Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP2 – Operational Context & Scenario

Similar presentations


Presentation on theme: "WP2 – Operational Context & Scenario"— Presentation transcript:

1 WP2 – Operational Context & Scenario

2 Legacy signalling systems
CENTRAL CONTROL ROOM Copper cable telephone line (dedicated) SIGNALLING BOX WAYSIDE EQUIPMENT Steel wire or Copper cable (dedicated)

3 Legacy signalling systems
CENTRAL CONTROL ROOM Copper cable telephone line (dedicated) SIGNALLING BOX WAYSIDE EQUIPMENT Copper cable (dedicated)

4 Modern signalling systems
CENTRAL CONTROL ROOM IP Network WAYSIDE EQUIPMENT SIGNALLING BOX Copper cable or IP

5 Modern signalling systems
REAL SYSTEM CONFIGURATION

6 CYRail scenario


Download ppt "WP2 – Operational Context & Scenario"

Similar presentations


Ads by Google