Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tony Mathis Luke Buchanan Tasha Hart Carter McCall

Similar presentations


Presentation on theme: "Tony Mathis Luke Buchanan Tasha Hart Carter McCall"— Presentation transcript:

1 Tony Mathis Luke Buchanan Tasha Hart Carter McCall
Totally Tubular Tony Mathis Luke Buchanan Tasha Hart Carter McCall

2 Design Time Materials Construction The Building Process

3 Cost Most wood used was scrap Dowel rods, 5 ($.92 each = $5.03)
PVC ($5.32) Rubber tubing, 25 ft ($15.49) 5 ft scrap Duct tape ($3.95) BB’s (compliments of Ace Hardware) Total cost $29.79 Cost

4 Start A B End Critical Points

5 Equations Conservation of Energy D = VT A: v = 11.08 ft/s
PEgrav = KE vf = √vx2 + vy2 mgh = ½ mvf2 D = VT A: v = ft/s B: v = ft/s Bottom: v = ft/s Equations


Download ppt "Tony Mathis Luke Buchanan Tasha Hart Carter McCall"

Similar presentations


Ads by Google