Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGba March 2017 Agenda Date: Authors: March 2017

Similar presentations


Presentation on theme: "TGba March 2017 Agenda Date: Authors: March 2017"— Presentation transcript:

1 TGba March 2017 Agenda Date: 2017-03-16 Authors: March 2017
January 2016 doc.: IEEE /1472r0 March 2017 TGba March 2017 Agenda Date: Authors: Minyoung Park (Intel Corp.) Edward Au (Huawei Technologies)

2 IEEE 802.11 TGba: Wake-up Radio Operation
March 2017 IEEE TGba: Wake-up Radio Operation Vancouver, BC, Canada March , 2017 Chair: Minyoung Park (Intel Corporation) Vice Chair pro tem: Yunsong Yang (Huawei), Eunsung Park (LGE) Secretary: Leif Wilhelmsson (Ericsson) Minyoung Park (Intel Corp.)

3 March 2017 Abstract This presentation contains the IEEE TGba Wake-up Radio (WUR) Operation agenda for the March 2017 session Minyoung Park (Intel Corp.)

4 March 2017 Meeting Protocol Please announce your name and affiliation when you first address the group during a meeting slot Minyoung Park (Intel Corp.)

5 Attendance http://newton.meeting.verilan.com Register
March 2017 Attendance Register Indicate attendance Minyoung Park (Intel Corp.)

6 Attendance, Voting & Document Status
March 2017 Attendance, Voting & Document Status Make sure your badges are correct If you plan to make a submission be sure it does not contain company logos or advertising Questions on Voting status, Ballot pool, Access to Reflector, Documentation, member’s area see Jon Rosdahl – Cell Phones Silent or Off Minyoung Park (Intel Corp.)

7 TGba Schedule for the Week
March 2017 TGba Schedule for the Week Monday Tuesday Wednesday Thursday AM1 TGba AM2 PM1 PM2 EVE Minyoung Park (Intel Corp.)

8 Main Agenda Items for the Week
March 2017 Main Agenda Items for the Week TG Vice-Chair election (Tuesday PM1) Review technical presentations Work on TGba task group documents Use case document (editor: RossYu) Functional requirement document (editor: Ming Gan) Evaluation methodology and simulation scenario document (editor: Shahrnaz Azizi) Spec framework document (editor: TBD) Review TG timeline Minyoung Park (Intel Corp.)

9 Call for Submissions March 2017
MAC, ba-wur-negotiation-and-acknowledgement-prodecure-follow-up, Po-Kai Huang, Intel MAC, ba-wur-beacon, Po-Kai Huang, Intel PHY, ba-various-symbol-types-for-wur, Eunsung Park, LGE PHY, ba-effect-of-bandwidth-and-sampling-rate-on-performance, Eunsung Park, LGE MAC, ba-initial-thoughts-on-MAC-procedures, Jason Guo, Huawei PHY, ba- WUR Frame Structure Follow up, Dongguk Im, LGE PHY, A Narrow-Band Bipolar OOK Signal, Simon Qu, BlackBerry MAC, ba-Low-Latency-and-Low-Medium-Utilization, Steve Shellhammer, Qualcomm PHY, ba-Regulations-and-Noise-Figure-Impact-on-SNR , Steve Shellhammer, Qualcomm PHY, ba-WUR-Modulation-and-Coding , Steve Shellhammer, Qualcomm PHY, “TX/RX architecture, operation channels and power consumption of 11ba devices”, Jianhan Liu, MediaTek MAC, “Assign and Update Wake-Up Signals in WLAN with Wake-Up Radio Receivers”, Jianhan Liu, MediaTek PHY, ba-studies-of-PER-performance, Shahrnaz Azizi, Intel PHY, ba-motion-for-high-level-phy-design, Shahrnaz Azizi, Intel PHY, , WUR phase noise model follow-up, Minyoung Park, Intel MAC, ba-WUR-duty-cycle-mode-and-timing-synchronization-follow-up, Tianyu Wu, MediaTek PHY, WUR link budget analysis, Rui Cao, Marvell USE, /0372, "Additional usage models for WUR", Eduard Garcia-Villegas (UPC) PHY, Waveform Generation for Waveform Coding, Junghoon Suh, Huawei PHY, 11-17/0373, Performance Investigations on Single-carrier and Multiple-carrier-based WUR, Jia Jia, Huawei Minyoung Park (Intel Corp.)

10 Call for Submissions March 2017
PHY, ba-False-Radar-Pulse-Detection-on-WUR-Signal, Allert van Zelst, Qualcomm MAC, 379r0: SFD MAC Proposal, Suhwook Kim (LGE) MAC, 380r0: WUR Channel switch, Suhwook Kim (LGE) MAC, 11-17/0381, WUR MAC issues follow-up, Jeongki Kim, LGE PHY, 11-17/0382r0, WUR Reference Signal, Woojin Ahn, WILUS PHY, 11/ “Concurrent transmission of data and a wake-up signal in ax - Follow-up”, Leif Wilhelmsson, Ericsson PHY, 11/ “Impact of reciprocal mixing on WUR performance” , Leif Wilhelmsson, Ericsson MAC, 11-17/387, Purpose Indication for WUR Packets, Xiaofei Wang, InterDigital MAC, 11-17/0402, WUR Wakeup Channel Access, Ronny Yongho Kim, KNUT USE, ba-use-cases-for-wur-in-its.pptx, James Lepp, BlackBerry MAC, ba-Consideration-of-WUR-Security, Kaiying Lv, ZTE Corp MAC, straw polls deferred by teleconference, Liwen Chu MAC, BSS management with WLS Wakeup frame, Liwen Chu, Marvell MAC, Synchronization with Low Power Antenna, Liwen Chu, Marvell MAC, Inter-BSS communication, Liwen Chu, Marvell Minyoung Park (Intel Corp.)

11 March 2017 Use Case Submissions USE, /0372, "Additional usage models for WUR", Eduard Garcia-Villegas (UPC) USE, ba-use-cases-for-wur-in-its.pptx, James Lepp, BlackBerry Minyoung Park (Intel Corp.)

12 March 2017 PHY Submissions PHY, ba-various-symbol-types-for-wur, Eunsung Park, LGE PHY, ba-effect-of-bandwidth-and-sampling-rate-on-performance, Eunsung Park, LGE PHY, ba- WUR Frame Structure Follow up, Dongguk Im, LGE PHY, A Narrow-Band Bipolar OOK Signal, Simon Qu, BlackBerry PHY, ba-Regulations-and-Noise-Figure-Impact-on-SNR , Steve Shellhammer, Qualcomm PHY, ba-WUR-Modulation-and-Coding , Steve Shellhammer, Qualcomm PHY, r0, “TX/RX architecture, operation channels and power consumption of 11ba devices”, Jianhan Liu, MediaTek (straw polls deferred to next time slot – Thursday AM1 presenter not in the room) PHY, ba-False-Radar-Pulse-Detection-on-WUR-Signal, Allert van Zelst, Qualcomm PHY, ba-studies-of-PER-performance, Shahrnaz Azizi, Intel PHY, 11-17/0373, Performance Investigations on Single-carrier and Multiple-carrier-based WUR, Jia Jia, Huawei Minyoung Park (Intel Corp.)

13 PHY Submissions (continued)
March 2017 PHY Submissions (continued) PHY, ba-motion-for-high-level-phy-design, Shahrnaz Azizi, Intel PHY, , WUR phase noise model follow-up, Minyoung Park, Intel PHY, WUR link budget analysis, Rui Cao, Marvell PHY, Waveform Generation for Waveform Coding, Junghoon Suh, Huawei PHY, 11/ “Concurrent transmission of data and a wake-up signal in ax - Follow-up”, Leif Wilhelmsson, Ericsson PHY, 11/ “Impact of reciprocal mixing on WUR performance” , Leif Wilhelmsson, Ericsson Minyoung Park (Intel Corp.)

14 March 2017 MAC Submissions MAC, ba-wur-negotiation-and-acknowledgement-prodecure-follow-up, Po-Kai Huang, Intel MAC, ba-wur-beacon, Po-Kai Huang, Intel MAC, ba-WUR-duty-cycle-mode-and-timing-synchronization-follow-up, Tianyu Wu, MediaTek MAC, ba-initial-thoughts-on-MAC-procedures, Jason Guo, Huawei MAC, ba-Low-Latency-and-Low-Medium-Utilization, Steve Shellhammer, Qualcomm MAC, “Assign and Update Wake-Up Signals in WLAN with Wake-Up Radio Receivers”, Jianhan Liu, MediaTek MAC, 379r0: SFD MAC Proposal, Suhwook Kim (LGE) MAC, 380r0: WUR Channel switch, Suhwook Kim (LGE) MAC, 11-17/0381, WUR MAC issues follow-up, Jeongki Kim, LGE MAC, 11-17/0382r0, WUR Reference Signal, Woojin Ahn, WILUS MAC, 11-17/387, Purpose Indication for WUR Packets, Xiaofei Wang, InterDigital Minyoung Park (Intel Corp.)

15 MAC Submissions (continued)
January 2016 doc.: IEEE /1472r0 March 2017 MAC Submissions (continued) MAC, 11-17/0402, WUR Wakeup Channel Access, Ronny Yongho Kim, KNUT MAC, ba-Consideration-of-WUR-Security, Kaiying Lv, ZTE Corp MAC, straw polls deferred by teleconference, Liwen Chu MAC, BSS management with WLS Wakeup frame, Liwen Chu, Marvell MAC, Synchronization with Low Power Antenna, Liwen Chu, Marvell MAC, Inter-BSS communication, Liwen Chu, Marvell Minyoung Park (Intel Corp.) Edward Au (Huawei Technologies)

16 Monday Ad-hoc Meeting Agenda
March 2017 Monday Ad-hoc Meeting Agenda Monday, March 13th, AM1, 8:00-10:00 Call Ad-hoc meeting to order TGba introduction Call for submissions Set Ad-hoc meeting agenda IEEE 802 and IPR Policy and procedure Participation in IEEE 802 Meetings Presentations PHY presentations 1-5 Adjourn Minyoung Park (Intel Corp.)

17 Agenda March 2017 Thursday, March 16th, AM1, 08:00-10:00
Call meeting to order IEEE 802 and IPR Policy and procedure Presentations Recess Thursday, March 16th, AM2, 10:30 – 12:30 Motions Thursday, March 16th, PM1, 13:30 – 15:30 TG timeline discussion Goal for May 2017 F2F meeting Teleconference call schedule TG documents review Adjourn Tuesday, March 14th, AM1, 8:00-10:00 Call meeting to order TGba introduction Call for submissions Review agenda and approval IEEE 802 and IPR Policy and procedure Participation in IEEE 802 Meetings Summary from January 2017 meeting Motion: January 2017 meeting minutes (doc: IEEE /0185r0) Vice-chair election process Presentations Recess Tuesday, March 14th, PM1, 13:30-15:30 Vice-chair election Wednesday, March 15th, AM1, 08:00-10:00 Minyoung Park (Intel Corp.)

18 Instructions for the WG Chair
March 2017 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual and in FAQs 12 and 12a on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. (Optional to be shown) Minyoung Park (Intel Corp.)

19 Participants, Patents, and Duty to Inform
March 2017 Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search slide_#1 Minyoung Park (Intel Corp.)

20 Patent Related Links Patent Policy is stated in these sources:
March 2017 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at slide_#2 Minyoung Park (Intel Corp.)

21 Call for Potentially Essential Patents
March 2017 Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted slide_#3 Minyoung Park (Intel Corp.)

22 Other Guidelines for IEEE WG Meetings
March 2017 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. slide_#4 Minyoung Park (Intel Corp.)

23 Participation in IEEE 802 Meetings
March 2017 Participation in IEEE 802 Meetings All participation in IEEE 802 Working Group meetings is on an individual basis Participants in the IEEE standards development individual process shall act based on their qualifications and experience. ( section 5.2.1) IEEE 802 Working Group membership is by individual; “Working Group members shall participate in the consensus process in a manner consistent with their professional expert opinion as individuals, and not as organizational representatives”. ( section 4.2.1) You have an obligation to act and vote as an individual and not under the direction of any other individual or group. Your obligation to act and vote as an individual applies in all cases, regardless of any external commitments, agreements, contracts, or orders. You shall not direct the actions or votes of any other member of an IEEE 802 Working Group or retaliate against any other member for their actions or votes within IEEE 802 Working Group meetings, see section and section 3.4.1, list item x By participating in IEEE 802 meetings, you accept these requirements. If you do not agree to these policies then you shall not participate. Minyoung Park (Intel Corp.)

24 IEEE-SA policy documents
March 2017 IEEE-SA policy documents IEEE Code of Ethics IEEE Standards Association (IEEE-SA) Affiliation FAQ Antitrust and Competition Policy Letter of Assurance Form IEEE-SA Patent Committee FAQ & Patent slides and Minyoung Park (Intel Corp.)

25 Current IEEE-SA Rule documents
March 2017 Current IEEE-SA Rule documents The current version of the IEEE-SA Standards Board Bylaws is available at:  (HTML version)  (PDF version)  The current version of the IEEE-SA Standards Board Operations Manual is available at:  (HTML version)  (PDF version)  Minyoung Park (Intel Corp.)

26 Current IEEE 802, 802.11 rules documents
March 2017 Current IEEE 802, rules documents IEEE 802 Policies & Procedures (link to AudCom, approved by IEEE-SA Standards Board June 2014) IEEE 802 Operations Manual (13 Nov 2015) IEEE 802 Working Group Policies &Procedures (13 Nov 2015) (editor update) IEEE 802 LMSC Chair's Guidelines (18 Mar 2016) IEEE WG OM: (13 Nov 2015) Policies and Procedures hierarchy IEEE 802 Procedural document website: Minyoung Park (Intel Corp.)

27 Summary from January 2017 meeting
March 2017 Summary from January 2017 meeting TG approved the TG leadership structure Chair, 2 Vice-chairs, Secretary TG Secretary confirmed by the TG (Y/N/A: 57/0/2) TG Secretary: Leif Wilhelmsson Discussed TG spec development process TG approved to create four TG documents Use case document (1st draft [11-17/0029r4] approved by the TG) Functional requirements document Evaluation methodology and simulation scenario document Spec framework document Reviewed technical presentations Approved the TG timeline Minyoung Park (Intel Corp.)

28 Submissions Reviewed in January 2017 (1)
March 2017 Submissions Reviewed in January 2017 (1) Usage model: 12) 11-17/0065r0, “Usage Model for Power Saving AP” – Tomoko Adachi (Toshiba) 13) 11-17/0038, “WUR Reconnection Use Case” – Yunbo Han (Huawei) 22) 11-17/0034, “WUR use cases and requirements” - Yong CHENG (Huawei) 18) 11-17/0029, “WUR usage model” – Ross (Huawei) PHY: 3) 11-17/0030, “The performance of timing synchronization and OOK pulse bandwidth” – Eunsung Park (LGE) 5) 11-17/0049, “WUR Signaling Field” - John Son (WILUS) 16) 11-17/0084, “ High Level PHY Design” – Shahrnaz Azizi (Intel) Strawpoll #2 pending 17) 11-17/0026, “Phase Noise Model Study” – Shahrnaz Azizi (Intel) 20) 11-17/0093, “Discussion of a Wake-Up Receiver Front-End Model” – Leif Wilhelmsson (Ericsson) 21) 11-17/0094, “Concurrent transmission of data and a wake-up signal in ax” – Leif Wilhelmsson (Ericsson) Straw poll pending 24) 11-17/0027, “Re-Discovery Problems in WUR WLAN” – Jianhan Liu (Mediatek) 23) 11-17/0028, “On Waking-up of Multiple WUR Stations” – Jianhan Liu (Mediatek) 10) 11-17/0066, “WUR packet design,” Kaiying Lv 4) 11-17/0036r0, “Consideration on WUR Frame Structure” – Jinsoo Choi(LGE) Minyoung Park (Intel Corp.)

29 Submissions Reviewed in January 2017 (2)
March 2017 Submissions Reviewed in January 2017 (2) MAC: 2) 11-17/0035, “Traffic filter based wakeup service” – Yongho Seok (NEWRACOM) 6) 11-17/0055, “Considerations on post wake-up sequences” – Woojin Ahn (WILUS) 7) 11-17/0054, “WUR MAC issues,” Jeongki Kim (LGE) 8) 11-17/0031, “Channel issue in WUR,” Suhwook Kim (LGE) 9) 11-17/0042, “Power Efficient WUR AP Discovery Follow Up,” Xiaofei WANG (InterDigital) 11) 11-17/0068, “AP Discovery Discussion,” Kaiying Lv 14) 11-17/0070, “Initial Negotiation for WUR“ – Igor Kim (ETRI) 15) 11-17/0071, “High level MAC concept for WUR” – Po-Kai Huang (Intel) 26) 11-17/0043, “WUR power save mode “ – Tiannyu Wu (Mediatek) 27) 11-17/124, “WUR MAC and Wakeup Frame” – Liwen Chu (Marvell) Minyoung Park (Intel Corp.)

30 Submissions Reviewed in January 2017 (3)
March 2017 Submissions Reviewed in January 2017 (3) Others: 1) 11-17/0184, “Ultra Low Power Strategies for Selective Wake-Up from Receiver Prospect” – Joerg Robert (Friedrich-Alexander-Universität Erlangen-Nürnberg) – prefers Wednesday or Thursday 19) 11-17/0029, “Timeline discussion” – Osama AboulMagd (Huawei) 25) 11-17/0039, “Proposed TGba Functional Requirements” Ming Gan (Huawei) Minyoung Park (Intel Corp.)

31 March 2017 TGba Timeline 2017 January: TGba formation meeting November: TGba Draft 0.1 2018 March: TGba Draft 1.0 September: TGba Draft 2.0 2019: March: MDR (mandatory document review) July: formation of sponsor ballot pool September: Sponsor ballot 2020 July: RevCom 2018 2019 2020 Jan. ‘17 - TGba formation Nov. ‘17 - TGba D0.1 2017 Mar. ‘18 - TGba D1.0 10 mo. 4 mo. Mar. ‘19 - MDR 6 mo. Jul. ‘19 SB pool formation Sep. ‘19 SB Sep. ‘18 - TGba D2.0 Jul. ‘20 RevCom We are here Minyoung Park (Intel Corp.)

32 March 2017 Motion - Minutes Approve TGba minutes of January 2017 meeting [doc: IEEE /0185r0] Move: Second: Result: Minyoung Park (Intel Corp.)

33 TGba Vice-Chair Election Process
March 2017 TGba Vice-Chair Election Process The two Vice-Chair positions (1st VC and 2nd VC) are effectively equivalent Election process: If there are more than 2 candidates: Conduct the 1st VC election with all the candidates and elect the person who gets majority (50%) If there is no majority, eliminate the candidate with the least votes and repeat the ballot Conduct the 2nd VC election with (the candidates minus the elected 1st VC) and elect the person who gets majority If there are just 2 candidates, have one candidate to run for the 1st VC and the other to run for the 2nd VC and do voting for each. Nominees: 1st VC: Yunsong Yang (Huawei): Y/N/A = 62/0/1 2nd VC: Eunsung Park (LG Electronics): Y/N/A = 60/0/1 Minyoung Park (Intel Corp.)

34 March 2017 Presentations Minyoung Park (Intel Corp.)

35 Motions Requested Shahrnaz Azizi – 17/368 Jason Guo – 17/354r1
March 2017 Motions Requested Shahrnaz Azizi – 17/368 Motion: Y/N/A = 40/0/16 Jason Guo – 17/354r1 Motion 1: Y/N/A = 46/0/16 Motion 2: Y/N/A = 22//3/26 Motion 3: Y/N/A = 22/0/35 Motion 4: Y/N/A = 36/0/12 Motion 5: Y/N/A = 39/0/12 Po-Kai Huang – 17/342 Motion 1: Y/N/A = 24/3/18 Motion 2: Y/N/A = 23/2/18 Motion 3: Y/N/A = 34/0/3 Po-Kai Huang - 17/343 Motion 2: Y/N/A = 13/0/22 Jia Jia – 17/373 Motion: Y/N/A = 25/0/12 Liwen Chu – 17/124 Motion 1: Y/N/A = 22/7/19 Motion 3: Y/N/A = 19/1/18 Jianhan Liu – 17/27 Motion: Y/N/A = 15/4/5 Tianyu Wu – 17/371 Motion: 22/0/4 James Lepp – 17/406 Motion: 13/0/9 Jeongki Kim – 17/54 Motion 1: 11/5/11 Motion 2: 22/1/6 Eduard – 17/372 Motion: Y/N/A = 14/4/5 Minyoung Park (Intel Corp.)

36 TG Timeline Discussion
March 2017 TG Timeline Discussion Minyoung Park (Intel Corp.)

37 Goal for May 2017 Review technical presentations
March 2017 Goal for May 2017 Review technical presentations Reach consensus on high-level PHY and MAC designs Work on TGba task group documents Use case document (editor: RossYu) Functional requirement document (editor:Ming Gan) Evaluation methodology and simulation scenario document (editor: Shahrnaz Azizi) Spec framework document (editor: TBD) Review TG timeline Minyoung Park (Intel Corp.)

38 Teleconference Call Schedule
January 2016 doc.: IEEE /1472r0 March 2017 Teleconference Call Schedule Rotating the three time zones Proposed schedule (2 hours) April 03 (Monday), 10:00 ET April 17 (Monday), 17:00 ET May 01 (Monday), 23:00 ET Minyoung Park (Intel Corp.) Edward Au (Huawei Technologies)

39 TGba Documents Reviewed
March 2017 TGba Documents Reviewed Functional Requirements Document Simulation Scenarios Document and Evaluation Methodology Minyoung Park (Intel Corp.)

40 March 2017 Presentations Minyoung Park (Intel Corp.)

41 March 2017 Backup Slides Minyoung Park (Intel Corp.)

42 January 2016 doc.: IEEE /1472r0 January 2017 TG Leadership Discussion Operation Manual [11-14/629r14] –Chair, Vice-Chair, Secretary Task Group Chair The TG Chair shall be appointed by the WG Chair and confirmed by a WG majority approval. The TG Chair is re-affirmed every 2 years: one session after the WG Chair is elected. The TG Chair is required to confirm that the function of secretary is performed for each TG meeting. TG meetings are not allowed to function without a secretary. Task Group Vice-Chair TG Vice-Chair is elected by a TG majority approval and confirmed by a WG majority approval. The TG Vice-Chair is reaffirmed every 2 years; one session after the WG Chair is elected. Task Group Secretary The TG Secretary shall be appointed by the TG Chair and confirmed by a TG motion that is approved with a minimum 50% majority. The TG Secretary is re-affirmed every 2 years; one session after the WG Chair is elected. The minutes of meetings taken by the TG Secretary (or designee) are to be provided to the TG Chair in time to be available to the WG Chair for publication 30- days after close of the session. The minutes of the meeting are to include documents produced by the voting process and document list. See section 10 of this document ( Guidelines for Secretaries) for details on content and form of minutes. Minyoung Park (Intel Corp.) Edward Au (Huawei Technologies)

43 Proposed TGba Spec Development Process
March 2017 Proposed TGba Spec Development Process Technical proposal Technical proposal Technical proposal Technical proposal Consensus? No Yes (TG approval) Spec Framework Document (SFD) SFD has enough details for TGba Spec D0.1? TGba Spec Draft 0.1 Comment collection/ Resolution TGba Spec Draft 1.0 Yes No Minyoung Park (Intel Corp.)


Download ppt "TGba March 2017 Agenda Date: Authors: March 2017"

Similar presentations


Ads by Google