instruction of the SELF-LOCKING DEVICE
Locking operation 1.Long press the button "UP", the safety pawl will be lifted. 2.Release the button "UP", the safety pawl will fall to the safety gear itself. 3.When press the unload handle,the safety pawl moves to the nearest safety gear to lock the lift tightly. “UP” button “UNLOAD HANDLE”

7 Instruction of the SELF-LOCKING DEVICE
Unlocking operation First press button “UP” to raise the lift a little Then pull the unlocking steel cable to release the lock Press “UNLOAD HANDLE" to lower the lift.

8 The end


Download ppt "CLEAR FLOOR TWO POST LIFT Operation instruction"

Similar presentations


Ads by Google