Presentation is loading. Please wait.

Presentation is loading. Please wait.

Business Operating System

Similar presentations


Presentation on theme: "Business Operating System"— Presentation transcript:

1 Business Operating System
ZFLS – Germany Accountability ZFLS – Germany Accountability ZFHS – St. Thomas, Ontario, Canada Accountability Order Acquisition Sales / Marketing / Design / Contract Review Order Fulfillment Warrantee Fulfillment Modification Notice Received Log Modification Notice within SAP Quality Plan Ship Produce Note: ZFLS has Design Authority – ZFHS processes Modification Notices as per ZFLS notification Input relevant Changes Quality EDI Release > > Dealer Delivery Distribute Modification Checklist Signoff Drawing Change All effected areas to update Drawing in use Quality Yes Quality / Logistics / Engineering / Production No Parts list change Logistics Bill of Materials update Yes Production Related Rework No Technical Data Quality / Logistics / Engineering / Production Update Bill of Materials and/ or Drawing prints in use Yes Finished goods 44 DO Create production order for rework volume Approved Demand Approval of purchase request according to signing authorities Fill out Purchase request form Set up P.O. in SAP Issue P.O to supplier Logistics / Purchasing Materials Expensed Employee Unfinished goods 44 CO No Op 90 Reservoir Only Accept Delivery Clarify volume / price no Return to Supplier Reservoir Production Yes Conforming Scrap Unfinished goods 44 CO In Production 44PO yes Logistics / Purchasing Op 300 No Yes No Correct P.O price / volume Logistics / Purchasing Pack completed assembly into shipping container Remove raw materials needed for Rework from 44PO / 44SO Yes no Band Required Process Rework Successful? Finished goods 44 DO Shipment volumes & prices Accurate P.O. existing? Logistics yes Receive shipment against P.O / Follow Product Acceptance criteria Ship to GM? Internal /Supplier Nonconforming Product 44 QO No Logistics /Quality Yes Central Inventory Components 44SO No Logistics Remove Reservoir, and Band from Box Assembly Band on Reservoir Yes Material Expensed MSDS Available Acceptable Clarify with purchasing Receiving Op 600 Yes Partial Op 60 Ship Product to GM with Green dot as per GP-12 requirement and sign off from QA Manager Yes Bracket Required Final Inspection NO Environmentally controlled ? NO NO Yes Record labor cost and material for rework Verify WHIMIS label Hold until MSDS Available Apply Shop Label Yes Install Reservoir, Band and Bracket in fixture Remove Reservoir, Bracket and Band from Box Install and tighten Bolt to specification Add Label to Band Material handler verifies correct location of truck. Unloads truck.Obtains paperwork from driver. Counts # of skids and checks load If qty of skids doesn’t match or there is damage to any skid, this is to be marked on freight bill and the Driver is to initial/sign and supervisor is notified Material handler puts labels on the skid And moves parts to the assigned location NO QA inspect? Op 80 44SO Central Inventory Op 50 Op 60 Op 70 After truck is unloaded, material handler signs Paperwork and keeps a copy Product is washed according to appropriate cycle for product type & rack used Yes Piston, Worm, Housing, Cylinder Cover, Sector Shaft and Drilled Torsion Bar placed in appropriate racks and moved to washer The material handler compares the packing slips To part # on the containers/skids. If necessary Wooden crates are removed and skid is prepared For put away – mixed parts are put on separate skid QA32 Awaiting QA release (44QO unrestricted) Material handler gives all paperwork to the Logistics office or puts in the assigned slot Op 110 Yes Op 10 & Op 20 Op 105 Subassembly of Torsion Bar Valve Body (WI~015) Is Training Required? NO Steering Gear Assembly Verify Torsion Bar/Valve Ass’y Setup & First Off Op 100 release to Accounting Accounting Wash Logistics Procurement receives paperwork and Enters the receipt for each part into SAP on the MIGO screen Parts are issued to sub-assembly Ops No Yes Accounting sign Op 270 Assess training need Op 120 Op 125 100% Testing in-line at Cell 70 Op 550 Conforming Op 130 Labels automatically print for each part with warehouse location assigned Subassembly Worm Group Bench Op Hydraulic Drilling Setup & First Off Verification Logistics Drilling Hydraulic Centre~019 yes Pitman Arm? Op 280 Conduct Training verify Attach Serial Number Plate Cell 80 preformed Invoice / Customs correct manual Op 150 no Op 135 Op 137 Op 140 Op 285 Subassembly piston and steering limiter valve WI~016 goods cleared No Piston Screw Machine Setup & First Off Verification Piston Worm Machine Setup & First Off Verification Subassembly of Worm Gear and Piston WI~020 Op 140 Yes Training Effective? Assembly Pitman arm to steering gear WI~013 NO Yes Op 290 Torque locking nut & stake to sector shaft Cell 90 WI~014 Op 300 Op 160 Op 400 complete shipment in SAP Subassembly Cylinder covers WI~018 Attach lock nut /Pack completed assemblies into shipping container Process Suspect Product Final Assembly of Steering Gear Complete transfer in SAP system and place into designated inventory location Final assembly Cells See WI~003 to WI~009 Op Op 500 Op 525 Op 700 Return Authorized Goods received at ZFHS Ship to sub-contractor for paint op Receiving Inspection goods Received at Customer Location Logistics load truck Ship Logistics / Accounting Logistics call transport company Logistics RGA notification sent to ZFHS Accounting RGA notification sent to Customer RGA notification sent to ZFHS Receiving order o.k. End yes verify SAP with transportation I Shaft Assembly Subassembly of Station 1 Capping of Spider Joint WI~025 Op 100 change system Address Concern: Op 10 & Op 20 Subassembly of Station 2 Profile Shaft Sub Assembly WI~026 Op 110 Assign RGA Number no No Discussion: Is the “Quality Concern” an issue to be corrected and rectified Subassembly of Station 3 Friction Test Station WI~027 Op 120 Representation required at Customer Site Customer Complaint (GM specific) Op 600 Subassembly of Station 4 Crimping WO~028 Final QA Inspection As required Yes Op 130 Issue Return Authorization Op 550 Pick / Pack / Label /Barcode No Check angular play in I-Shaft Op 140 Logistics Label correct? Replace label with conforming information (Part Number and date) Yes Generate Internal System NCR Send certified replacement product to Customer Comply with Customer corrective Action requirements No Send Representation Conforming? Sort ZFHS Product Return Product: Yes Yes Meets test parameters? Assess No Certify Stock at customer site: Conforming Zero Defect Reoccurrence Track Trends Internal Product Nonconformance Supplier Product Nonconformance Yes Quality Yes Ship to GM? No Op 600 Generate Incident Report Ship Product to GM with Green dot as per GP-12 requirement and sign off from QA Manager Final Inspection Refer to Final Inspection Form ZFHS-1510-QA Op 300 Accountable Party Level Environmental Nonconformance NO Root Cause Analysis Assign NCR / set target date Quality Yes No Direct Scrap Yes Major Emergency NO Implement Corrective Action Effective? QA Released NO Yes Suspect Product Conforming Yes Return to 44PO / 44SO / 44CO / 44DO or Return to Customer Yes Tag QA Assess Follow Emergency Plan PR-036 Plan & Implement Preventive Action if appropriate No No Internal Product Nonconformance Issue NCR / Incident Report Quality No Quarantine 44QO Quality Effective? Zero Defect Reoccurrence / Close NCR Return to Supplier Yes Determine Accountability Obtain Supplier RGA# Return to Supplier at Supplier Expense Certified replacement stock Supplier Nonconforming product Disposition Supplier Product Nonconformance Issue NCR / Incident Report Disposition Obtain Supplier Rework Authorization Rework at Supplier Expense Conduct Rework Conforming Stock Scrap at Supplier Expense Certified replacement stock Obtain Supplier Scrap Authorization Scrap


Download ppt "Business Operating System"

Similar presentations


Ads by Google