Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]

Similar presentations


Presentation on theme: "Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]"— Presentation transcript:

1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[ ], FAX: [ ], Re: [] Abstract: [Liaison report to inform WG of actions taken by n.] Purpose: [Information Exchange] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by July 2004 doc.: IEEE /0395r0 Dr. John R. Barr, Motorola John Barr, Motorola

2 Summary Looking a lot more like 802.15.3a
July 2004 doc.: IEEE /0395r0 Summary Looking a lot more like a Most of the work done in Garden Grove was in outside merger group discussions to craft a “joint proposal”. Meanwhile, a group of four companies is attempting to create an alternative specification to counter advances by smaller companies within the IEEE 802 process. Meanwhile, good progress within the merger group on a joint proposal. Joint proposal will be completed by November 7th for final confirmation vote during the November plenary. Dr. John R. Barr, Motorola John Barr, Motorola

3 Recap of Architecture Encoder Puncturer Parser Interleaver QAM Mapper
Antenna Mapper iFFT Window & GI RF Pilot Preamble Agreed upon Under discussion Yet to be discussed Dr. John R. Barr, Motorola

4 MAC Feature Architecture
July 2004 doc.: IEEE /0395r0 MAC Feature Architecture Dr. John R. Barr, Motorola John Barr, Motorola

5 Joint Proposal Timeline - Revised
San Fran F2F Anaheim F2F Vancouver Final Joint Prop Confirm Vote F2F Hawaii Draft proposal owned by TGn JAP F2F EUR F2F Weekly Conference Calls between F2F Meetings JUL AUG SEP OCT NOV DEC JAN 2005 2006 Dr. John R. Barr, Motorola

6 Consensus Process JP team is in a Continuous Process of finding consensus As consensus is identified, motions are crafted for formal consideration. Motions are put to a binding ballot on a web based tool 1 vote per company in the JP pool (42 voting entities) 72 hour window 75% approval required for technical motions to pass JP to send status update after the Oct F2F (~25Oct05) Dr. John R. Barr, Motorola

7 Convergence on draft text accelerating
Recap Activities Since web tools in place since Aug 42 voting companies 292 people 126 documents reviewed 10 formal ballots (6 since 21Sept05) Over 50 straw polls Convergence on draft text accelerating Dr. John R. Barr, Motorola

8 July 2004 doc.: IEEE /0395r0 Primary Documents r2 Wireless VoIP Eldad Perahia, Brett Douglas r1 JP Status Report (Monday) r0 JP Status Report (Thursday) r3 TGn Opening Report r0 TGn September Minutes r0 TGn Closing Report Dr. John R. Barr, Motorola John Barr, Motorola

9 November 14-18, 2005 Vancouver Agenda Plan
Between now and November No teleconference calls for SS or CA will be needed No teleconferences or interim meetings of TGn will be needed Merged proposal draft posted to server & announced on reflector by Monday, Nov 07 (1 week prior to meeting) Questions submitted via by Thursday Nov 10 Technical Proposal and Responses will be presented beginning Monday Nov 14 November Meeting Plan (Monday = November 14) Merged proposal Presentation & Discussion , Q&A 1st Confirmation vote, “no” vote explanations & remedies if <75% “yes” Technical Editor Election Coexistence Assurance status update Review Timeline Dr. John R. Barr, Motorola