Presentation is loading. Please wait.

Presentation is loading. Please wait.

COMPANY NAME Business Continuity Plan Date Presented by.

Similar presentations


Presentation on theme: "COMPANY NAME Business Continuity Plan Date Presented by."— Presentation transcript:

1 COMPANY NAME Business Continuity Plan Date Presented by

2 Purpose Comprehensive disaster recovery plan is driven by customers & risk factors Contingency plans are designed to prevent interruption to customer supply chain

3 Strategy Protect operating capability
Response due to utilities failure and/or interruption Recovery plans or Preventative measures against catastrophic events Earthquakes Fires Floods or others Failure of Key Equipment Raw material supply security Labor Shortage

4 Utilities Failures Power Water Gas (Provide plan for how facility will operate in case there is a long-term interruption to these utilities; you may “N/A” if there are not used in the production of our parts)

5 Prepared for Catastrophic Events
How is your Company prepared to deal with Earthquake Fire Floods

6 How is your Company prepared to deal with key equipment failure:
(Specify plans)

7 Data Management Define how electronic data is back-up and how quickly can it be restore in case of network breakdown.

8 How is your Company prepared to deal with raw material issues:
Specify how do you control quality of suppliers Specify how you manage supplier relationships Specify how are you positioned to in case of raw material shortages

9 Define plan in case you run short of labor
Labor Shortage Define plan in case you run short of labor Employee sick/epidemic Worker Strike


Download ppt "COMPANY NAME Business Continuity Plan Date Presented by."

Similar presentations


Ads by Google