Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAMAS Working Group 7-8 December 2016

Similar presentations


Presentation on theme: "LAMAS Working Group 7-8 December 2016"— Presentation transcript:

1 LAMAS Working Group 7-8 December 2016
Agenda Item 2.2 IESS - Breaks in time series Eurostat

2 Background Needs for a common strategy
Common strategy not to be prescriptive: just an ordered list of possible approaches to choose among Financing Eurostat

3 Comments received Do you agree on the criteria proposed for drafting the list of indicators to be covered by the common strategy? YES 30 NO 4 Do you agree on the list of communication/dissemination strategies to be evaluated in the next TF1 meeting? YES 32 NO 2 Proposal for both enlarging and reducing the list, it will be discussed in TF1 Further strategies can be taken into consideration, details are needed Eurostat

4 Comments received Do you agree on the list of methodologies proposed for each possible communication /dissemination strategy to be ranked in a 3 categories scale? YES 29 No 4 Do you agree on the list of possible ways to plan the overlapping period and the overlapping sample? YES 29 No 4 Overlapping sample concern only countries choosing this method No gradual introduction Parallel Sample size can be discussed Eurostat

5 Results of LAMAS consultation
Envisaged methods: 3.1 : 6 3.2 : 7 4 : 12 Not yet : 6 Open questions for countries envisaging to adopt 3.1 or 3.2: how will you run the seasonal adjustment of quarterly regular series how to deal with indicators for which long time series are requested (ex. MIP scoreboard) Eurostat

6 Additional points to be discussed in TF1
Legal statuses of the revisions Span of the revisions Eurostat


Download ppt "LAMAS Working Group 7-8 December 2016"

Similar presentations


Ads by Google