Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proposed work programme for 2015 (point 4.1 of the agenda)

Similar presentations


Presentation on theme: "Proposed work programme for 2015 (point 4.1 of the agenda)"— Presentation transcript:

1 Proposed work programme for 2015 (point 4.1 of the agenda)
Eurostat – Unit E2 Arturo de la Fuente Joint meeting Working Groups on Environmental Accounts & Environmental Expenditure Statistics Luxembourg, 10 March 2015

2 Eurostat priorities for 2015
Consolidate data production and improve quality of the 3 'old' modules Set up data production of the 3 'new' modules. Support countries preparation for the first mandatory transmission in 2017 Invest in statistical infrastructure elements Develop methodology and/or pilot data collections for other additional areas: env. transfers, ReMEA, forest accounts, water accounts Actively contribute to further work on climate change related statistics Support countries to do IO modelling with physical environmental accounts Legal package implementing aspects of Reg. 691/2011

3 Eurostat data collections 2015

4 Thanks!


Download ppt "Proposed work programme for 2015 (point 4.1 of the agenda)"

Similar presentations


Ads by Google