Presentation is loading. Please wait.

Presentation is loading. Please wait.

QoSMAN SG Closing Report – Sept 2009

Similar presentations


Presentation on theme: "QoSMAN SG Closing Report – Sept 2009"— Presentation transcript:

1 QoSMAN SG Closing Report – Sept 2009
Month Year doc.: IEEE yy/xxxxr0 September 2009 QoSMAN SG Closing Report – Sept 2009 Date: Authors: Michael Montemurro, Research In Motion Osama Aboul-Magd (Samsung)

2 Month Year doc.: IEEE yy/xxxxr0 September 2009 Abstract This document is the closing report for the QoSMAN SG for the September 2009 session. Michael Montemurro, Research In Motion Osama Aboul-Magd (Samsung)

3 Work Completed Elected David Hunter as SG Secretary
Month Year doc.: IEEE yy/xxxxr0 September 2009 Work Completed Elected David Hunter as SG Secretary Elected Michael Montemurro as SG Chair Presentations: Completed and accepted the PAR and 5C document Bring a motion to the WG. Michael Montemurro, Research In Motion Osama Aboul-Magd (Samsung)

4 Month Year doc.: IEEE yy/xxxxr0 September 2009 November 2009 Goals Address any comments on the PAR and 5C document and forward to the EC meeting. Discuss a process the Task Group would follow for creating the QoSMAN amendment Discuss solution requirements for the QoSMAN amendment. Michael Montemurro, Research In Motion Osama Aboul-Magd (Samsung)

5 April 2009 doc.: IEEE /xxxxr0 September 2009 SG Motion Believing that the PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines, Request that the PAR and the Five Criteria contained in document qm-qosman-par-nescom-form-plus-5cs.doc be forwarded to the WG for approval of the full Working Group. Moved: Henry Ptasinski Seconded: Paul Lambert Vote: Yes – 9, No – 0, Abstain – 1. Michael Montemurro, Research In Motion Rich Kennedy, Research In Motion

6 April 2009 doc.: IEEE /xxxxr0 September 2009 WG Motion Believing that the PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines, Request that the PAR and the Five Criteria contained in qm-qosman-par-nescom-form-plus-5cs.doc be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval to submit to NesCom. Moved by Michael Montemurro on behalf of the IEEE QOSMAN SG QOSMAN SG vote: Moved: Henry Ptasinski, Seconded: Paul Lambert, Result: 9-0-1 Michael Montemurro, Research In Motion Rich Kennedy, Research In Motion


Download ppt "QoSMAN SG Closing Report – Sept 2009"

Similar presentations


Ads by Google