Presentation is loading. Please wait.

Presentation is loading. Please wait.

ADD NAME/TITLE HERE Rural Household Infrastructure Programme Presentation to: Human Settlements Portfolio Committee by Chief Director: Ms Tamie Mpotulo.

Similar presentations


Presentation on theme: "ADD NAME/TITLE HERE Rural Household Infrastructure Programme Presentation to: Human Settlements Portfolio Committee by Chief Director: Ms Tamie Mpotulo."— Presentation transcript:

1 ADD NAME/TITLE HERE Rural Household Infrastructure Programme Presentation to: Human Settlements Portfolio Committee by Chief Director: Ms Tamie Mpotulo : 1 June 2011 1/16/2019 1

2 Intervention measures Conclusion
Contents Introduction Expenditure report Delivery Information Challenges Intervention measures Conclusion 1/16/2019

3 Introduction The total planned delivery for 2010/11was 11 920 units
Delivery as of end March 2011 was 5504 units (46%) Delivery figure at the end of May 2011 is 8368 (70%) units The Rural Household Infrastructure Programme was introduced last year 2010 Allocation for 2010/11 was R100 million Two Professional Service Providers were appointed to support the Department to implement the programme namely The Mvula Trust and IDT 1/16/2019

4 Total allocation to IDT: R46m and Mvula Trust: R36 million
Introduction (cont.) The service providers were appointed in October for 25 municipalities, 15 IDT & 10 Mvula Trust Total allocation to IDT: R46m and Mvula Trust: R36 million Management costs: R12 million 1/16/2019

5 Introduction Cont As at end of March 2011, IDT spent R19.6m of their R46 million The Mvula Trust spent R27.5 m of their R36 million Applied for roll-overs of R26.4 million for IDT & R8.5 million for Mvula Trust The expenditure was for the following items: 1/16/2019

6 Expenditure -IDT Community Development R96,491 Contractors R107,874
Construction of Toilets R902,302 Households registration R69,679 Management fees R1,499,664 Material R12,123,209 Pit excavation R549,602 Pit lining/fixing & top structure R1,444,228 Planning R215,766 Quality inspection R79,245 1/16/2019

7 Expenditure cont Slab cast R63,504 Social facilitation R102,875
Sub total exc. VAT R17,259,443 R2,416,322 TOTAL R19,672,766 1/16/2019

8 Delivery Information (IDT)
Total no of toilets completed: 2189 Number of jobs created Number of households served with Health &Hygiene is 3197 Types of skills transferred: Bricklaying, reinforced concrete manufacture, quality assessors and health and hygiene trainers 1/16/2019

9 Initial Challenges Slow pace of delivery due to, among others, slow pace of decision making at local level Complaints by some municipalities e.g. Umkhanyakude and Lephalale about implementation model Difficult ground conditions e.g. hard rock 1/16/2019

10 Initial Challenges cont
Slow delivery of material by suppliers Excessive rain fall 1/16/2019

11 Interventions taken to address challenges
Weekly meetings with IDT in March to identify bottlenecks & accelerate delivery A joint monitoring team established to verify progress on the ground Joint projects visits by senior management The Department went an extra mile to introduce the programme to municipalities 1/16/2019

12 Mvula Trust Performance
Baseline study R Completed structures R Construction of VIPs R 1, Household register compilation R Project management fees R Implementation R Management Fees R Material on site R11, Planning R 1/16/2019

13 Mvula Trust Cont Pit lining R1,350 431 Project introductions R102 115
Reports to community R Selections of builders R64 674 ISD Training R TOTAL R 1/16/2019

14 Conclusion The Department has instituted intervention measures which have improved performance Areas of concern are receiving attention The Portfolio Committee to take note of the programme performance expenditure report 1/16/2019