Presentation is loading. Please wait.

Presentation is loading. Please wait.

A5 Insulator Change Transformer Pole

Similar presentations


Presentation on theme: "A5 Insulator Change Transformer Pole"— Presentation transcript:

1 A5 Insulator Change Transformer Pole
© 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational and educational purposes only. The IAEC does not make any representation or warranty with respect to the accuracy, applicability, fitness, or completeness of the JHA. The IAEC hereby disclaims any and all liability to any party for any direct, indirect, implied, punitive, special, incidental or other consequential damages arising directly or indirectly from any use of this JHA which is provided as is.

2 Why are we doing this energized?
Take some time to decide if it is necessary to do this job energized. Could the job be done de-energized and grounded? What would be the impact? Would it be safer?

3 OSHA Required Tailgate Discussion Topics
Hazards Associate with the job Work Procedures Involved Special Precautions Energy Source Controls PPE Required The five topics required by OSHA to discuss in the tailgate. First letter from each topic = How Well Should Everyone Plan

4 Work Procedures Involved Hazards associated with the job
Special Precautions Energy Source Controls Personal Protective Equipment Be sure to record your emergency location and post in a location everyone on the crew knows. Have your PPE and First Aid kit available Be sure your AED is accessible. A safe job begins with a thorough inspection of… Tools Be certain all of your tools are in good shape. Equipment Make sure your trucks are all in working order take time to preflight your equipment and insure there are no surprise. Line/Structure Look over the line and structure. Are there any potential hazards? (Broken insulators, damaged wire, clearances over roads or from trees?) Be aware of your work area, be sure to cover anything you can reach touch or fall into. And anything that can reach touch or fall into you! Discuss all PPE needed for the job and wear your PPE. Be sure to inspect your equipment prior to use. Identify all voltages you are exposed to. Be sure to have all of your Arc-Flash protective gear on. Identify a dedicated observer Working in traffic exposes you to hazards that are difficult to control. Give the vehicles plenty of time to see and avoid you! Follow the manual of traffic control for your area. Slips trips and falls are some of the most common injuries, look for hazards that could cause this. Be sure to inspect and wear your fall arrest harness. Here are the five topics again with signs and bubbles to jump start tailgate discussion!! Click on the icon to bring up a text box. Click on the icon again to make the text box go away Gets the crew involved. Gives the feeling of knowing it is ok to ask questions, give suggestions, see something, say something! The next slides will get directly into the task at hand. Visual, written and audio will all be used here! There are suggestions in the notes as to what to discuss. This will get the Team involved, creating communication channels to open!

5 Be sure to inspect the adjacent spans and structures for problems
Be sure to inspect the adjacent spans and structures for problems. Look for clearance hazards. Look for trees and traffic that may create a problem. Inspect the structure for additional hazards.

6 Bond the truck with the use of a hot stick.

7 Cover the neutral.

8 Place a hose over the service wire.

9 Use blankets to cover the transformer and any exposed conductors to protect from anything that could be reached touched or you could fall into.

10 Place a hose on the guy wire.

11 Place a protective blanket around the pole.

12 Use a short hose to cover the transformer jumper.

13 Place a sling around the pole and install your strap hoist.

14 Take the tension off of the bells to remove the pin.

15 Take the bad insulators out being sure to support the jumper and dead end shoe.

16 Install the new insulator string.

17 Put the strain back on the new insulators.

18 Remove the hoist and cover-up.

19 Move down to remove the pole cover.

20 Remove the pole cover.

21 Remove the guy cover.

22 Remove the blankets covering the transformer.

23 Remove the hose covering the service wire.

24 Remove the neutral cover and the truck bond.

25 The job is completed.


Download ppt "A5 Insulator Change Transformer Pole"

Similar presentations


Ads by Google