Presentation is loading. Please wait.

Presentation is loading. Please wait.

Government of Montenegro Ministry of Transport and Maritime Affairs

Similar presentations


Presentation on theme: "Government of Montenegro Ministry of Transport and Maritime Affairs"— Presentation transcript:

1 Government of Montenegro Ministry of Transport and Maritime Affairs
Podgorica, April 2013

2 I RAIL INFRUSTRUCTURE Rehabilitation of railway line Bar – Vrbnica, according to the study Italferr: Technical and Financial Study for the rehabilitation of the Belgrade – Bar railway line Railway Link Čapljina – Trebinje - Nikšić Railway Link Pljevlje - Bijelo Polje – Berane-border with Kosovo Restructing of railway system of Montenegro - Privatization

3 Ralway line Bar - Vrbnica
The Belgrade-Bar railway line (Е-79) was constructed and put into operation in phases, from 1958 to The Belgrade-Bar railway line has significant international and regional importance, especially for development of business affairs with Italy and South East Europe. The line (Route 4) represents direct connection between ports located on the South Adriatic coast, Port of Bar and City of Belgrade – Pan European Corridors X and VII (Danube River) - connecting to TEN-T, as well as connection with all countries of Central and East Europe, considering the strategic position of the Serbian capital city.

4 Current Situation The electrified single line Bar –Vrbnica has a length of km and was opened to traffic in The line is designed to support speeds ranging from 75 km/h to 120 km/h. Railway border crossing station: Bijelo Polje and Prijepolje . Technical and Financial Study for the rehabilitation of the Belgrade – Bar railway line is completed (Italferr, November 2010)

5 51,6 km of tunnels and galleries 15.6 km of bridges and viaducts

6 Project Technical Elements
Object Number Length Tunnel 106 51,6 km Bridge 107 15,6 km Other - landslides 7 1 km Rock falls 28 4,9 km Avalanches 8 0,9 km

7 Project Justification
EIRR 1,6%, Time savings 5 hours, Decreased costs for ordinary and daily maintenance by 30% Removed bottlenecks bridges, tunnels, landslides, rock falls and avalanches, Improved safety and security 35%, Modal shift and intermodality 2 new terminals, Ecology sensitive areas protection - National Park Skadar lake (9,717 km)

8 Project Justification
The financial analysis gives an overview of the financial flows of investment, the operating costs and the revenues over the lifetime of the project and it calculates the rate of return on the investment (IRR) and the net present value (NPV). The financial analysis focuses on the costs and revenues from the perspective of: infrastructure manager, operator of passenger trains and operator of freight trains. The result was positive for both countries. The economic analysis encompasses more than just the considerations of the financial returns of the project, such as user benefits and external costs (air pollution, CO2 emissions and accidents). The economic results of the cost-benefit analysis are presented also in terms of benefit-cost ratio (B/C ratio), and are extremely positive for both countries. Following a final sensitivity analisys, the Study demonstrated that the proposed investment is financial viable and economically beneficial.

9 Financial Analysis Total 138.971.050 Montenegro Year Million €
TYPE OF WORKS MONTENEGRO CIVIL ENGINEERING INFRASTRUCTURE SUBSTRUCTURE AND PERMANENT WAY BRIDGES TUNNELS LANDSLIDES ROCKSLOPES AVALANCHES HYDRO-ENGINEERING WORKS STATION BUILDING AND RELATED FACILITIES 17.396,880 TOTAL 1 ELECTRICAL INFRASTRUCTURE ELECTRIFICATION SIGNALING TELECOMMUNICATIONS 94.540 TOTAL 2 TOTAL ,060 Montenegro Year Million € Short-term scenario to 2015 2011 2012 2013 2014 2015 Total 1 Medium-term to 2020 2016 2017 2018 2019 2020 Total 2 Total

10 What we have What we need
Regular maintenance of infrastructure and traffic regulation € 6, mil per year (Budget) loan from: EBRD - € 25 mil, EIB - € 34 mil IPA 2007, 2009, 2010 and IPA III component - € 18,7 mil What we need Main repair (rehabilitation) of Vrbnica – Bar line, the part - Kolasin – Podgorica line (63,1 km), Main repair (rehabilitation) of Vrbnica – Bar line, the part - Podgorica – Bar line (51,4 km)…

11 Railway Link Čapljina – Trebinje - Nikšić
According to the signed Memorandum of joint actions on development of project-study documentation for the connection of Montenegro and Bosnia and Herzegovina by rail, the Spanish company "Inocsa Ingenieria SL" finished project “Provision of a preliminary decision, and the study of spatial - planning documents for regional Čapljina -Trebinje-Nikšić“ The project was done a preliminary traffic study, preliminary studies on environmental impact assessment, preliminary cost estimates, and preiliminary design solution Line in lenght 249 km in three scenario I scenario – double track railway line – 1 bil 450 mil EUR II scenario – one track railway line plus coridor for second track – 1 bil 90 mil EUR III scenario – one track railway line – 809 mil EUR Next step: Feasibility study

12 Railway Link Čapljina – Trebinje - Nikšić

13 Railway Link Pljevlje - Bijelo Polje – Berane-border with Kosovo
In July year published tender for Feasibility Study for the construction of new railway Pljevlja-Bijelo Polje-Berane-border with Kosovo Total cost expected 250 million € for lenght around 60 km for solution Pljevlja – Ravna Rijeka Benefits Socio-economic development of the territory of Montenegro and Kosovo Increase in capillary network Economic development of the northern part of Montenegro Uniform distribution of traffic flows of the respective territories Division types of traffic flows on road and rail The creation of new ideas and new international and local trade Connecting to TEN-T through route 4 Improving the competitiveness of the domestic transport industry Increase the quality of transport services Stimulation of economic growth through more efficient and cheaper transport Improve the safety and security, in order to preserve human lives, values and preserving state resources Minimizing negative impacts of development of transport and transport infrastructure on the environment and society

14 Railway Link Pljevlje - Bijelo Polje – Berane-border with Kosovo

15 Restructing of railway system of Montenegro
The Tender Commission for privatization of Transport Companies accordance to the Decision of Council for Privatization and Capital Projects and Government Restructuring Strategy of the Railway of Montenegro via public tender of: “Maintenance of railway infrastructure”, which will be separated from “Railway Infrastructure of Montenegro Jsc - Podgorica”, by joint investment into regular and investment maintenance of railway infrastructure, or sale state packages of share with the conclusion of many years of maintenance contracts, and Awarding the concessions for railway stations and lands which are integral part of “Railway Infrastructure of Montenegro Jsc - Podgorica”, Company Egis International has been selected as an Advisor for. Tender are planed to launch in end of Same procedure are for privatization of Montecargo

16


Download ppt "Government of Montenegro Ministry of Transport and Maritime Affairs"

Similar presentations


Ads by Google