Update on FLOODsite Paul Samuels Coordinator 07 May 2007

2 Year 3 review 5 Tasks complete At Month 36
All major milestones achieved All major deliverables completed On target for research effort Behind target for expenditure 100 documents available to public from 170 publications in Year 3 07 May 2007 "Floods" Directive WG-F

3 Key areas of science Warning for flash flood risk mitigation
Hydro-meteorology of flash-flood events Use of a remote sensing (satellite and radar) Tool to identify likely flooding of roads by flash floods and rerouting of traffic identify vulnerable points combine with run-off model web based traffic rerouting Evacuation or place of safety as best strategy? 07 May 2007 "Floods" Directive WG-F

4 Flood defence infrastructure
Failure modes, processes and probability Inspection to assess condition 07 May 2007 "Floods" Directive WG-F

5 Inundation modelling Detail in urban areas
complex topography, geometry of buildings, roads, sewers, etc. 07 May 2007 "Floods" Directive WG-F

6 Large-scale “rapid” modelling
07 May 2007 "Floods" Directive WG-F

7 Risk evaluation – inundation probability and consequences
07 May 2007 "Floods" Directive WG-F

8 Exploring Scenarios 07 May 2007 "Floods" Directive WG-F

9 DSS for strategic alternatives
Southend barrier Existing system Flood storage, retreat Ongoing Maintenance Defence raising & Barrier work Decision/action point Defence raising DP1 DP2 DP3 DP4 DP5 DP6 Time 2006 2050 2100 DP = Decision pipelines (time varying portfolios) FRM system state at specific time - Only key new features listed Multiple options Complex situations 07 May 2007 "Floods" Directive WG-F

10 Link to Floods Directive
Preliminary Flood Risk Assessment Statistical methods for estimation of extremes Reliability of raised defences Flood Risk Mapping Runoff in steep ungauged basins Methods for hazard mapping Inundation modelling Flood (economic) damage estimation Loss of life estimation 07 May 2007 "Floods" Directive WG-F

11 Link to Floods Directive
Flood risk management plans Community preparedness and resilience Identification of sustainable flood mitigation measures Emergency evacuation planning Decision support for long-term planning Information exchange (e.g. with EXCIMAP) Pages and links on FLOODsite website Briefing note for WG-F 07 May 2007 "Floods" Directive WG-F

12 Links to others 79 EC and national projects / actions EXCIMAP
NEWater, OSIRIS FRMRC, MDSF-2, TE2100 RIMAX, VERIS-Elbe DSIG (US – Canada) US Army Corps of Engineers 07 May 2007 "Floods" Directive WG-F

13 Forward Plan Complete science in Year 4 (11 deliverables due)
Concentrate on integration of results Exploitation planning Public website update (16 May) Publication Guidance from our key results (2008) Lessons learned from pilot studies (2009) Masters level training material (2008) Project conference Oxford 30 September to 2 October 2008 07 May 2007 "Floods" Directive WG-F

14 Follow-up Location specific advice and work is outside our RTD contract Commitment to work on implementation Website Links to partner institutes and key scientists Administrator Alternative contact for a project expert 07 May 2007 "Floods" Directive WG-F