1 Sheryl Welch ATFWG Chair
Discussion Item: Do we do an ATF Adjustment for a generator that goes off line. ISAS August 2015 Salt Lake City, UT

2 Definition of General Imbalance
The Generation Imbalance is a Control Area Service and is applicable to generation when there is a difference between the energy generation and the actual energy generation delivered from that generation during a scheduling period.

3 Facts: ABC generator went off line on 6/19 @ 13:00 due to boiler leak
Sink was adjusting tag when the generator came offline. First 11:13 which was zeroed out for the remainder of the day Second 21:54 which adjusted to zero for 6/20

4 Facts (Cont’d) On 6/21—RTO realized that tag was flowing and had not been adjusted to zero. RTO curtailed tag to 0331 for remainder of day. Tag flowed for HE

5 Discussion Should an ATF adjustment be made if a generator goes offline?