Presentation is loading. Please wait.

Presentation is loading. Please wait.

Membrane Potentiometer Carrier – Assembly Diagrams

Similar presentations


Presentation on theme: "Membrane Potentiometer Carrier – Assembly Diagrams"— Presentation transcript:

1 Membrane Potentiometer Carrier – Assembly Diagrams
MMSC1000-1 MMSC1000-1 MMSC1000 Step 1 Step 2 1-1/4” 2.0” MMSC1000-2 3/4” Apply a thin layer of rubber cement between the outer edge and the dotted lines. Note: favor the outer edge of MMSC It is important that no cement enters the keep out zone when MMSC and -2 are mated. Only enough cement is required to hold the pieces together during attachment to the carrier garment. Allow cement to air dry per manufacturer’s instructions. = Keep Out Zone 1/8” Max

2 Membrane Potentiometer Carrier – Assembly Diagrams
1/8” Step 3 1/4” Install carrier flap locking snaps as depicted at right. Note: it is important that a clean Center hole is cut prior to snap Installation to avoid tearing of the Rubber membrane carrier material. 1-1/4” MMSC1000 1.0” Keep Out Zone 1/8”

3 Membrane Potentiometer Carrier – Assembly Diagrams
Completed Carrier (membrane shown installed For reference) Connector Removable Flexible Membrane Potentiometer


Download ppt "Membrane Potentiometer Carrier – Assembly Diagrams"

Similar presentations


Ads by Google