Presentation is loading. Please wait.

Presentation is loading. Please wait.

Quality assurance monthly report - December 2017

Similar presentations


Presentation on theme: "Quality assurance monthly report - December 2017"— Presentation transcript:

1 Quality assurance monthly report - December 2017
Safety of service Quality of service Quality improvement & planning Total number of patients seen in all services year to date: (74 in December) No of vein procedures for month: 4 New: Follow up: 16 Total number patients seen: 28 Audits completed: Chaperone audit – 100% patients chaperoned Clinic Manager’s monthly premises audit Storage temperatures for pharmaceuticals kept within recommended ranges at all times Meetings held: Informal daily staff meetings Staff meeting 19th December 2017 Training: Compression stocking training with Credenhill Metabolic Clinic/Pre-Diabetes training with Catherine Cassells Infection Prevention and Control training Safety alerts/ clinical guidance/Regulations changes: No of MHRA alerts received: 11 No of relevant alerts requiring action: 0 Improvements and reviews of practice Infection Prevention and Control reviewed by team Review of aesthetic practice with Dr Ian Strawford No of post procedure DVTs or infections December Total = To date No of medication errors December Total = Collapse/Faint/Allergic event post procedure To date No of complaints received: 0 “I was extremely nervous when I attended the clinic having previously had the procedure done at a local NHS hospital but I can honestly say that this time, it was a completely different experience. The cleanliness and hygiene standards at the clinic and the professionalism and caring attitude of all members of staff was excellent. The procedure itself was unhurried and I was made to feel as comfortable as possible. Each part of the procedure was explained to me as it was being carried out which was very reassuring. The follow-up care afterwards was second to none. I was contacted by several members of staff and even Mr Gajraj called me to see how I was and told me to contact him if I had any concerns. Overall I cannot fault the service or staff at The Melbury Clinic and would highly recommend it to anyone considering vein surgery.” patient comment Dr Gajraj Iwantgreatcare.com (5 * for recommend, trust, listening). Total 196 (5 * reviews) 2 Health and safety related accident/incidents December Total = To date (RF fibre malfunction at Southampton) 4 Melbury Clinic Iwantgreatcare.com (5 * for recommend, trust, listening). Total 113 (5 * reviews) Notifiable safety incidents Moderate harm 0 Prolonged psychological harm 0 Death or severe harm 0 Best practice adherence Treatment delivered in order (QS67) : 100% Protocol followed to prevent collapse/faint episodes – 0 required. Number of duplex scan to both legs (QS67) 100%


Download ppt "Quality assurance monthly report - December 2017"

Similar presentations


Ads by Google