Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: [TG3 Opening Report 18Sep00]

Similar presentations


Presentation on theme: "Submission Title: [TG3 Opening Report 18Sep00]"— Presentation transcript:

1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [TG3 Opening Report 18Sep00] Date Submitted: [17Sept00] Source: [John Barr] Company [Motorola] Address [1750 E. Golf Road, Schuamburg, IL 60173] Voice:[ ], FAX: [ ], Re: [00253R1P802-15_TG3-sept00-Meeting-Objective-and-Agenda.xls] Abstract: [TG3 Chair Report to WG] Purpose: [TG3 chair report to WG to update them from the last session on all work items.] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by July 2000 doc.: IEEE /174r0 September 2000 John Barr, Motorola John Barr, Motorola

2 IEEE 802.15 Working Group for Wireless Personal Area Networks
July 2000 doc.: IEEE /174r0 September 2000 802.15 IEEE Working Group for Wireless Personal Area Networks TG3 Status Report September 2000, Scottsdale, AZ USA John Barr, Motorola John Barr, Motorola

3 Agenda Goals of September Meeting IEEE 802.15.3 PAR
July 2000 doc.: IEEE /174r0 September 2000 Agenda Goals of September Meeting IEEE PAR Status and plans for TG3 MAC/PHY/SYSTEM Committee Results Expected Results September Document List John Barr, Motorola John Barr, Motorola

4 Goals of the September Meeting
July 2000 doc.: IEEE /174r0 September 2000 Goals of the September Meeting Summarize conference call results and vote on acceptance of work. Review work letter ballots to date. Resolve issues with MAC/PHY/System evaluation process. Reduce possible options by at least 50%. Determine how to reach consensus selection of final MAC/PHY. Identify NOV00 Objectives John Barr, Motorola John Barr, Motorola

5 July 2000 doc.: IEEE /174r0 September 2000 IEEE PAR Wireless Medium Access Control (MAC) and Physical Layer (PHY) Specifications for High Rate Wireless Personal Area Networks (WPAN) … wireless connectivity with fixed, portable and moving devices within or entering a Personal Operating Space (POS) (up to 10 meters in all directions enveloping a person) … interoperability or coexistence with other TG … coexistence with other wireless devices in conjunction with Coexistence Task Groups such as … low complexity, low cost, low power … >20Mbps to satisfy a set of consumer multi-media industry needs for WPAN communications. John Barr, Motorola John Barr, Motorola

6 Status and Plans for TG3 Construction of Initial Draft Schedule
July 2000 doc.: IEEE /174r0 September 2000 Status and Plans for TG3 Construction of Initial Draft Goal: everything you need to know to construct the lower layers of high rate WPAN Schedule Goal: Produce a Standard by the end of 2001 or early 2002 Next Steps Goal: Reduce number of candidate MAC/PHY, September, Select candidate MAC/PHY, November, Working Group draft, May, Sponsor ballot, November, 2001. John Barr, Motorola John Barr, Motorola

7 July 2000 doc.: IEEE /174r0 September 2000 Teleconference Calls Goal: Complete criteria document update, evaluate proposals, combine proposals into better solutions, prepare for first ranking cut. General: Held every Tuesday between F2F meetings. PHY Committee: Every Thursday. MAC Committee: Every Tuesday following general call. System Committee: Three special calls. John Barr, Motorola John Barr, Motorola

8 Proposed Process Updates
July 2000 doc.: IEEE /174r0 September 2000 Proposed Process Updates Informative comments on evaluation criteria will be noted in appendix to 110R13 (TG3 Criteria Definitions) authored by MAC, PHY, and Systems Committee chairs. Consider MAC and PHY separately, optimizing task group resources. PLCP and PMD functionality will be defined for as the basis for the initial draft MAC choice may be concluded prior to final PHY choice. John Barr, Motorola John Barr, Motorola

9 Current Proposals MAC PHY Davis/Skellern Heberling Kinney Rios Davis
July 2000 doc.: IEEE /174r0 September 2000 Current Proposals MAC Davis/Skellern Heberling Kinney Rios PHY Davis Skellern/de Courville Allen/Carlson O’Farrell Dabak McCorkle/Rofheart Karaoguz Rios John Barr, Motorola John Barr, Motorola

10 September Document Summary (1 of 2)
July 2000 doc.: IEEE /174r0 September 2000 September Document Summary (1 of 2) John Barr, Motorola John Barr, Motorola

11 September Document Summary (2 of 2)
July 2000 doc.: IEEE /174r0 September 2000 September Document Summary (2 of 2) John Barr, Motorola John Barr, Motorola

12 Key September Sessions
July 2000 doc.: IEEE /174r0 September 2000 Key September Sessions Monday and Tuesday: Review of committee work and resolution of outstanding issues. Monday at 5PM: Presentation of ballot for ranking vote on Wednesday. Wednesday 1:00 PM. (Joint TG1 and TG3 meeting.): Legal presentation on reuse of MAC. Wednesday 4:00-5:30 PM: Final call for floor comments and ranking vote. Thursday 8:00 AM: Ranking vote results. Thursday: Develop process and work on further reduction of proposals down to final MAC/PHY pair for initial draft standard. John Barr, Motorola John Barr, Motorola

13 July 2000 doc.: IEEE /174r0 September 2000 No work next week Conference calls will not resume until week of October 2nd. John Barr, Motorola John Barr, Motorola


Download ppt "Submission Title: [TG3 Opening Report 18Sep00]"

Similar presentations


Ads by Google