Presentation is loading. Please wait.

Presentation is loading. Please wait.

Timing and delays.

Similar presentations


Presentation on theme: "Timing and delays."— Presentation transcript:

1 Timing and delays

2 The costs associated with the implementation of the project during the third quarter is approximately 18,25% of the total budgeted implementation costs and the total costs for the first three quarters amount to approximately 46%.

3 Connecting twinning and implementation processes
Twinning flood maps project EU IPA months contract Flood risk management plan EU floods directive 2007/60/EC Water Act art 26 January 2013 1/7/2013 1: area selection and implementation plan 2: data + models 1: PFRA + APSFR (art. 4+5) HR 5: capacity 3: maps 22/12/ 2013 area 1 area 2 2: maps (art 6) 4: guidelines 26 April 2014 3a: draft (1st) FRMP (art 7) 22/12/2014 12/30/2018 3b: 1st FRMP (art 7) 22/12/2015


Download ppt "Timing and delays."

Similar presentations


Ads by Google