Download presentation
Presentation is loading. Please wait.
1
Accredited Standards Committee C63® - EMC
Report of SC-4 Wireless and ISM equipment measurements Art Wall Chairman of SC-4 November 9, 2014
2
Accredited Standards Committee C63® - EMC
Scope Subcommittee 4 is responsible for writing and maintaining existing and proposed C63® standards for wireless and ISM devices. Working Groups: C63.10 WG – Unlicensed transmitter test procedures C63.26 WG – Licensed transmitter test procedures C63.29 WG – Lighting devices test procedures C63.30 WG – WPT equipment test procedures C63.31 WG – ISM equipment test procedures
3
Accredited Standards Committee C63® - EMC
SC-4 Membership Name Role within SC Affiliation Attayi, Masud Member Blackberry Corporation Case, David Cisco Systems Chen, Zhong ETS-Lindgren DeLisi, Bob Vice Chair UL LLC Dickten, Thomas GC Consulting Elliott, William (Mac) Advanced Compliance Solutions, Inc. Hodes, Harry Bay Area Compliance Laboratories Corp. Hoolihan, Dan Hoolihan EMC Consulting Howard, Mike Liberty Labs Jones, Steve FCC Laboratory Kiemel, Greg Northwest EMC Ernesto Mendoza Philips Lighting Electronics NA Moongilan, Dheena Nokia Nixon, Jason Innovation, Science & Economic Development Canada Pino, Dan PCTEST Engineering Laboratory, Inc. Schaefer, Werner Schaefer Associates Sigouin, Dan DHS-EMC Waitt, David Consultant Wall, Art Chair Radio Regulatory Consultants Ward, Dennis PCTEST Engineering Laboratory Whitesell, Steve Whitesell Consulting, LLC
4
Accredited Standards Committee C63® - EMC
SC-4 meeting November 9, 2016 Meeting Attendance: 24 Status of WG projects: C – PINS approved 11/11/15 for 3rd Ed. and a draft is under development . Issues: video averaging; test reduction and reporting requirements; multi-carrier installations; testing of modular devices; inter-mod testing and limits; JTFs with C63.26 WG.
5
Accredited Standards Committee C63® - EMC
Status of WG projects: C – 1st edition adopted 1/16/16 (not yet adopted by FCC); PINS for 2nd Ed. submitted 6/3/16 (expanded scope to cover recent FCC rulemaking (e.g., 5G proposal); radiated emission TG; JTG for mm wave with short and long term solutions being considered. C x – PINS approved 5/7/15; a rough draft was circulated and comments discussed; a 2nd draft to be circulated early 2017; major issues include: use of van veen loop; equipment set-up, CISPR 11 and MP-5; agreed that the document would be self-contained.
6
Accredited Standards Committee C63® - EMC
Status of WG projects (continued): C x – PINS approved 5/7/15; WG has 48 members; typically 2 conference calls per month; extensive testing under way; initial draft 85% complete; comparison testing for use of van veen loop under way; extrapolation data is being developed; in-situ testing will be included; document to be self-contained. C x – PINS approved 5/7/15; draft circulated using MP-5 as a starting point; comparison of MP-5 and CISPR 11 discussed; agreed that standard will be self-contained; test site and in-situ testing will be included; new draft to be circulated in January 2017.
7
Accredited Standards Committee C63® - EMC
Motions No motions were made at this meeting.
8
Accredited Standards Committee C63® - EMC
Conclusions Body Text (headings) Body Text
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.