Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lecture Objectives: Analysis of Absorption Cooling Cycles.

Similar presentations


Presentation on theme: "Lecture Objectives: Analysis of Absorption Cooling Cycles."— Presentation transcript:

1 Lecture Objectives: Analysis of Absorption Cooling Cycles

2 Absorption cooling with preheater
Rich ammonia vapor 4 5 Refrigeration and air conditioning (Ramesh et al)

3 Absorption cooling with preheater
Saturated vapor at p1’ 1’’’V=3 Major heat source 6 1’’’ mixing isotherm 6h 1’’ Useful cooling energy 1’’’L =2 4 5 1’ Saturated liquid at p1’ 2’ , 2’’ 1 Saturated liquid at p1 Cooling tower Pumping energy COP= Q cooling / Q heating (Pump ???)

4 For Real energy analysis you need real h-x diagram!
hfg for H2O hfg for NH3 For Real energy analysis you need real h-x diagram!

5 Use of precooling (system improvement #2)

6 Absorption cooling with precooling
Saturated vapor at p1’ 1’’’V=3 Major heat source 6’ 6 6h 1’’’ mixing Saturated liquid at p1’ isotherm 1’’ Useful cooling energy (larger!) 1’’’L =2 4 1’ Saturated liquid at p1 2’ , 2’’ 4’ 5 1 Cooling tower (needs to cool more!) Pumping energy

7 System improvement #3 Generator with Enrichment of NH3 8V 9 8L 10 8LLP
Different 8V 9 8L 10 8LLP 11

8 Heat rejection with separation into liquid and vapor (Enrichment NH3 in the vapor mixture)
This is our point cooling 1 4=2V Separator 6=5V Q12 /m1 cooling Q45 /m4 x8 m8 8 7 m1 =m2 5 2 sub cooled liquid mixture isotherm m3 2L Q12 x1 x8

9 Ammonia Enrichment Process (rectification)

10 Absorption system with Enrichment (no preheater nor precooler)
Saturated vapor at p2 3V 8V 3 mixing 11 8L 1’ Useful cooling energy 8LLP 10 3L 2 9 Saturated liquid at p2 1 Saturated liquid at p1

11 Example of H2O-NH3 System
Text Book (Thermal Environmental Engineering) Example 5.5 HW 4: Solve the problem 5.6 from the textbook Beside example 5.5, you will need to study example 5.6 and 5.7

12 LiBr-H2O Systems

13 LiBr-H2O Systems

14 Twine vessel LiBr-H2O Systems

15 Useful information about LiBr absorption chiller
Practical Tips for Implementation of absorption chillers Identify and resolve any pre-existing problems with a cooling system, heat rejection system, water treatment etc, before installing an absorption chiller, or it may be unfairly blamed. Select an absorption chiller for full load operation (by the incorporation of thermal stores if necessary) as COP will drop by up to 33% at part-load. Consider VSD control of absorbent pump to improve the COP at low load. Consider access and floor-loading (typical 2 MW Double-effect steam chiller 12.5 tons empty, 16.7 tones operating). Ensure ambient of temperature of at least 5°C in chiller room to prevent crystallization.

16 System with no pump (Platen-Munter system)
H2O-NH3 + hydrogen


Download ppt "Lecture Objectives: Analysis of Absorption Cooling Cycles."

Similar presentations


Ads by Google