Presentation is loading. Please wait.

Presentation is loading. Please wait.

doc.: IEEE <doc#>

Similar presentations


Presentation on theme: "doc.: IEEE <doc#>"— Presentation transcript:

1 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> July 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG HRRC Closing Report for July 2015] Date Submitted: [16 July, 2015] Source: [Junhyeong Kim, Bing Hui] Company [ETRI] Address [218 Gajeong-ro, Yuseong-gu, Daejeon, , KOREA] Voice:[ ], FAX: [ ], Abstract: [IG HRRC closing report for July 2015] Purpose: [IG HRRC closing report for July 2015] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Junhyeong Kim, ETRI <author>, <company>

2 Big Island Hawaii, USA Thursday AM2, July 16, 2015
IEEE IG HRRC (High Rate Rail Communications Interest Group) Closing Report Big Island Hawaii, USA Thursday AM2, July 16, 2015 Junhyeong Kim, ETRI

3 IG Group Leadership Chair : Junhyeong Kim (ETRI, South Korea)
July 2015 IG Group Leadership Chair : Junhyeong Kim (ETRI, South Korea) Secretary : Bing Hui (ETRI, South Korea) Junhyeong Kim, ETRI

4 Sessions 4th meeting for IG HRRC 1 session 10 participants
July 2015 Sessions 4th meeting for IG HRRC Joint 15/16 meeting 1 session Thursday AM2 (10:30 ~ 12:30), July 16, 2015 10 participants Junhyeong Kim, ETRI

5 Meeting Objectives 2 Presentations Further discussion on
July 2015 Meeting Objectives 2 Presentations Worldwide overview of WiFi on trains Train Communications Systems 2015 Conference, held in June (10th and 11th), in London, and organized by BWCS Finalization of Call for Participation (CFP) document Further discussion on A brief Introduction to recent demonstration results of a mmWave-based system achieving 500Mbps data rate Future plans for the IG HRRC Junhyeong Kim, ETRI

6 Contributions 4 contributions
July 2015 Contributions 4 contributions Contribution #1 ( hrrc) : Agenda of Joint 15/16 IG HRRC Meeting Contribution #2 ( hrrc) : Worldwide Overview of WiFi on Trains Contribution #3 ( hrrc) : Meeting Minutes of July 2015 Contribution #4 ( hrrc) : Closing Report for July 2015 Junhyeong Kim, ETRI

7 Meeting Accomplishments
July 2015 Meeting Accomplishments Worldwide Overview of WiFi on Trains Finalization of Call for Participation (CFP) document Technical discussions Network architecture Beamforming Handover Discussion on the strategies and future plans for promoting the IG HRRC Junhyeong Kim, ETRI

8 Plans for September Meeting
July 2015 Plans for September Meeting Discussion on channel modeling of mmWave for railway Some related simulation results will be shown and discussed Especially for tunnel environments Other specific parameters have been determined through IG HRRC reflector Discussion on beamforming issues in high-rate rail communications Junhyeong Kim, ETRI

9 July 2015 Thank you Junhyeong Kim, ETRI


Download ppt "doc.: IEEE <doc#>"

Similar presentations


Ads by Google