Presentation is loading. Please wait.

Presentation is loading. Please wait.

VDOT’s Instant Roundabout

Similar presentations


Presentation on theme: "VDOT’s Instant Roundabout"— Presentation transcript:

1 VDOT’s Instant Roundabout
Randy Dittberner, P.E., PTOE

2 Braddock & Pleasant Valley
$5.8 million

3 Purcellville $6.9 million

4 Gilbert’s Corner $15.8 million

5 South Riding, Va.

6 South Riding, 2002

7 South Riding, 2015

8

9 Issues AM peak delays over 3 minutes In 4 years: 27 crashes
35 injuries

10

11 Options Do Nothing All-Way Stop Traffic Signal Roundabout

12 ~95’

13

14 $0.09 million

15

16

17

18

19 29% 89%

20

21

22 2017 National Roadway Safety Award

23 Coming in 2018 $1.9 million

24 Questions Randy Dittberner, P.E., PTOE Lee Engineering

25


Download ppt "VDOT’s Instant Roundabout"

Similar presentations


Ads by Google