Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council

Similar presentations


Presentation on theme: "Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council"— Presentation transcript:

1 Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

2 Introduction In the past years Rugby Borough Council has taken measures in cutting down on wasted energy. Meter readings were taken manually and given to the energy supplier. This contributed to bill validation and eliminated estimated billing. False billing has been eliminated by identifying redundant and non existent meters. New supplier contracts have been set up for suppliers to provide actual readings rather than estimated readings. Significant reduction in billing is seen in slides to follow

3 Corporate Energy Costs

4 Achievements & Progress to date Projects already implemented Town hall voltage optimisation Closure of Redundant buildings Heating schedule checks (BEMS set points) Energy Management ( Monitoring, Recording & Reporting ) Installation of LED lighting to John Barford car park

5 Case study The secret : To show success with an initial project that demonstrates a strong financial return. Implement a project with a positive Environmental Impact. Thats; Replacement of T8 5ft fluorescent tubes and fitting with Lylux- 5ft LED and fittings with sensors

6 Case Study John Barford Multi-Storey Car Park LED lighting to a Multi-storey Car Park Complete Lamp/Luminaires & Lighting controls(sensors),supply and fit to 389 fittings. Project Cost £49 950 including installation

7 John Barford before installation of LED lighting

8 John Barford after installation of LED lighting

9 The link for before and after installation for a panoramas view of the car park. Location 1, before the installation: http://www.ecolight-ltd.com/index.php/markets/our- customers/rugby-council-car-park/before-installation-1 Location 1, after the installation: http://www.ecolight-ltd.com/index.php/markets/our- customers/rugby-council-car-park/after-installation-1

10 Predicted Change John Barford Car Park lighting Predicted Savings for the car park only

11 Actual Evidence of Change John Barford Car Park lighting Pay back less than 5 years: 4.8 years From £5,274 down to £1,305

12 Evidence of Change John Barford Car Park lighting Impact Reduced electric energy consumption:75% saving In one quarter. Reduced annual running costs from £13,232 to £2,742 Improved Energy efficiency to the car Park Improved Lighting Control Improved Lighting levels hence Customer satisfaction. Positive Environmental impact

13 Challenges To Believe in LED (new technology),as the most cost effective solution for the car Park. To design for sensors and timers to maximise energy savings while providing adequate lighting where necessary. To manage the project during Christmas period and ensure minimum disruptions to the daily use of the car park.

14 Summary LED with controls is the way forward. It cuts down on energy usage while producing a positive effect on budgets Final Thought……. Energy reduction saves money