Presentation is loading. Please wait.

Presentation is loading. Please wait.

November 2008 Closing Report

Similar presentations


Presentation on theme: "November 2008 Closing Report"— Presentation transcript:

1 November 2008 Closing Report
Month Year doc.: IEEE /1428r0 November 2008 November 2008 Closing Report Date: Authors: Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

2 Month Year doc.: IEEE /1428r0 November 2008 Abstract Closing report for TGmb (Maintenance) for November 2008 plenary meeting in Dallas, Texas, USA. Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

3 Accomplishments Processed one interpretation request (#15)
Month Year doc.: IEEE /1428r0 November 2008 Accomplishments Processed one interpretation request (#15) Approved revised PAR Closed call for comments as input into revision process on November 10 104 comments received 28 comments resolved Sub-groups formed to propose resolutions in January interim meeting Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

4 Interpretation Request #1
Month Year doc.: IEEE /1428r0 November 2008 Interpretation Request #1 Request received from Johannes Berg : In , section ("Setup procedure at the AP") [for DLS] notes: "[...] Send DLS Response frame to the STA that sent the DLS Request frame with a result code of Not a STA, if the destination STA [...]“ Is this meant to say "[...] Send DLS Response frame to the STA that sent the DLS Request frame with a result code of Not QoS STA, if the destination STA [...]“ (note "Not QoS STA") Note: emphasis added Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

5 Interpretation Response
Month Year doc.: IEEE /1428r0 November 2008 Interpretation Response Designation Number: 15 Classification: Unambiguous Relevant Clauses: Response: IEEE Std contains a mapping of result codes from DLS setup primitives into status codes in Table Table 11-6 contains the result codes NOT_ALLOWED, NOT_PRESENT, and NOT_QOS_STA. The status codes defined by IEEE Std are found in Table 7-23, and use status code 50 for "The Destination STA is not a QoS STA.” The standard provides no additional detail. The question of whether additional detail is needed will be forwarded to the Working Group for consideration in the next revision of the P standard. Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

6 Teleconferences Weekly, 4 pm ET on Wednesdays November 2008 Month Year
doc.: IEEE /1428r0 November 2008 Teleconferences Weekly, 4 pm ET on Wednesdays Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

7 Objectives for January
Month Year doc.: IEEE /1428r0 November 2008 Objectives for January Find a volunteer as technical editor Prepare for March 2009 letter ballot Continue initial review Consider proposed resolutions and presentations to remaining comments Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks

8 Documents Agenda: 11-08/1330r4 Minutes: 11-08/1363r0
Month Year doc.: IEEE /1428r0 November 2008 Documents Agenda: 11-08/1330r4 Minutes: 11-08/1363r0 Interpretation response: 11-08/1366r0 Current issues list: 11-08/1127r7 Motions: 11-08/1388r0 Matthew Gast, Trapeze Networks Matthew Gast, Trapeze Networks


Download ppt "November 2008 Closing Report"

Similar presentations


Ads by Google