Presentation is loading. Please wait.

Presentation is loading. Please wait.

March 2018 Opening Report Date: Authors: March 2018

Similar presentations


Presentation on theme: "March 2018 Opening Report Date: Authors: March 2018"— Presentation transcript:

1 March 2018 Opening Report Date: 2018-02-22 Authors: March 2018
Month Year doc.: IEEE yy/xxxxr0 March 2018 March 2018 Opening Report Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Steve Shellhammer, Qualcomm John Doe, Some Company

2 Voter Summary IEEE 802.19 has 35 voting members March 2018
Steve Shellhammer, Qualcomm

3 802.19.1 Revision PAR More details available in TGRev Opening Report
March 2018 Revision PAR Ballot Close Date Results (Y/N/A) Recirc #2 March 2, 2018 Recirc #1 Feb 10, 2018 18/0/2 Letter Ballot Jan 4, 2018 17/1/1 More details available in TGRev Opening Report A Sponsor Ballot Pool has been formed Steve Shellhammer, Qualcomm

4 Task Group 2 Task Group 2 will not meet this week
March 2018 Task Group 2 Task Group 2 will not meet this week TG2 may hold conference calls Steve Shellhammer, Qualcomm

5 March 2018 Working Group This week we will have a presentation on Coexistence in the sub-1GHz during the Monday PM2 WG Opening meeting Elections for the WG Chair and Vice Chair will be held during the Monday PM2 WG Opening Meeting Steve Shellhammer, Qualcomm

6 March 2018 Schedule Steve Shellhammer, Qualcomm


Download ppt "March 2018 Opening Report Date: Authors: March 2018"

Similar presentations


Ads by Google