Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison Report Date: Authors: March 2010

Similar presentations


Presentation on theme: "Liaison Report Date: Authors: March 2010"— Presentation transcript:

1 802.21 Liaison Report Date: 2010-03-19 Authors: March 2010
March 2010January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 March 2010 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

2 Abstract Liaison report on 802.21 as presented to 802.11 March 2010
September 2008 January 2009September 2008 March 2010January 2009September 2008 doc.: IEEE /xxxxr0 March 2010 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

3 WG Elections 802.21 Current Tasks
September 2008 May 2008 March 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2010 Current Tasks WG Elections Subir Das (Telcordia) elected WG Chair Juan Carlos Zuniga (InterDigital) elected WG Vice Chair Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

4 Request for Heterogeneous Mesh Networks Study Group
September 2008 May 2008 March 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2010 Current Tasks Request for Heterogeneous Mesh Networks Study Group Develop Abstract Link Interface across different 802 networks covering functionality for Heterogeneous Mesh Operation Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

5 Down selection process rescinded once again. Moved to July 2010
September 2008 May 2008 March 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2010 802.21a Down selection process rescinded once again. Moved to July 2010 Discussed summary of proposal for both work-items Working on consensus on a harmonized work proposal Next Steps Discuss detailed text for harmonized proposal in May 2010 Interim Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

6 802.21b Broadcast Services Handover Task Group
September 2008 May 2008 March 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2010 802.21b Broadcast Services Handover Task Group Chair: Juan Carlos Zuniga (InterDigital Communication) Progress Two proposals from ETRI and InterDigital merged to form initial WG draft. Next Steps Technical Editor instructed by the group to prepare document in the official template for the next meeting Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

7 802.21c Single Radio Handover Task Group Chair: Junghoon Jee (ETRI)
September 2008 May 2008 March 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2010 802.21c Single Radio Handover Task Group Chair: Junghoon Jee (ETRI) Progress Discussion of Pre-Registration vs. Pre-Authentication Group was updated on the status of IETF netext and WiMAX IWK Next Steps Discussion of proposals in May Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

8 Heterogeneous Wireless Network Management Study Group
September 2008 May 2008 March 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2010 Heterogeneous Wireless Network Management Study Group Chair: Johannes Lessmann (NEC) Progress Group gave a presentation in WNG; trying to gauge interest in other groups in supporting Three presentations Dapeng Liu, China Mobile: Use Cases/Experiments with heterogeneous wireless mesh networks Subir Das, Telcordia: Cross-layer routing in het-nets, exploiting media independent link information Antonio de la Oliva, Universidad Carlos III de Madrid: Providing Service Guarantees in Heterogeneous Wireless Mesh Networks Next Steps Start drafting a PAR Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

9 References This document All Documents
September 2008 May 2008 March 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 March 2010 References This document Thanks to Vivek Gupta, Chair of All Documents Current draft is in the members-only area  Members_Only_Area members log in using username and password Slide 9 Clint Chaplin, Samsung Electronics Page 9 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics


Download ppt "Liaison Report Date: Authors: March 2010"

Similar presentations


Ads by Google