Presentation is loading. Please wait.

Presentation is loading. Please wait.

Scaldit: Scaldis Integrated Testing

Similar presentations


Presentation on theme: "Scaldit: Scaldis Integrated Testing"— Presentation transcript:

1 Scaldit: Scaldis Integrated Testing
Pilot River Basin workshop Ghent, October 5th 2004 Scaldit: Scaldis Integrated Testing Scheldt Pilot River Basin: example of an Interreg III project Ilke Dieltjens Vlaamse Milieumaatschappij (Flanders) Pilot River Basin workshop, Ghent, 4-5 October 2004

2 Overview 1. Partners and context of the project
2. Scaldit - action plan and results 3. Transnational co-operation 4. Importance of Interreg funding 5. Conclusions Pilot River Basin workshop, Ghent, 4-5 October 2004

3 Project partners and competent authorities
Pilot River Basin workshop, Ghent, 4-5 October 2004

4 Scaldit - Facts and figures
Duration of the project: Total budget: 6,5 mio € Co-financing by the Interreg IIIB NWE Programme (ERDF Grant Rate = 50%) Interreg IIIB NWE - Programme Priority 3: “Sustainable management of water resources and prevention of flood damages” Pilot River Basin workshop, Ghent, 4-5 October 2004

5 Context of the project Water Framework Directive (WFD) (2000/60/EG) - Common Implementation Strategy (CIS) Objective of the project: transnational characterisation of the Scheldt river basin district (WFD art. 5) pilot project (one of 15 pilot river basins) by testing guidance documents CIS common view “space for water” Organisation: 10 project groups, embedded in International Scheldt Commission Pilot River Basin workshop, Ghent, 4-5 October 2004

6 International Scheldt Commission (ISC)
Pilot River Basin workshop, Ghent, 4-5 October 2004

7 Schematic overview reporting obligations
France analysis art. 5 Wallonia Flanders Brussels The Netherlands Fed. state Belgium Thematic reports (reports with results: one per project group) Scaldit report Transnational analysis of the characterisation Interreg PRB Roof report WFD art. 5 EC (DG XI) SCALDIT Pilot River Basin workshop, Ghent, 4-5 October 2004

8 Scheldt International River Basin District
Length of the river Scheldt: 350 km Surface river basin: km² Surface river basin district: km² Ecoregion river/lakes: Western plains Ecoregion trans/coastal: North Sea Pilot River Basin workshop, Ghent, 4-5 October 2004

9 Scaldit : Action Plan 1. Characterisations RBD
2. Data and information management 3. Water management and spatial planning 4. Communication and raising awareness 5. Up to the IRBMP Pilot River Basin workshop, Ghent, 4-5 October 2004

10 Scaldit: Action Plan 1. Characterisations RBD
2004 obligations: characterisation RBD pressure & impact economic analysis  by testing guidance documents CIS Results: Experience reports (Oct 03, May 04) on guidance documents Thematic report per project group (final drafts) Scaldit report: transnational characterisation of the Scheldt RBD (Dec 04) Pilot River Basin workshop, Ghent, 4-5 October 2004

11 Characterisation : example
Pilot River Basin workshop, Ghent, 4-5 October 2004


Download ppt "Scaldit: Scaldis Integrated Testing"

Similar presentations


Ads by Google