Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAMAS Working Group June 2013

Similar presentations


Presentation on theme: "LAMAS Working Group June 2013"— Presentation transcript:

1 LAMAS Working Group 19-20 June 2013
Agenda Item 3.1 LFS AHM 2015 on work organisation and working time arrangements

2 Recent activities to develop AHM 2015
Tests of model questionnaire By 6 countries: DE, HU, NL, RO, SI, SK 3rd meeting of TF in March 2013 New version of AHM, improved version of model questionnaire with annex

3 Main improvements of AHM
Selection of 11 variables Removal of 3 variables Adaptation of some variables Fine-tuning of questions in model questionnaire Based on results of tests Wording of questions simplified and made more concrete

4 Contents of the AHM 2015 Target group: all employed
AHM refers to the main job Three sub-modules: Flexible working times Methods at work Place of work

5 Sub-module Flexible working times
Removed: NOTICE TF preferred FLEXWT Simplified: VARIWT

6 Sub-module Methods at work
Removed: OWNIDEAS Not concrete enough making it less valuable Simplified: PRESSURE Changed: JOBAUTON

7 Sub-module Place of work
Removed: ICTUSE Severe measurement issues & relevance limited Changed: OTHERLOC Simpler filter

8 Model questionnaire So: use the model questionnaire!
Extensively tested by six different countries Translation issues were taken into account Set of questions is very limited: 14 Questions are straightforward using simple words Applying the model questionnaire improves comparability & is efficient (only translation are required & transcoding schemes are provided) So: use the model questionnaire!

9 LAMAS is invited to Approve the list of variables for AHM 2015


Download ppt "LAMAS Working Group June 2013"

Similar presentations


Ads by Google