Presentation is loading. Please wait.

Presentation is loading. Please wait.

Heat Pump Water Heater Market Development Project

Similar presentations


Presentation on theme: "Heat Pump Water Heater Market Development Project"— Presentation transcript:

1 Heat Pump Water Heater Market Development Project 2018-2020
Jennifer West HPWH Summit October 22, 2018 Introduce myself and StopWaste.

2 BAAQMD funding October September 2020 Climate Protection Grant to Bay Area Regional Energy Network (BayREN) $400,000, StopWaste as lead agency Silicon Valley Clean Energy San Jose Clean Energy Marin County Energy Solutions City of Palo Alto Sonoma Clean Power

3 Efficient Technology Life Cycle cost savings Barriers
Market Development Cost varies, but right now HPWH cost more than a typical gas water heater. Around $1,500. Installation costs are wildly variable, from $2,000 to $6,000. Want to change that with better and more accessible contractor training and Trade Pro Connect platform.

4 Market Development Supply Chain Engagement
5 strategies Supply Chain Engagement Midstream Incentive Program Design Stakeholder Trainings and Cross-Promotion Homeowner Education Multifamily Heat Pump Equipment Installations Cross promotion includes solar PV installers, EV and EV charging sales, Financing teams such as PACE and other lenders, SunShares, Passive House. Will coordinate with other grantees so we don’t duplicate efforts on residential outreach and homeowner education. BAMBE Bay Area Multifamily Building Enhancement program of BayREN is the perfect vehicle to find eligible low-income multifamily housing ready for heat pump installations. StopWaste leads on BAMBE energy upgrade program.

5 Midstream Incentive Program

6 BayREN HPWH Proposal

7 Jennifer West, StopWaste jwest@stopwaste.org (510) 891-6555

8 “You’ll need an upgrade in your electric panel/conduit.”
Barriers “I want to install a HPWH.” “It’s not on the truck.” “You’ll need an upgrade in your electric panel/conduit.” “That’ll cost you $$$$.” or “I’ve not done those before.” “You’ll be without hot water for two weeks.”


Download ppt "Heat Pump Water Heater Market Development Project"

Similar presentations


Ads by Google