Presentation is loading. Please wait.

Presentation is loading. Please wait.

doc.: IEEE <doc#>

Similar presentations


Presentation on theme: "doc.: IEEE <doc#>"— Presentation transcript:

1 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG HRRC Closing Report for March 2016] Date Submitted: [15 March, 2016] Source: [Junhyeong Kim] Company [ETRI] Address [218 Gajeong-ro, Yuseong-gu, Daejeon, 34129, KOREA] Voice:[ ], FAX: [ ], Abstract: [IG HRRC closing report for March 2016] Purpose: [IG HRRC closing report for March 2016] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Junhyeong Kim, ETRI <author>, <company>

2 Macau, China Wednesday AM2, March 16, 2016
IEEE IG HRRC (High Rate Rail Communications Interest Group) Closing Report Macau, China Wednesday AM2, March 16, 2016 Junhyeong Kim, ETRI

3 IG Group Leadership Chair : Junhyeong Kim (ETRI, South Korea)
March 2016 IG Group Leadership Chair : Junhyeong Kim (ETRI, South Korea) Secretary : Danping He (Beijing Jiaotong University, China) Junhyeong Kim, ETRI

4 Sessions 7th meeting for IG HRRC 1 session 8 participants
March 2016 Sessions 7th meeting for IG HRRC Joint 15/16 meeting 1 session Tuesday AM2 (10:30 ~ 12:30), March 15, 2016 8 participants Junhyeong Kim, ETRI

5 Meeting Accomplishments
March 2016 Meeting Accomplishments Technical discussion Performance Evaluation of Millimeter-wave-based Communication System in Subway Tunnels ( hrrc) Performance evaluation of testbeds of the rail communication system developed by ETRI in Seoul subway tunnel (subway line 8) Coverage test to determine an appropriate RU spacing in the tunnel for demonstration Deployment of the testbed in the Seoul subway line 8 Field trial of the system in moving subway train Demonstration video Discussion on other issues Recent 3GPP’s standardization issues relevant to IG HRRC Junhyeong Kim, ETRI

6 March 2016 Future Plans Updated Call for Interest (CFI) document will be posted before July meeting in San Diego Discussion on the possibility of transition to study group Junhyeong Kim, ETRI

7 Contributions 4 contributions
March 2016 Contributions 4 contributions Contribution #1 ( hrrc) : IG HRRC March 2016 Agenda Contribution #2 ( hrrc) : Performance Evaluation of Millimeter-wave-based Communication System in Subway Tunnels Contribution #3 ( hrrc) : Meeting Minutes of March 2016 Contribution #4 ( hrrc) : Closing Report for March 2016 Junhyeong Kim, ETRI

8 March 2016 Thank you Junhyeong Kim, ETRI


Download ppt "doc.: IEEE <doc#>"

Similar presentations


Ads by Google