Presentation is loading. Please wait.

Presentation is loading. Please wait.

GOMaximo 2016 Russell Bee Lead Product Architect

Similar presentations


Presentation on theme: "GOMaximo 2016 Russell Bee Lead Product Architect"— Presentation transcript:

1 Maximo Oil and Gas, Maximo HSE Manager Maximo Anywhere & core Maximo highlights Product Roadmap
GOMaximo 2016 Russell Bee Lead Product Architect STSM, Maximo Design and Architecture

2 Oil and Gas Development Team at GOMaximo
Ana Paula Brambila – Lead Developer (Sao Paulo, Brazil) Francisco Coelho – Lead Quality Assurance (Sao Paulo, Brazil) Kyle Harding – Design and Architecture (Boston, MA) Russell Bee – Design and Architecture (Manchester, England) Vikul Banta – Product Management (Boston MA)

3 Safety moment – Two accidents 30 years apart
Manchester August 1985 Las Vegas September 2015

4 Safety moment – Two accidents 1 year apart
Las Vegas September 2015 Dubai August 2016

5 Reflections on last year’s keynote
“ Normalisation of Deviance” The Challenger Launch Decision: Rising Technology, Culture and Deviance at NASA. Diane Vaughan 1996

6 Why take an integrated approach?
“The Space Shuttle program has a wealth of data tucked away in multiple databases without a convenient way to integrate and use the data for management, engineering or safety decisions” Columbia Accident Investigation Board as quoted in Organizational Learning at Nasa: The Challenger and Columbia Accidents by J Mahler & M Casamayou

7 Examples of some of the possible interactions in Maximo Oil and Gas and Maximo HSE Manager 7.6
Audit and Survey Improvements Operating Procedures Certifications Operator Log Incident Management Operational Actions Defects Solutions Bypass Management Investigations Benefits & Losses Regulatory Compliance Work Order Tracking Operating Policy Failure Reporting Management of Change People Risk Matrix Risk Assessment Permit To Work Action Tracking Note: Blue boxes show Applications

8 Maximo Highlights since last GOMaximo

9 Highlights since last go Maximo
Delivered Oil and Gas/HSE Manager in December 2015 Delivered a Worker and Process Safety proof of concept at Interconnect in February 2016 Delivered Maximo Anywhere based Incident Reporter as part of Maximo Oil and Gas/HSE Manager in March 2016 Asset Health Insights released in July 2016 First perceptive applications released in July 2016

10 Maximo Oil and Gas/HSE Manager 7.6. business processes
Major Business Processes Maximo Oil and Gas/HSE Manager 7.6. business processes Operations Management Control of Work Asset & Work Management HSE Management Quality Management Management of Change Knowledge Management Drilling and Well Management Manage operator logs Risk Management Asset management Incident Management Regulatory Compliance Management of Change Capturing Knowledge Drilling and Completion Detailed Business Processes Production loss reporting Permit to Work Defect Management Investigation Management Managing non-conformance Continuous Improvement Identifying Solutions Manage Run Logs Bypass Management Lock Out/Tag Out Plan Work Management Managing Corrective Action Audit Management Maximo Oil and Gas only Safety Quality Compliance Define operating policies and procedures Hazard Management Turnaround management Managing Certification Competency Management Failure management Managing Supply Chain Quality Construction and Commissioning Management Maximo Health, Safety and Environment Manager focuses on several key business processes or activities such as: Operations, Asset & Work Management, Control of Work, Investigation & Improvement, Change Management, Compliance and Knowledge Management. You can see that there are many different applications or capabilities that support each of these key business processes. I will highlight these on the following slides. You can also see by the graphic at the bottom of the slide that IBM Maximo’s capability embraces the main themes of Safety, Quality and Compliance. Now let’s dive a bit deeper into each of the capabilities.

11 Maximo Oil and Gas/HSE Manager 7.6.0 - Sub process enhancements
Incident Management - Sequence of event reporting Management of Change - Pre Start Safety Review(PSSR) Manage Operator Logs - Loss reporting Permit to Work - Process simplification Hazard Management - Chemical management enhancements Defect Management - Product defect reporting Risk Management - Operational risk assessment

12 Maximo Looking Forward

13 The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. THE INFORMATION PROVIDED IN THIS DOCUMENT IS DISTRIBUTED “AS IS” WITHOUT ANY WARRANTY, EITHER EXPRESS OR IMPLIED. IBM EXPRESSLY DISCLAIMS ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT

14 Maximo Looking forward
Maximo Feature Pack Maximo Oil and Gas/Maximo HSE Manager 7.6.1 Maximo X Maximo Anywhere 7.6.1 Scheduler Plus Worker and Process Safety Mobile apps eg Permit Request, Toolbox Talk Inspection

15 Maximo Anywhere: Recent Releases
June 2015 ISM Library & Q1 2016 ISM Library & Q3 2016 2016 2016 Maximo Anywhere 7.5.2 Maximo Anywhere 7.6 Maximo Anywhere 7.6.1 Applications Additional Applications Application Level Additional Calibration functions ESRI/Offline Maps on Windows Asset Data Manager Additions Incident Reporting (HS&E, O&G) Work Execution Asset Data Manager Work Ex. for Calibration Inspection Asset Audit Transfers & Receipts Platform Level RFID Capabilities Push Notifications MobileFirst Currency Further Style & Usability Changes OS Currency Physical Count Service Request Issues & Returns Work Approval New Functional Enhancements Report Downtime Asset Moves Work History Functional Enhancements Copy Plans to Actuals Classifications/Specifications New Platform Enhancements Available as SaaS eSig & Signature Capture GPS Style & Usability Changes iOS 9.x Win10 The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion.   .

16 Partial list of Future Development backlog
Location Based Services and Mapping Enhancements Enhance map control to encompass ESRI, Google, Bing. Send device position back to Maximo in specified time intervals. Query work, assets, locations, PMs, labor/crews based on current device position. Ability to modify work on a map including redlining and mark ups. Linear Asset Management Application Enhancementsents Crews & Crew Mgmt Labor/Time Reporting Material Request Assignments Inventory Pick List and Staging Updates on current applications Industry Solution Application EnhancementsdusSolution Apps Station Rounds (Nuclear) Permit Request (O&G) Toolbox Talk (O&G) CU In Progress Enhancements (Utilities) Technical Foundation MobileFirst and OS Currency Improve Time to Value – Install, Customization, Performance, UX Enhance Data Synchronization Full Accessibility Support The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion.

17 Maximo Oil and Gas/HSE Manager 7.6 and 7.6.1 business processes
Major Business Processes Maximo Oil and Gas/HSE Manager 7.6 and business processes Operations Management Control of Work Asset & Work Management HSE Management Quality Management Management of Change Knowledge Management Drilling and Well Management Manage operator logs Risk Management Asset management Incident Management Regulatory Compliance Management of Change Capturing Knowledge Drilling and Completion Detailed Business Processes Shift handover Permit to Work Defect Management Investigation Management Managing non-conformance Continuous Improvement Identifying Solutions Manage Run Logs Production loss reporting Isolation Management Work Management Managing Corrective Action Audit Management Maximo Oil and Gas only Safety Quality Compliance Bypass Management Hazard Management Turnaround management Managing Certification and Regulatory Permits Competency Management Managing Operational Actions Failure management Incident Reporter Managing Supply Chain Quality Define operating policies and procedures Construction and Commissioning Management

18 Oil and Gas/HSE 7.6.1 Sub process enhancements
Asset Management, Failure Mode Effect and Criticality Analysis; Criticality Analysis, Consent monitoring Manage Operator Logs – Shift handover Incident Management – Injury and illness reporting, OSHA process support Permit to Work – Site check, countersignatures, hazard review, suspend action Risk Management – Hazard review, supplementary risk assessment, environmental impact assessment Managing Corrective Action – Safety Meetings, Safety Bulletins Investigations – Human factors analysis Managing Certifications – Regulatory permits

19 Maximo Oil and Gas/HSE Manager Business Process Map in Blueworks Live – APQC now just a reference

20 Maximo Oil and Gas/HSE Manager 7.6.1 Module and Application Structure
Assets Change (Oil) Inventory Operations Planning Planning Preventive Maintenance Purchasing Safety and Quality Management Work Orders Safety sub module New apps Location Profile New apps MOC Request MOC Improvements Cloned apps Item Master New apps Operator Log Log Book Operator Tasks Operating Policies Procedures Bypass Management Operational Actions New apps Asset List Condition for Work Regulatory Compliance Prioritization Matrix Benefits and Losses Standard Actions Action Groups New apps Permit and Cert Types Permit to Work Risk Assessment Risk Matrix Isolation Management Cloned apps Preventive Maintenance Cloned apps Purchase Requests Orders New apps Certifications Audits Defects Investigations New apps Action Tracking Cloned apps Assets Locations Cloned apps Work Order Tracking Cloned apps Incidents Service Requests Solutions Ticket Templates Create Incident Review New apps Oil and Gas Drilling and Completion Cloned apps Hazards Precautions Lock Out/ Tag Out Plan Key New apps Oil and Gas Run Log Module Cloned apps Job Plans Routes New application Mobile (Anywhere) Incident Reporter Cloned application Oil and Gas only

21 A closing thought….. “We build too many walls and not enough bridges”
Isaac Newton Isaac Newton. (2015, April 2). In Wikipedia, The Free Encyclopedia. Retrieved 20:25, April 8, 2015, from

22 Thank you!

23 Program Highlights - Thursday
NEW – Whova app Download from Apple App Store or Google Play Download to view program, see sponsor info, connect with attendees and more Texas Hold em Poker Tournament Door prizes and grand prize winner 5:30 to 9:00 pm Must be present to win Session Feedback Access on the Whova app, click on session, rate, select stars and submit

24 © Copyright IBM Corporation 2015. All rights reserved.
Availability. References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. The workshops, sessions and materials have been prepared by IBM or the session speakers and reflect their own views. They are provided for informational purposes only, and are neither intended to, nor shall have the effect of being, legal or other guidance or advice to any participant. While efforts were made to verify the completeness and accuracy of the information contained in this presentation, it is provided AS-IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, this presentation or any other materials. Nothing contained in this presentation is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. All customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer. Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue growth or other results. © Copyright IBM Corporation All rights reserved. U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp. Please update paragraph below for the particular product or family brand trademarks you mention such as WebSphere, DB2, Maximo, Clearcase, Lotus, etc IBM, the IBM logo, ibm.com, Interconnect, [IBM Brand, if trademarked], and [IBM Product, if trademarked] are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law trademarks in other countries. A current list of IBM trademarks is available on the Web at “Copyright and trademark information” at If you have mentioned trademarks that are not from IBM, please update and add the following lines: [Insert any special 3rd party trademark names/attributions here] Other company, product, or service names may be trademarks or service marks of others. • REMINDER: Please follow the guidelines for copying third party materials. Third party screen shots, logos, presentations and website content are copyrighted materials owned by the third party, and as such we need permission from the third party to use them.  Also, be sure the information you put on a chart is verifiable. Be sure to cite the source on your deck when using words, ideas, facts, photos, news clips or other expression that did not originate from yourself. This applies even if the content is publicly available and not confidential. If you have any questions, please contact your IP Attorney.


Download ppt "GOMaximo 2016 Russell Bee Lead Product Architect"

Similar presentations


Ads by Google