Presentation is loading. Please wait.

Presentation is loading. Please wait.

Regional NETWORK OPERATIONAL ANALYSIS

Similar presentations


Presentation on theme: "Regional NETWORK OPERATIONAL ANALYSIS"— Presentation transcript:

1 Regional NETWORK OPERATIONAL ANALYSIS
Hampton Roads VA Christopher Hall December 13, 2018

2 Regional HOT Network Study
Key Facts: Existing HOT Projects in Study Area - Approved 64 Express Lanes (reversible – in operation) High Rise Bridge (under construction) HRBT (in procurement) HRTPO Endorsement of I-64 Regional HOT Network Study Limits (39.5 miles) I-64 near Hampton Coliseum to Bowers Hill Interchange (I-664/I-264) Operational Analysis – 2025 Horizon Year

3 Regional HOT Network Analysis
Scenario 1 – I-64 as Planned/Approved Segment 1 – HOT reversible (64 Express Lanes) Segment 2A – HOT bi-directional (I-64 Southside/High Rise Bridge) Segment 2B – HOV bi-directional (Chesapeake Express Lanes) Segment 3 – HOT bi-directional (HRBT)

4 Regional HOT Network Analysis
Scenario 2 – Regional HOT Network Segment 1 – HOT reversible (64 Express Lanes) Segment 2A – HOT bi-directional (I-64 Southside/High Rise Bridge) Segment 2B – HOT bi-directional (Chesapeake Express Lanes) Segment 3 – HOT bi-directional (HRBT)

5 Regional HOT Network Analysis
Key Objectives Analysis of Operational interface between segments Identify operational challenges between segmented projects and as HOT Network Clarify access and transition points Evaluation of HOT Lane and General Purpose Lane performance


Download ppt "Regional NETWORK OPERATIONAL ANALYSIS"

Similar presentations


Ads by Google