Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ch. 2 The Production Team Who Does What When?

Similar presentations


Presentation on theme: "Ch. 2 The Production Team Who Does What When?"— Presentation transcript:

1 Ch. 2 The Production Team Who Does What When?
Kevin Bechet Ch. 2 The Production Team Who Does What When?

2 Review for this Chapter
Key Terms Production Team Production Schedule Responsibility

3 Key Terms Above the Line (Category for non-technical personal such as talent, producers,directors, writers and accountants. ) Below the Line (Category for technical personal such as camera operators, floor persons, graphic operators, editors and audio engineers. ) EFP Team (Electronic Field Production):Usually a 3 person team, consisting of talent, camcorder operator, utility person responsible for lighting and audio/video recording. Sometimes a person responsible for the truck.

4 Key Terms Pre-production team- Compromised by a team of people who plan the production. Producer Writer Director Technical Director Art Director Accountant

5 Key Terms Production Team- Compromised by a team of people who execute the production. Producer Production Assistants Production Team Members Camera Operator Audio Engineer Graphics Operator Floor Director Teleprompter Operator  

6 Key Terms Post Production team- Compromised by a team of people who produce the final product for air. Producer Editor Animator Sound Designer

7 Production Schedule- Time Line
Production Schedule- A calendar that shows the preproduction, production and postproduction dates. Also, explains individual roles for the given production. Timeline- A schedule that shows the time allotments for various activities during a single production. Often prepared by the director.

8 Production Schedule

9 JORDAN’S FURNITURE SHOOT
Timeline JORDAN’S FURNITURE SHOOT 9 AM: ARRIVE TO STUDIO PICK UP EQUIPMENT 10 AM: DRIVE TO LOCATION 11:30AM: SET UP PRODUCTION SHOOT 12:30 PM: EXECUTE A DRY RUN WITH TALENT 1:00 PM: BREAK FOR LUNCH 2:00 PM: ARRIVE BACK TO SET 2:30 PM: PREPARE FINAL PREPERATIONS 3:0O PM: EXECUTE PRODUCTION 4:00 PM: PRODUCTION MEETING 4:30 PM: BREAKDOWN 5:00 PM: DROP SUPPLIES BACK AT STUDIO

10 RESPONSIBILITY PRODUCTION QUALITY
WHO IS RESPONSIBLE FOR OVERSEEING THE ENTIRE PRODUCTION? WHAT IS YOUR ROLE WHEN YOU’RE NOT PARTICIPATING IN THE PRODUCTION? HOW CAN I HURT OR IMPROVE MY PRODUCTION GRADE?

11

12


Download ppt "Ch. 2 The Production Team Who Does What When?"

Similar presentations


Ads by Google