Presentation is loading. Please wait.

Presentation is loading. Please wait.

BASF 4.0: Digital Business Models Scale-Up Approval Decks

Similar presentations


Presentation on theme: "BASF 4.0: Digital Business Models Scale-Up Approval Decks"— Presentation transcript:

1 BASF 4.0: Digital Business Models Scale-Up Approval Decks
April, 2016

2 Prototyping & Validation Planning & Solution Design
For funding, we match INNORATE® with IS Invest Guideline (ZZ) & Project Lifecycle (GS) Main Project Phases & Decisions Prototyping & Validation Scale-Up Explo-ration Ideation 2-3 Months 6-12 Months No IS efforts INNORATE™ No IS efforts Early IS consulting Define Lo-Fi Prototype Hi-Fi Prototype Measure Evaluate Prepare Pilot (MVP) Grow 1 2 3 Investment Guidelines Planning Definition Implementation Project Lifecycle Idea Initiation Planning & Solution Design Execution Owner BASF 4.0 ZF GS Go Hi-Fi PT Get notification Prepare Approval Pre-Study Approval (Appl. B) Ready for Planning Approval Pilot MVP Approval Final approval (MVP) Ready for Execution Grow Approval Final approval (Grow) Ready for Execution Key decision points

3 Prototyping & Validation
There are three key approval steps towards scale-up of new digital businesses INNORATE® Project Phases & Decisions 2-3 Months 6-12 Months Explo-ration Ideation Prototyping & Validation Scale-Up No IS efforts No IS efforts Early IS consulting Define Lo-Fi Prototype Hi-Fi Prototype Measure Evaluate Prepare Pilot (MVP) Grow 1 2 3 Key Approvals Prepare Approval Pilot MVP Approval Grow Approval Approving Instance(s) BASF 4.0 GS BASF 4.0 GS BASF 4.0 Commission I Required Format Approval Deck ‘Prepare’ Application B + Cost Planning Approval Deck ‘Pilot MVP’ Application B + Cost Planning + Benefit Case Approval Deck ‘Grow’ Application A + Applications B* + Cost Planning + Benefit Case *Appl. B (Prepare) + Appl. B (MVP) + Appl. B1-N (Grow)

4 Section Overview 1 ‘Prepare’ Approval 2
‘Develop and Pilot MVP’ Approval – Business Pitch Appendix: GS/COM I - Relevant Information – To be included for Technology Pitch

5 Executive Summary of Approval Request (1/2)
Business Opportunity Example Short description of the business opportunity for the project’s deliverables (2-3 phrases) In the frame of both the OASE customer service orientation strategy and BASF 4.0 vision, the OASE Gas Treating Business has identified specific potential connectivity and interaction points to our final customers which lead us to valuable data and information on their needs and interests on our technology offer, looking forward to an increased customization of the offers for an improved sustainable growth of the business. The main identified connectivity and interaction points are the access to real process conditions at customer’s plants and process optimization possibilities as well as the corresponding state of the OASE solvent at customers site. Further and advanced training on our gas treating expertise has been identified as an important customer need, meaning this for the business a potential service that complements and extents the offered OASE Gas Treating service portfolio. See Documentation Deck: Benefits Benefits for BASF What will the project provide? Direct access to customer data: the knowledge on the customers needs and interests will be enhanced, leading to better personalized, differentiated offers and allows the OASE Team to convert key learnings into better process designs. The OASE Gas Treating Simulation Tool gives the customer the possibility to lower their total cost of operations. By shifting direct trouble shooting possibilities OASE Tech service time can be freed-up to pursue new business Increased customer loyalty: the customer will have a closer contact feeling to the OASE Business allowing it to give a better service and supporting a very good short, mid- and long term relationship. The E-Learning offer will be part of the agreements for the customers and maybe directly or indirectly monetized. Example

6 Executive Summary of Approval Request (2/2)
Objectives/ Deliverables ‘Prepare’ Develop funding pitch deck, i.e. Business Opportunity, Market Analysis, Value Capture Operational Plan, Team Requirements, Risks & Dependencies Business Case Clarify technology requirements (solution design), i.e. tbd Timeline, Resources, Budget Timeline Start date: End date: Resources needed: Budget: Internal: External (Cash-out):

7 High-Level Project Schedule
- Month W1 W2 W3 W4 ‘Prepare’ Activities Prepare Business Approval See Documentation Deck: High-Level Scale-Up Plan “Pre-Study” Business Opportunity Market Analysis Value Capture Operational Plan Business Case Team Requirements Technology Requirements Risks & Dependencies Prepare Technology Approval (Pre-Study) Fill in GS/ COM I-relevant sheets Secure Pre-Study Support from GS Pre-Study Completed/ MVP Approval For details on activities see Appendix p.31

8 Project Team Set-Up and Role Description
Steering BU Sponsor (VP, BU) Samy Jandali (VP, BASF 4.0) Initiate project, sign of results, resolve escalated issues See Documentation Deck: Project Organization “Prepare Pre-Study” Project Owner: Owns the ‘Prepare’ phase, consolidates and develops deliverables, manages other team members BASF 4.0: Provides guidance and supports project owner as needed BASF 4.0 Support N.N. (BASF 4.0) Project Owner N.N. (BU) Business Team Technology Team Own dedicated work stream deliverables Role+Name Role+Name Role+Name Role+Name

9 Scale-up Phase – Project Team Set-up and Role Description
Organizational Set-up Role Description Steering Committee: BU Sponsor (VP, BU) Samy Jandali (VP, BASF 4.0) Steering Committee: Initiates and sponsors project, signs of results, resolves escalated issues, makes go/no go decisions Project Owner: Owns the ‘Scale-up’ phase, has final accountability, requests and consolidates deliverables, distributes workload and manages work stream leaders, reports to steering committee BASF 4.0 Support: Provides on-demand guidance and support to project owner / has no final accountability and responsibility BASF 4.0 Support: BASF 4.0 Manager Project Owner: BU Manager Business Work Stream Lead* Technology Work Stream Lead* Work stream leaders: Own dedicated work stream deliverables, have final responsibility for work stream results, manage respective work stream members Work stream members: Develop work stream deliverables, report to work stream leader Work Stream Member Work Stream Member Work Stream Member Work Stream Member * number of work streams can differ per project – project owner determines suitable number when entering Scale-up

10 Work Stream Charter: Business
Lead tbd Members xxx Description xxx Deliverables Pre-Study Contact Points xx xxx

11 Work Stream Charter: Technology
Lead tbd Members xxx Description xxx Deliverables Pre-Study Contact Points xx xxx

12 Section Overview 1 ‘Prepare’ Approval 2
‘Develop and Pilot MVP’ Approval – Business Pitch Appendix: GS/COM I - Relevant Information – To be included for Technology Pitch

13 This MVP/project is the solution to an important problem of -client-
Problem Statement Our Solution

14 Size Of Related BASF Business
We expect a market share of x% and see significant future growth potential Market Size and Growth Implications Size Of Related BASF Business

15 Our service offering responds to an unmet market need
Digital Ecosystem Digital Service See Documentation Deck: Working Material – Idea Visualization Digital Augmentation Core Product

16 Benefits for Customers
This project benefits BASF and its customers from a strategic and financial perspective Benefits for BASF Benefits for Customers Strategic Benefits: e.g. positioning of BASF as digital thought leader in chemicals Financial Benefits: e.g. additional revenues, higher profitability, lower cost Strategic Benefits: Financial Benefits: See Documentation Deck: Benefits

17 We have successfully validated the market need for our offering
Prototype Description Prototype Testing Example What was tested: Customer Satisfaction Customer Behavior …. How it was tested: x Customer Interviews See Documentation Deck: Description: Prototype Overview Testing: TMRO and Questionnaires Evaluation: Assessment by Criteria xx Prototype Evaluation

18 We will capture value from…
Revenue and Cost Drivers Monetization Model Example Revenues Average Ticket Size USD 10,000 Build on Documentation Deck: Cost/Benefit Potential Commissions 15-25% Average Commissions USD 2,000 SEM: USD2 CPC, Conversion 0,02% CAC USD 1,000 Main Conversion Channels Offline Partnerships, Conversion 20% CAC USD 500 SEO – Content Marketing CAC USD 0 nachbauen Unit Profit < USD 500

19 All technological requirements have been identified – the MVP is ready to be developed
Status Text See Documentation Deck: - TMRO - Success Criteria

20 Our competitive …. will ensure a market-leading position
Competitive Landscape Competitive Advantages 1 xxxx Corporates Start-Up Ecosystem 2 MVP xxxx 3 xxxx

21 With our strategic market adoption approach, we will scale the MVP within x months in x nations
High-level scale-up roadmap Prepare xxx xxx Pilot MVP xxx xxx xxx Grow t M1 M2 M3 M4 M5 M6 M7 M8

22 We expect revenues of x by 201x and a total of x customers
Year 1 Year 2 Year 3 Year 4 Year 5 Performance KPIs # Customers # Units sold ⌀ Value per customer # Employees Revenue Revenue by service/ product category 1 Revenue by service/ product category 2 Costs Personnel (k€) Technology (k€) Marketing (k€) Other (k€) Profit EBITDA EBIT

23 With an additional funding of €x million, we will successfully launch our MVP
Budget Request We need a budget of €x million in order to launch our MVP. Budget Split Personnel €x Technology* Marketing *For detailed scope of Technology see Appendix Our Targets With this funding, we aim to achieve the following targets: No. of users reached x xxx

24 Mitigation Activities
We have managed all associated risks and identified mitigation activities Risks Risk Assessment Mitigation Activities Financial Loss xxx Reputational Loss xxx Management Control Loss xxx Degraded Performance xxx Impaired Growth xxx

25 Our dedicated team with proven track records will make the launch of this MVP a success
Project Core Team Picture Picture Picture Picture Picture N.N. Project Lead N.N. Project Management N.N. BASF Business Unit N.N. BASF Business Unit N.N. BASF Business Unit BASF 4.0 / External Support Picture Picture Picture N.N. BASF 4.0 N.N. External Support N.N. External Support

26 Key Reasons To Support Funding Approval
Additional funding will allow us to scale fast and help us write another success story for BASF 4.0 Key Reasons To Support Funding Approval 1 2 3 Text -Conclusive Statement-

27 Section Overview 1 ‘Prepare’ Approval 2
‘Develop and Pilot MVP’ Approval – Business Pitch Appendix: GS/COM I - Relevant Information – To be included for Technology Pitch

28 Executive Summary Value Offering Value Creation Value Delivery
Key People Involved Motivation Sponsor/ Requester: Program Manager: GS Project Manager: Business Solution Consultant: Business Model Selected Process Model: Idea Phase Results: Value Offering Value Creation See Documentation Deck: BM Canvas/ Project Team Value Delivery Value Capturing

29 Impact On Existing BASF Structure Internal Dependencies
This program impacts the internal organization and requires support across BASF Impact On Existing BASF Structure Geographical Impact Functional Impact Organizational Impact Process Impact Internal Dependencies

30 Project Scope (1/2) Geographical Scope Process Scope
Scope Definition In Scope Out of Scope Geographical Scope Process Scope Organizational Scope Functional Scope

31 Source of Requirements Assumptions & Constraints
Project Scope (2/2) Source of Requirements Stakeholders Documents provided Systems relevant for change Assumptions & Constraints E.g. External circumstances, assumptions and speculations. Also constraints that have to be considered during/for the project.

32 Project Approach Activity Description (Approach, KPIs, special topics)

33 Project Organization Draft Core Team Steering Committee Sounding Board
Head Member 1, Member 2, … Member 1, Member 2, … Core Team Service Operation Project Manager Name PO, Change Mgmt., Communication Applications (GSI/A): SPOC, Service Transition Coordinator, Service Owner Infrastructure (GSI/I): Service Architect Service Desk (GSI/S): Service Architect Member 1, Member 2,… Member 1, Member 2,… WS01: WS02: WS03: WS04: WS Lead Member 1, Member 2,… WS Lead Member 1, Member 2,… WS Lead Member 1, Member 2,… WS Lead Member 1, Member 2,…

34 Key Figures General Figures Technical Figures Other Figures
No. of users No. of ERP Users No. of affected companies Technical Figures No. of affected systems (also see Operations and Service Transition Slides) No. of impacted interfaces Other Figures Any other project related figures with impact on IS project to provide a framework

35 Operations and Service Transition
Impact on Infrastructure E.g. Landscape E.g. Technology E.g. Licenses Service Information Describe the future service on a high level, highlight major changes to the existing service (if applicable) E.g. new service / change of service / (dis-)continuation of existing service e.g. Impact on existing services Support Model Central vs. Regional Support Service Level

36 Global Service Delivery Model (1/2)
Service: service name Service Owner: 1) name of global service owner Level Tier AP EMEA NA SA Service Desk 1st Level Support GSI/S ATOS 1 Applications & Infrastructure Application Infrastructure 2nd Level Support 2 Remote GSI/I 2 On Site 2 User Admin 3 GSI/A TechM 4 Supplier 3rd Level Support 5 Lotus IBM HP Draft

37 Global Service Delivery Model (2/2) Regional Example
Service: service name Service Owner: 1) name of global service owner Level Tier AP EMEA NA SA Service Desk 1st Level Support GSI/S 1 Applications & Infrastructure Application Infrastructure 2nd Level Support 2 Remote GSI/I 2 On Site 2 User Admin 3 GSI/A TechM 4 Supplier 3rd Level Support 5 HP Draft

38 Impact on Ongoing Draft Total Change Ongoing Cost p.a. Depreciation HW
XRM Service Demand In year of project conclusion Region (NA; SA; AP; EU; BASF SE; BBS) Year 1 after project conclusion Year 2 after project conclusion Year 3 after project conclusion Total Change Ongoing Cost p.a. Depreciation HW Depreciation & Maintenance Licenses Depr. Self-dev. SW App. Support Infrastructure (Dataservice) Service Desk Others Draft

39


Download ppt "BASF 4.0: Digital Business Models Scale-Up Approval Decks"

Similar presentations


Ads by Google