Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison Report Date: Authors: November 2013

Similar presentations


Presentation on theme: "Liaison Report Date: Authors: November 2013"— Presentation transcript:

1 802.15 Liaison Report Date: 2013-11-15 Authors: November 2013
July 2013 January 2009September 2008 September 2008 doc.: IEEE /0924r0 November 2013 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

2 Abstract Liaison report on 802.15 as presented to 802.11 November 2013
September 2008 January 2009September 2008 July 2013 doc.: IEEE /0924r0 November 2013 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

3 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 IEEE SA is now rolling up 15.4e, 15.4f, 15.4g, 15.4j,15.4k onto amendments such as 4m, 4p, and 4s will be added if they are approved during the revision period Corrections found in will be applied to roll-up Document will be updated to include agreed upon ETSI changes Clause 4 – General Description (informative), will be editorially restructured to only include capability of the standard, i.e. move application information to an informative annex. Various annexes will be reviewed for applicability Review/change for editorial correctness Schedule Start Revision Effort: November, 2013 Letter Ballot Start: April, 2014 Sponsor Ballot Start: July, 2014 Approval: December, 2014 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

4 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 m TV White Space Recirculation Sponsor Ballot on IEEE m D4.0 closed October 24, Results: 108/4/ % 166 comments received, Editorial 82, General 2 & Technical 82 All comments resolved Remaining four “no” voters changed vote to “yes” Recirculation to start in January Asking 802 EC this week for conditional approval to submit to RevCom Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

5 802.15.4n Chinese Medical Band Reviewed Draft
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 n Chinese Medical Band Reviewed Draft First WG Ballot to open soon Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

6 802.15.4p Rail Communications and Control
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 p Rail Communications and Control Recirculation Sponsor Ballot on IEEE p D4.0 closed November 4, Results: 67/1/ % Passed 1 comment received Resolved the comment Recirculation already started; will close November 23 “No” vote already converted to “Yes” Asking the EC Friday for conditional approval to submit to RevCom Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

7 802.15.4q Ultra Low Power Heard proposals Identified list of tasks
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 q Ultra Low Power Heard proposals Identified list of tasks Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

8 802.15.8 Peer Aware Communications
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 Peer Aware Communications 6 Proposals related to a technical discussion for PAC Framework Document DCN 593r1: Categorization of TG8 PHY proposals (Marco Hernandez) DCN 648r0: Complementary frame structure for TDD mode (Marco Hernandez) DCN 649r0: Addressing coexistence PAC devices with devices (Marco Hernandez) DCN 650r0: Collision Detection Based Random Access Scheme for IEEE TG8 PAC (Byung-Jae Kwak) DCN 666r0: Service identification and management for supporting multiple grades of service at the MAC sublayer (Seong-Soon Joo) DCN 701r0: Application Awareness for PAC(Qing Li) 9 Proposals proposing text for PAC Framework Document DCN 651r1: Text Proposal for IEEE TG8 PFD: Discovery Types (Byung-Jae Kwak) DCN 395r1: Text proposal for PFD (Suhwook Kim) DCN 369r1 : NICT PHY Proposal (Part A) (Marco Hernandez) DCN 708r0 : distributed time synchronization for PAC (Chang Sub Shin) DCN 368r1 : PAC link layer specification (draft) (Seong-Soon Joo) DCN 686r0 : NICT Impulse Radio Ultra-Wideband PHY Proposal to IEEE (text for the Framework Doc.) (Igor Dotlic) DCN 371r2 : NICT PHY Proposal (Doc) (Marco Hernandez) DCN 707r0 : NICT PHY proposal document (short version) (Marco Hernandez) DCN 716r0 : Merged DecaWave and NICT IR-UWB PHY proposal to IEEE (Igor Dotlic) Discussion on “Draft PAC Framework Document” Doc. 328r8: Byung-Jae Kwak, Shannon Park Two ad-hoc groups for PFD texting MAC ad-hoc group lead by Qing Li PHY ad-hoc group lead by Marco Hernandez Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

9 802.15.9 Key Management Protocol
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 Key Management Protocol Reviewed progress on tg9 document p d01.pdf Discussed proposed changes tg9-proposed-document-changes.ppt Goal of Jan 19 complete document Slide 9 Slide 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 9 Page 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

10 802.15.10 Layer 2/Mesh Under Routing (L2R)
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 Layer 2/Mesh Under Routing (L2R) Joint session and Discussion w/802.1 Revised Use Cases/Requirements Doc. Reviewed Timeline Heard 2 Presentations Use Cases in Lighting (doc. # ) L2 Routing Requirements (doc. # ) Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

11 Better Use of Spectrum Resources in WPANs (SRU) SG
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 Better Use of Spectrum Resources in WPANs (SRU) SG Heard three presentations Wireless coexistence for industrial automation( ) by Ludwig Winkel Additional usecase of temporal industrial network deployment ( ) by Shusaku Shimada Simulation Methodology for SRU( ) by Takashi Yamamoto Review working 5C document SRU Working draft 5C( ) by Masa Ariyoshi Update proposal on the draft 5C( ) by Masa Ariyoshi Developed working PAR document SRU Working draft PAR( ) by Shoichi Kitazawa Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

12 THz SG Tasks completed during the meeting:
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 THz SG Tasks completed during the meeting: Document thz has been presented to the joint session with IEEE and IEEE TG 10. The recommendatiion is to write a PAR for the amendment of IEEE 802.1ac Working Drafts for PAR and 5C have been further discussed (Documents thz and thz). To support the technical claims made in the 5C the living document with references has been updated (to appear as Document thz) Work on the Technical Expectation Document (TED). The content of the TED has been discussed and updated (Document thz. A living document on Study Group items has been created (Document thz) A call for application will be created for the January Interim meeting. Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

13 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 LED IG Main focus of IG-LED and SG-LED: Camera Communications LBS(location based service) LED-ID applications (digital signage applications) MIMO (Multi array LED) Presentations Contribution 1 - Challenging Issues in CamCom System ( led) Contribution 2- Draft PAR for CamCom ( led) Contribution 3- Draft 5C for CamCom ( led) Contribution 4- Camera Positioning Technology ( led) Completed Call for Applications document ( led) Discussion about PAR and 5C Requesting to form a Study Group Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

14 Dependable IG Review Discussion in Previous Meetings
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 Dependable IG Review Discussion in Previous Meetings Heard Presentations dep-Focused-Use-Cases-and-Possible-Timeline-of-Dependable-Wireless-M2M-and-BAN Discuss Focused Use Cases Necessary Process and Possible Timeline to SG and higher steps Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

15 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 WNG SC Two innovative energy efficient IEEE MAC sub-layer protocols with packet concatenation: employing RTS/CTS and multi-channel scheduled channel polling by Noberto Barroca ( ) Proposal for a Study Group focusing on ranging support for WPAN’s by Dietmar Eggert ( ) Vote on moving this concept to a Study Group: 32 for, 0 against, and 10 with no opinion European Low Rate PHY by Larry Taylor ( ) Vote on moving this concept to a Study Group: 31 for, 1 against, and 5 with no opinion 6TiSCH for a new IPv6 MultiLink subnet by Pascal Thubert ( ) Significant support to start an interest group focused on collaboration with IETF 6TiSCH Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

16 Maintenance SC Proposed changes to Operations Manual (15-10-235-12)
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2013 Maintenance SC Proposed changes to Operations Manual ( ) Creation of Technical Expert Group BRC reaffirmation at opening plenary of all sessions (plenary and interim) Inclusion of recommended motions template Changes to ANA scope and process for external organizations Miscellaneous edits (e.g. fixed cross-references, spelling corrections) Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

17 References This document All Documents
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /0924r0 doc.: IEEE /0697r0 November 2013 References This document All Documents Current draft is in the members-only area  Members_Only_Area members log in using username and password Slide 17 Clint Chaplin, Samsung Electronics Page 17 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics


Download ppt "Liaison Report Date: Authors: November 2013"

Similar presentations


Ads by Google