Presentation is loading. Please wait.

Presentation is loading. Please wait.

May 2006 Jacksonville Meeting Slides

Similar presentations


Presentation on theme: "May 2006 Jacksonville Meeting Slides"— Presentation transcript:

1 May 2006 Jacksonville Meeting Slides
Doc.: IEEE /0669r1 May 2005 May 2006 May 2006 Jacksonville Meeting Slides Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

2 Welcome to TGT Evaluation of 802.11 Wireless Performance
Doc.: IEEE /0669r1 May 2005 May 2006 Welcome to TGT Evaluation of Wireless Performance Charles R. Wright Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

3 May 2006 Meeting Objectives Approve any technical changes to the draft arising from previous teleconferences Current draft is D0.7 TGT “State of the Draft” discussion What is essential to completing the draft? Continuing with technical presentations and proposals Plan to start TGT internal review of the draft after incorporation of new proposals Review of timeline and procedure for getting to Letter Ballot Charles R. Wright, Azimuth Systems, Inc.

4 May 2006 Progress Since Denver Editor incorporated approved proposals into the draft to create D0.7 Four telecons held Spent almost all time discussing items on the TGT Issues List Thanks to S. Tolpin for addressing 37 comments related to text he was involved in Charles R. Wright, Azimuth Systems, Inc.

5 Proposed Agenda for Jacksonville Meetings
Doc.: IEEE /0669r1 May 2005 May 2006 Proposed Agenda for Jacksonville Meetings Chair comments Appoint secretary Approval of agenda Approve minutes 11-06/0r0 – Denver 11-06/0614r0 – May 4 telecon Call for presentations 11-06/651r1, “Video Delivery vs. Attenuation in a Conducted Environment”, (11-06/652r1) R. Fernald (90 min) 11-06/610r0, “Proposal for resolution of comments for P D0.7”, S. Tolpin (30 min) 11-06/621r0, “Current Consumption vs Time”, C. Warren (40 min) 11-06/0160r0 “Multipath Fading in OTA Tests and Test Design”, P. Visuri (60 min) 11-06/741r0, “Wi-Fi Bluetooth Coexistence”, U.Lemberger (60 min) 11-06/742r0, “MIMO test methodology”, U.Lemberger (60 min) 11-06/783r0r0, “Update to Calibrated OTA Test Environment”, (11-06/760r0) M. Foegelle (30 min) State of the Draft discussion 11-06/726r0 “Draft Status”, T. Alexander (30 min) To-Do list (this presentation), C. Wright (10 min) 11-06/705r0 “Another Point of View for TGT”, R. Kennedy (15 min) Presentations in Item 5 as they are ready Process discussions Review of published T timeline (see Planning for Internal Review New Business  Continued discussion on 11-06/651r1  Motion on 11-06/376r1 (C. Warren) Future telecons Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

6 Meeting Schedule for this Week
May 2006 Meeting Schedule for this Week Monday Tuesday Wednesday Thursday 8:00 TGT Opening 9:30 11:00 12:30 Lunch 1:30 TGT TGT 3:30 4:00 TGT TGT Closing Business 6:00 Dinner 7:30 Tutorials Tutorials 9:30 Charles R. Wright, Azimuth Systems, Inc.

7 Review of plans for moving forward
May 2006 Review of plans for moving forward Use telecons to start resolving comments already submitted Agenda time for a “TGT State of the Draft” discussion at May session Will have up-front discussion of what metrics, etc. we believe to be required for completing the draft Begin a “TG Internal Review” soon after May meeting Any new proposals must be integrated first Majority of agenda time in July meeting for resolving comments resulting from the Internal Review Agreed to slip process milestones by two meetings 1st LB now projected for November meeting Charles R. Wright, Azimuth Systems, Inc.

8 TGT Standards Process Milestones
May 2006 TGT Standards Process Milestones Dates are updated from our discussion on Thursday We are here 2005 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1st LB 1st Recirc 2006 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2nd Recirc 1st SB 2007 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec SB Recirc WG/SEC approval REVCOM approval 2008 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Charles R. Wright, Azimuth Systems, Inc.

9 List of expected proposals for achieving “Mostly Complete” (1/2)
Doc.: IEEE /0669r1 May 2005 From 11-05/912r3 September 2005 List of expected proposals for achieving “Mostly Complete” (1/2) Things originally on the list that are done Roaming metric, C. Wright ACI update, M. Kobayashi Link layer metrics redux, Tom Alexander Equivalent cabled test for power, sensitivity: M. Foegelle Voice test suite, pkt loss, delay, jitter and context for using these (e.g., ITU e-model): F. Mlinarsky OTA ACI methodology (Neeraj Sharma) C. Wright, Azimuth Systems Charles R. Wright, Azimuth Systems, Inc.

10 List of expected proposals for achieving “Mostly Complete” (2/2)
Doc.: IEEE /0669r1 May 2005 From 11-05/912r3 May 2006 List of expected proposals for achieving “Mostly Complete” (2/2) List from previous meetings: things that we need in our draft that people are volunteering to work on: Generic discussion of “Permissible Error Margins and Reliability of Test” RF metrology methodology (M. Foegelle), (delivered in March) Contributions to framework section (clause 4) Correlation between secondary metrics and primary metrics for the secondary metrics in the draft Theoretical throughput limits, Larry Green (check progress) Total Radiated Power, Total Isotropic Sensitivity: M. Foegelle (in progress) Video performance metrics, Royce Fernald (in progress) Multipath Fading in OTA Tests and Test Design, Pertti Visuri (in progress) 802.11n testing (awaiting experts to provide material) General test practices (in progress) (D. Ward) Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

11 May 2006 Motion # 1 Instruct the editor to incorporate the changes listed in document 11-06/0610r0 into the P draft, with the following changes: All couplers depicted in all the figures within 11-06/0610r0 should be reversed (mirrored about left/right) Moved/Second: S. Tolpin/T. Alexander Motion passes 9/0/2 (technical) Charles R. Wright, Azimuth Systems, Inc.

12 May 2006 Motion #2 Move to instruct the editor to incorporate the contents of document /0652r1 into the P draft Technical (75%) Moved/second: P.Mehta/L.Green Yes/No/Abs: 9/4/5 Motion fails Charles R. Wright, Azimuth Systems, Inc.

13 Motion #3 May 2006 Instruct the editor to:
Doc.: IEEE /0669r1 May 2005 May 2006 Motion #3 Instruct the editor to: Replace all instances of Oscilloscope in pictures and text text with Current / Voltage Measurement Device. Replace references to “ Control of Digital Oscilloscope” with “Control of voltage and current measurement device”. Replace in “PS Battery” with “supply voltage” Replace any reference to current probe /probes utilization with “Current measurement method”. Replace “The oscilloscope probes should be calibrated such that voltage measurement accuracy is less than 10 mV and the current measurement accuracy is less than 0.5 mA.” in with “The I/V measurement device should be calibrated such that voltage measurement accuracy is less than 1% of measured voltage and the current measurement accuracy is less than 5% of measured current” Add the following baseline parameters in table 20: Beacon Interval 100TU, DTIM=3. Add the following Modifiers to : Beacon Interval in multiples of 100TU. Other fixed data rate as specified by the test Use of shorter period than 100S for “Zoom view” – the measurement device sample rate should be faster than 1mS. The continuous sampled data shall be reported. Move/Second: C.Warren/D.Victor Y/N/A: 14/0/2 (technical 75%) Motion Passes Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

14 May 2006 Straw polls Does the TGT in favor of having 11n devices testing in TGT draft? Y/N: 18/1 Does the TGT in favor of having this concept of measurement and metric for MIMO tests in TGT draft? Y/N: 7/2 Charles R. Wright, Azimuth Systems, Inc.

15 May 2006 Straw Poll Should the Multipath fading in OTA tests be addressed in the TGT draft in the general way discussed in the proposed addendum? Charles R. Wright, Azimuth Systems, Inc.

16 May 2006 New Business Possible telecons if we follow our current “every two weeks” schedule: 1 June 15 June 29 June July 13 (not to be held) Discussion of work to be done on teleconferences Continue with issues list Will announce TG internal review of D0.8 in WG Plenary and on reflector to begin NLT June 1 and ending July 10th Charles R. Wright, Azimuth Systems, Inc.

17 Telecons between March and May 802.11 meetings
Motion to empower TGT to hold telecons Time: 12 noon Eastern (US) time Duration: 1 hour Dates: 1 June 15 June 29 June Moved/second: L.Green/M.Kobayashi Unanimous consent Charles R. Wright, Azimuth Systems, Inc.

18 May 2006 Backup Information Charles R. Wright, Azimuth Systems, Inc.

19 TGT Approved Document List
May 2006 TGT Approved Document List 11-04/1553r2, “Guidelines for TGT Formal Metric and Methodology Proposals” 11-05/912r3, “TGT Process Document” Charles R. Wright, Azimuth Systems, Inc.

20 Teleconference Info Date: Thursdays
May 2006 Teleconference Info Date: Thursdays Time: 12 Noon Eastern time (no matter what the daylight savings time status) Duration: 1 hour Phone #  International: Passcode: Next: TBD Charles R. Wright, Azimuth Systems, Inc.

21 May 2006 Reflector reflectors: Requires membership to send to it Getting on the reflectors Instructions are contained in every reflector posting for customizing your reflector experience (including unsubscribing) rules require all TG communication to be through reflector Charles R. Wright, Azimuth Systems, Inc.

22 References for 802.11 Newcomers (1 of 2)
May 2006 References for Newcomers (1 of 2) Web site: Document server: Sign up for an account No need to be an member to get an account Once logged in, “join” : Click on “ WLAN WG” on left In center window, choose to become a new member Click again on “ WLAN WG” An additional subitem called “Documents” will be revealed – click on it You’ve reached the document server! Charles R. Wright, Azimuth Systems, Inc.

23 References for 802.11 Newcomers (2 of 2)
May 2006 References for Newcomers (2 of 2) Document numbering scheme WG-YY-NNNN-RR-gggg-English-document-title.ext WG = 802 working group number, e.g. “11” as in YY = two digits of year NNNN = document number RR = document revision number gggg = group to which the document pertains Example: t-jan-2006-waikoloa-meeting-slides.ppt Charles R. Wright, Azimuth Systems, Inc.


Download ppt "May 2006 Jacksonville Meeting Slides"

Similar presentations


Ads by Google