Anitha Neve Operations and Interchange Specialist
WIT Update April 20, 2016 ISAS Meeting, Salt Lake City, Utah Anitha Neve Operations and Interchange Specialist
2
Western Interchange Tool (WIT)
January 1, 2014 Transfer of WIT contract to Peak Reliability (Peak) February 1, 2016 Transfer of WIT Administrative functions from WECC Staff to Peak Transfer of NERC CERTS Administrative functions to Peak
3
WIT Contact at OATI Change in WIT Contact
Daniel Rovegno Contact Information Updated on WIT Production Homepage
4
Schedule Change Forms 10 requests since Feb 1, 2016
5
NERC CERTS Inadvertent Tool
Administrative functions for Western Interconnection now handled by Peak Accumulated Inadvertent for Western Interconnection not zero since January 2014 Problem due to consolidation of two BAs Data is correct in WIT CERTS working with NERC Inadvertent Group to fix the issue
6
2016 Bias Values 2016 bias effective date in West
April 5, 2016 at 10PDT/11MDT WECC and BAs bias values were entered in WIT by Peak Did not have the values for Lmax – payback value Left as zero Each BA must enter Lmax values on their own
7
WIT User Group Peak in process to start a WIT User Group
Announcement and draft scope statement issued on April 18, 2016 Each BA will be requested a assign a representative Response are due April 25, 2016
8
WIT Related WECC Drafting Teams
Remove reference to Reliability Assurer from WECC documents WECC 0118 Remove reference to Interchange Authority WECC Interchange Authority Back-up (WIAB): INT-020-WECC-CRT-1.2
9
Anitha Neve