Download presentation
Presentation is loading. Please wait.
1
AURTHORs, Mr. Emmanuel Kisendi (Msc.)1
Lake Victoria Basin Water Board - Tanzania Co- authors, Moiteela Lekula (PhD)2 and Dr. M. W. Lubczynski, (Maciek)2 Title: Groundwater Resources Evaluation- Central Kalahari - Karoo Basin
2
OVERVIEW Study area and problem statement
Research objectives and Hypothesis Research methodology Results and discussion Conclusion and recommendations Dry season Wet season
3
1: STUDY AREA Land scape Gauge data collection GW Monitoring BH
KKB ~ 325,210 Km2 LNKB ~ 47,829 Km2
4
Problem statement Need to understand the 3D hydro-stratigraphy of KKB
Proper conceptualization of LNKB Need to estimate recharge by IHM approach
5
2: Objectives
6
3.Methodology Use of boreholes ( RockWorks software)- to develop the Hydrostratigraphy model of KKB Use of Modflow – NWT to estimate recharge
7
.Methodology cont…
8
4. RESULTS- (a)Stratigraphy and hydrostratigraphy I: Stratigraphy
9
II. Hydrostratigraphy
10
Stratigraphy
11
II.Hydro stratigraphy
12
(b)Hydrostratigraphy thickness (i) Ntane and (ii) Ecca
13
LNKB Conceptual model Boundary conditions Conceptual model
Driving forces
14
Steady state model calibration Hydraulic heads-Ntane Sandstone
15
WATER BUDGET-Volumetrics
16
5.Conclussion and Recommendations
The 3D hydro - stratigraphic model of KKB was properly presented LNKB GW model could be well conceptualised The overall NET RECHARGE of LNKB was 0.03 mm yr-1 RECOMMENDATIONS Transient model to quantify aquifer storage, specific yield, The aspect of borehole abstraction should be included.
17
Ahsanteni kwa kunisikiliza “Thank you for listening”
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.